Q4 FY2026 · Earnings Call TranscriptMay 8, 2026

Operator

Ladies and gentlemen, good day, and welcome to the ACME Solar Holdings Limited Q4 and FY '26 earnings conference call. As a reminder, all participant lines will be in the listen-only mode, and there will be an opportunity for you to ask questions after the presentation concludes.

Should you need assistance during this conference call, please signal an operator by pressing star then zero on your touch-tone phone. Now I hand the conference over to Mr.

Nikunj Seth from MEFG. Thank you, and over to you, Nikunj.

Nikunj Seth

Thank you, Nirav. Good morning, everyone.

Welcome to Q4 and FY '26 earnings conference call of ACME Solar Holdings Limited. From the management, we have with us Mr.

Manoj Kumar Upadhyay, Chairman and Managing Director; Mr. Nikhil Dhingra, CEO; Mr.

Arun Chopra, CFO; and Mr. Ankit Verma, Head of Corporate Finance.

Now I would like to hand over the call to the management for their opening remarks. Thank you, and over to you, sir.

Nikhil Dhingra

Thank you, Nikunj. Good morning, everyone.

Thank you all for joining us today. I am Nikhil Dhingra, CEO of the company.

I would like to begin by expressing my sincere gratitude to Rajat Kumar Singh for his valuable contributions to the company during his tenure as the CFO. He has decided to pursue career opportunities outside of ACME.

I wish him all the best in his future endeavors. Arun Chopra has now been appointed as the company's CFO, and I would like to invite him to take over and walk us through the highlights of Q4 and FY '26 for us.

Arun?

Arun Chopra

Thanks, Nikhil. It's my pleasure to share the highlights of our Q4 and FY '26 performance.

I would like to start with sector highlights. India has observed its all-time highest peak electricity demand of 256 GW on 25th April '26.

This milestone surpasses the previous all-time high of 250 GW recorded on 30th May '24 and exceeds the peak of 245 GW observed on 9th January '26. The rise in demand is in line with the progression of summer conditions across the country, with electricity consumption witnessing a significant growth of 8.9% during the month of April '26.

India continues to maintain strong momentum in capacity additions, with approx 55 GW of RE added in financial year '26, taking cumulative renewable energy capacity to 283 GW. Total power generation during FY '26 reached 1,845 billion units, with share of non-fossil fuels in total generation reaching 29%, roughly 538.97 billion units.

In a significant milestone, India achieved 50% of its cumulative electric power installed capacity from non-fossil fuel sources in June '25, 5 years ahead of the 2030 target set under its nationally determined contribution to the Paris Agreement. In terms of the regulatory updates, SECI has been notified as single REIA by MNRE, which is expected to drive a more streamlined, focused, and structured bidding framework going forward.

In terms of BESS installation, the sector has witnessed strong regulatory tailwinds. MNRE has clarified that BESS charged from conventional power under FDRE bids can sell power in merchant mode without buyer NOC till the time corresponding RE is not commissioned, speeding up BESS deployment.

Also, CTU has started processing BESS connectivity requests under RoFR, speeding up commissioning, with 36 months of grid charging allowed from the GNA effective date. CERC has issued a draft suo motu order to extend SCOD timelines under the connectivity and GNA regulations by up to 1 year with compensation, giving regulatory certainty to delayed projects nearing connectivity deadlines.

Thus, transmission delay in brownfield projects provides an opportunity to utilize BESS merchant operations. Now coming to our company's performance.

In line with our continued focus on early BESS deployment, we successfully commissioned approximately 2.3 GW BESS capacity to date. These BESS capacities are running on merchant and short-term contracts, capturing the tariff arbitrage between sale and purchase of power during peak and non-peak hours, respectively.

As of date, it is delivering net realization value of approximately ₹2.2 crores per day. Also, from an operational standpoint, the BESS is currently delivering a round-trip efficiency of approximately 88% to 90%, in line or maybe better than our expectations.

In addition to BESS, our operational generation contracted capacity now stands at 2,990 MW. With respect to our under-construction capacity, on order book front, we won 301 MW peak power FDRE projects with SECI during the quarter, expanding our under-construction portfolio to 5.1 GW and total portfolio to 8,071 MW, which will also require installation of around 17 GWh BESS.

Out of the total under-construction capacity, the PPA-signed capacity stands at 3,280 MW. In terms of capital deployment, we have committed total capex of INR 12,475 crores, which includes capex incurred of INR 6,445 crores during the year and purchase orders aggregating to INR 6,030 crores.

Continuing to our financial performance, our total revenue for the quarter stands at INR 705 crores and INR 2,507 crores for FY '26, a 31% and 59% increase year-on-year, respectively, driven by capacity addition and higher CUF. Total revenue for the quarter includes other income of INR 157 crores.

This primarily comprises recurring interest income from cash generated from power sales at SPV until it is upstreamed to SHL. It also includes recurring interest on DSRA balances maintained in line with debt covenants.

Since the DSRA is largely funded from debt proceeds, the corresponding finance cost is accounted for accordingly in the finance cost. EBITDA margin of over 90% both for the quarter and full year on account of favorably operating leverage and optimized operational efficiency.

PAT stood at INR 138 crores for the quarter and INR 498 crores for the year, with a margin of 19.6% and 19.9%, respectively. Now at last, coming to operational metrics for the quarter.

We generated 1,720 million units in Q4, up 13%, and 6,464 million units in FY '26, up 61% year-on-year. Our CUF stood at 26.9% in Q4.

Further, our grid availability and plant availabilities stand at over 99% for the year. Coming to our debt optimization efforts, during the year, we secured financing of around 15,000 crores for various under-construction projects and refinanced debt amounting to INR 3,300 crores for various operational projects, resulting in reduction of rate of interest of the refinanced projects by approximately 150 basis points.

Also, the weighted average cost of debt for the operational projects stands at 8.4% per annum. As of date, 2.2 GW of operational projects have an assigned credit rating of AA- stable.

Going forward, our key focus remains on timely execution alongside healthy order book additions with the following priorities: We will continue to focus on advancing commissioning and operation of large-scale BESS capacity, which will utilize transmission infra of existing operational projects and will run on merchant on short-term basis. Upcoming future operational capacity is expected to have an operating battery portfolio of around 10 GWh along with 1.5 GW of contracted generation capacities, subject to timely availability of transmission connectivity and other external factors.

In terms of order book additions, while we remain focused on long-term 25-year contracts, we also intend to actively participate in short and medium-term BESS opportunities to capitalize on evolving market demand and merchant market dynamics. With that, I now open the floor for questions.

Our team would be happy to take them. Thank you.

Operator

Thank you very much. We will now begin with the question-and-answer session.

Anyone who wishes to ask a question may press star and one on their touch-tone telephone. If you wish to remove yourself from the question queue, you may press star and two.

Participants are requested to use handsets while asking a question. Ladies and gentlemen, we will wait for a moment while the question queue assembles.

Participants, you may press star and one to ask a question. The first question comes from the line of Puneet from HSBC.

Please go ahead.

Thank you so much for the opportunity, and congratulations on good performance. My first question is on your battery side.

Can you talk about how much of the battery cost you capitalized in the previous year and how much have you spent so far in the 2.3 GW that is now fully commissioned?

Ankit Verma

Hi Puneet. Thanks for the query.

In terms of last quarter, this quarter we have done approximately around 1,200 crores of capex on the battery. I think for this quarter, it is still going on, we will update you once this quarter finishes.

In the last quarter, we did around

Arun Chopra

in this quarter so far?

Ankit Verma

How? Current quarter?

Basically last quarter was around 1,000 1,000 to 1,200 crores.

Arun Chopra

Yeah.

How much was commissioned till last quarter? Just in capacity terms as well.

Ankit Verma

1.3.

1.3. Okay.

Second is if you can also give a sense of what is the run rate EBITDA you're making out of your existing capacity with and without BESS so far? So 87

Ankit Verma

87% is our EBITDA for this year. Right?

It is in the range of 88%, 89%. I think

Arun Chopra

91%. 91%.

Ankit Verma

90%.

No, no.

Ankit Verma

I meant

is run rate EBITDA in rupees rupees crore from the 2,990 capacity?

Ankit Verma

Puneet, if you look at FY '26, majorly, whatever this 3 GW is operational, so that was primarily running in '26. Give or take, for the last full year, our EBITDA, including other income, has been around 2,200-odd crore.

This primarily includes revenue from sale of power only, from the PPA projects. However, given that the batteries came in various phases in the last quarter, especially in March, probably the run rate EBITDA you will realize in this quarter itself.

Having said that, like I mentioned, 2.3 GWh is currently operational, and of course, it is running on merchant basis. As Arun highlighted earlier, it is delivering, give or take, average net realization of ₹2.2 crore per day, which is effectively more than 60 crore per month, this capacity which is running.

Arun Chopra

Last quarter there was almost nothing from the battery. This quarter we have In March quarter, there's almost negligible amount from battery because it just was getting started.

It was not even started at various places.

Ankit Verma

Yeah.

So ₹2.2 crore per day on a 2,300 MWh battery, right?

Ankit Verma

Yeah. Yeah.

Okay. Lastly, if you can also talk about how have your new solar plants been operating in terms of PLF?

What was commissioned in FY '25, what sort of PLF did they end up generating for '26?

Nikhil Dhingra

Our Sikar plant basically got commissioned in this year, right? It is doing close to around 29% to 30% CUF for the overall year.

Majority of the projects, Puneet, are in Rajasthan, and roughly that capacity is roughly 2,200-odd 2,200 MW. For the last quarter, I think the PLF has been around 28% plus for these plants.

On a full year basis, 29% to 30% is what you're saying?

Nikhil Dhingra

Sorry?

For full year basis, you said 29% to 30% from the new plants.

Nikhil Dhingra

Yeah. For the new plant it is because we have a higher DC installed there.

It has a higher CUF.

Yeah.

Nikhil Dhingra

For the full year, it's been close to 26% for the entire portfolio. He's asking about Rajasthan.

You are.

Yeah. Got it.

Lastly, there was this SECI ISTS hybrid Tranche-VI scheme, which got a regulatory approval for 3.25, and now it says that there is a battery inclusion. Can you talk about how have the economics changed there?

Nikhil Dhingra

You're talking about

the BESS

Nikhil Dhingra

PPA not yet signed, right?

It got approved, right? That LOA 4325.

Nikhil Dhingra

It got approved, right. Basically what happens is most of the states want battery installation along with the project.

It basically keeps the return in high teens only. It does not impact really the returns from this thing.

Of course we need to satisfy the customer requirement in terms of the power mix they want, because everybody needs peak power now. That is where we need to offer that 1 hour of battery, yeah.

Okay. Understood.

That's all from my side. Thank you so much, and all the best.

Nikhil Dhingra

Thank you, Puneet.

Operator

Thank you. Next question is from the line of Kartik Sharma from Anand Rathi.

Please go ahead.

Kartik Sharma

Hello, sir. Congrats on a great set of numbers.

I hope I'm audible.

Nikhil Dhingra

Yes, please. Yes.

Kartik Sharma

Yes, sir. Just continuing from the previous participant, given the rising concentration of projects in Rajasthan and ongoing transmission and grid constraints in the state, is there any curtailment impact that we've had, and if yes, could you quantify in what happened in Q4 or the full year in EBITDA loss, and how are you thinking about future project allocations like Gujarat or Maharashtra if there is any?

Nikhil Dhingra

Right. Now that's a very relevant point.

The key thing is in terms of the curtailment, where are you connected in terms of the transmission system? We have, you can say, around two projects only out of our whole portfolio which are in Rajasthan connected to the state grid.

Rest of our portfolio by and large is on the central grid, where you're compensated for the curtailment through the regulatory mechanism. In the whole year, and in curtailment also, there are two kinds of curtailments where you don't get a long-term open access, like which happened with our Sikar plant before the full commissioning because the long-term open access was not active.

That is like pre-COD or pre-GNA kind of a curtailment, which is not usually grid-related curtailment. That is where the infrastructure is not yet ready, but you are ready with the plant.

I would not call that a curtailment. Adjusted for that, for the whole year, we have only 5 to 6 crores of impact on the curtailment, which is the real curtailment.

Of course, on STU, it was only 3 crores in Rajasthan for the whole year, state-connected projects, and the 2, 3 crore was on the account of maintenance done by the grid operator on account of, you can say, the O&M which they do for that. That was the impact on curtailment on our project during the year.

Kartik Sharma

Understood, sir. The future project allocation if you could give any?

Nikhil Dhingra

All of our projects are in the CTU. We have consciously built a portfolio with you can say all the central counterparties on CTU.

Also that is another reason we have not gone aggressive on the C&I because they're all state projects. We have to do if you want to serve the actual consumer.

In terms of all our CTU-connected projects with CTU-connected substations, where the customer payments are there irrespective of, you can say, the grid curtailment. They are all on the, you can say, various substations in Rajasthan, Gujarat, Madhya Pradesh, Andhra Pradesh, Karnataka.

Once the long-term open access is granted, then you are protected from curtailment on a CTU-connected substation.

Kartik Sharma

Understood, sir.

Manoj Kumar Upadhyay

Just

Kartik Sharma

can I add my second question? No,

Manoj Kumar Upadhyay

just a minute. I would like to clarify, my name is Manoj.

Most of the CTU-connected project, we are installing the battery. In fact, such curtailment sometimes provides you opportunity to sell the power in the peak or in the evening.

All our CTU-connected plants, that's what we are focusing, all our CTU-connected plants will have a battery available. Whenever that curtailment will happen, we will charge the battery and we will use that power, right, while we will get compensated for the curtailment, but we will use that free power also to charge the battery.

Kartik Sharma

Got it, sir. Thank you.

Nikhil Dhingra

As the battery installation happens, just on that, just to finish that point, as the battery installation happens, the curtailment issue will be further reduced because as more and more battery gets installed in Rajasthan, and it is by and large happening in Rajasthan because they have the largest operational solar, you will see that the transmission system improves a lot with the battery installation.

Kartik Sharma

Understood, sir. You've highlighted that there was a sharp improvement in receivables and the DSO has come down to 14 days, which was at one point in time 180 days.

Despite the significant scale-up, could you help us understand whether this is largely driven by one-time collections or is this a structural shift that you are seeing in the portfolio mix when you say that it's going to be more central offtakers, and how sustainable this working capital profile is going forward?

Nikhil Dhingra

See, our portfolio, as it gets more operational, it is shifting towards 100% central. All of our under-construction projects are 100% central, where they take a cash discount.

They pay in 10 days. Basically in 30 days if you pay, you get a cash discount.

That is where they take a cash discount. That is why we are getting a 15 days kind of a receivable cycle today.

Which is more or less not because of one-off, it is the norm. Yeah.

Ankit, you want to add?

Ankit Verma

Earlier, I think the higher receivable days you're talking about, so that pertains to very, you can say FY '23 and before that. I think that point of time, like Nikhil mentioned, the contribution of central offtaker was less, and there are of course some payment issues, especially from couple of discoms as well, especially Telangana and Andhra.

Even that payment has normalized now, right, even from the state.

Kartik Sharma

Is that the effect that we've seen in the trade receivables, which have gone down 13% year-on-year?

Manoj Kumar Upadhyay

Yes. Actually that there was a regulatory reform which government has implemented called LPS, right?

Under that LPS, Late Payment Surcharge scheme, two, three states which were delayed actually because of the various regulatory issues. There were some court cases in Andhra Pradesh.

All those dues are now settled, and they're paying on time because this LPS scheme is very strict. If they don't pay on time, you inform to PRAAPTI portal and they will get disconnected from the power.

This discipline is helping especially for the state project. Mostly now what has happened, our projects are central projects.

Central projects technically they are paid in just 6, 7 days because they want to take a cash discount.

Kartik Sharma

Understood, sir. Thank you so much.

Operator

Thank you. Next question is from the line of Aniket Mittal from SBI Mutual Fund.

Please go ahead.

Aniket Mittal

Yes, thank you. First question was just on the cash flow.

When I look at the cash flow statement, there seems a very large increase in the non-current assets and some other balance sheet items, which is impacting the cash flow from operations. Just wanted to understand that.

Nikhil Dhingra

Aniket, could you point out which number you're referring to, and what is the number?

Aniket Mittal

If I look at the non-current assets in the balance sheet, I was looking at the cash flow statement. Cash flows from operations have come in lower on a YoY basis, partly I think because the base for last year was higher.

When I look at the balance sheet, there's been a sharp jump in the other non-current assets and also in the other financial non-current assets.

Nikhil Dhingra

Just trying to understand what is in it. Mainly because of the capex buying which is happening.

It mainly includes the capital creditors actually.

Aniket Mittal

Okay. What is the capital advances numbers then?

Nikhil Dhingra

The capital advances is roughly 323 crores.

Aniket Mittal

Okay, 320. This is pertaining to what?

Nikhil Dhingra

This advances is basically given for the procurement of material which has been given to various, and then the material will come in over a period of time. These advances have been given to them, maybe a partial advance let's say 10%, 20% advance.

Let's say battery contracts, we have typically 10% advance upfront, where we get a bank guarantee against it. Similarly, the turbines also we give 20% advance.

These are capital advances you need to give to supplier, where they give you a BG against that.

Aniket Mittal

Got that. This is largely because of battery and probably some wind.

Okay.

Nikhil Dhingra

Yeah. On services and domestic procurement, typically we don't give any advance.

From a international procurement perspective and large equipment, we have to because it helps you to bind the supplier also in terms of the contract honoring and also giving him advance to purchase raw material. Because if you don't pay advance, he will not have money to purchase the raw material.

Aniket Mittal

Okay. When I look at the PLF number on a YoY basis, I see a 1% decline.

What's the reason for that for this quarter?

Nikhil Dhingra

For this quarter, Aniket, could be a function of of course the lower radiation and curtailment. These two could be the only two factors which would have impacted.

On a YoY basis, of course, the larger capacity. It is a larger capacity, of course the denominator is higher.

These are the two only factors because it is determined by seasonality as well. We can give you a side-by-side, I think, analysis.

Broadly, it is because of these factors.

Aniket Mittal

Right. In the presentation within the under-construction portfolio, I also see a merchant BESS of 654 MWh.

Are we putting some BESS purely on a merchant basis? What does this pertain to?

Nikhil Dhingra

Actually it is merchant as of now. It is slated to go to a PPA, which we are supposed to sign very shortly.

Mostly because it is pure battery, which is taking power from the grid and giving to the grid. It can be fitted in any of these peak power projects PPA we have which we have not yet signed with a tariff of either 6.28 or similar, and there are a lot of bids coming in where we can deploy this BESS.

It gives us some flexibility, and we've also wanted to get it financed on a merchant basis because it gives us some flexibility in terms of getting ready for early installation because it does not tie you to a specific PPA. In terms of the financing and in terms of the early commissioning, we have installed it like this.

Of course it will go to a PPA.

Aniket Mittal

Okay. For FY '27, how are we placed in terms of the commissioning of the SJVN FDRE project and the NTPC hybrid project?

Nikhil Dhingra

Right. On the whole commissioning during the year, I would like to explain.

There is a Neemuch substation, which will be the first commissioning from our side because that's the substation which is more or less ready and it will be charged in June. Because the commissionings are determined by the FDRE commissioning since you are asking.

They are determined by the solar connectivity being ready. That will commission our two plants, one is the NHPC and another is the Tata.

That is the first commissioning from our side on the FDRE. Then of course, there's a substation at Fatehgarh, which will have the SJVN whole 570.

That has a short-term open access available right now. The long-term open access as per CTU is in March '27.

The full FDRE for SJVN but will be ready by FY '27 end. That's the FDRE.

The NTPC, we are ready with the solar. Of course there is a long-term open access there also, which is slated to be commissioned by December '26.

Our Pachora wind component is also ready, but that is also slated for, you can say, couple of quarters later. By March '27, all this will be commissioned.

In terms of the other commissionings, there is Pavagada, Ananthapuramu, which are also going to come up during this year as per the CTU timeline. What we are trying to do is commission the batteries at our operational substations in Fatehgarh 1, which we have 1,000 MW, then Fatehgarh 2, which is again the Fatehgarh 1, sorry, is 1,200 MW.

Fatehgarh 2 is 1,000 MW, where we have a STOA. In STOA you can transmit all the battery.

Then we have Bikaner 3, again where bay is ready, you can transmit the battery power. Of course, these, you can say, aggregating to around 2,500 MW of ready connectivity for selling battery power during night is what is ready with us, from where we are trying to transmit 10 GWh of battery during the next of the calendar year.

In terms of commissioning, the battery commissionings are going to happen early because we have ordered battery, the battery is arriving every month. Also in parallel, as and when the CTU substations are getting charged, we will commission the solar also.

In terms of the preparedness, the transmission line, the balance of system, the equipment delivery, they're all on track, and we are trying to be co-terminus with the CTU timelines of these substations, and we also want to prepone our revenue from the battery sales, because from the power sales through nighttime power, which is now allowed as per the PPA construct and as per the clarification given by MNRE. We will see a good jump on the revenue side because of the nighttime installations, which will more than compensate for, you can say, the CTU timelines getting shifted from one quarter to another.

That is the reason we have preponed the battery installation and we are commissioning it at the operational substations and not in the greenfield substations. That is the key thing, and we have 2,500 MW of ready substations and connectivity, which are going to go live in the near future.

Aniket Mittal

Understood. What would be our battery total install base, let's say, 6 months down the line and 1 year down the line?

So

Nikhil Dhingra

10 GWh is our total target, and of course it is completely dependent on a number of factors in terms of the supply of material, in terms of the connectivity, but as far as connectivity is concerned, we can do this 10 GWh because we do have the connectivities. We do have the financing available.

We do have the supplier tie-up available. Of course in terms of the various factors which are interplay in terms of supply of material, in terms of you can say geopolitical factors, those are the only uncertainties.

As far as the CTU-linked is concerned and as far as the other dependencies go, it has much less external dependencies than, you can say, a CTU-connected solar plant.

Aniket Mittal

Got that. I'll join back in the queue for further questions.

Thank you.

Nikhil Dhingra

Thank you, Aniket.

Operator

Thank you. Next question is from the line of Ishan from Antique Stock Broking.

Please go ahead.

Good morning, sir. Thanks for taking my question.

CERC has recently proposed a new mechanism for LOA-based connectivity, wherein the capacities have been delayed for 1 year, there is a surrendering of exit option for those connectivity. Just wanted to know how much of ACME's connectivity inventory falls under this and what is your strategy to these be converted to

Nikhil Dhingra

Right. No, that's a very welcome move from CERC, which CERC has done.

It's a discussion paper right now, and they will formalize it after taking comments from all. That's a good move.

In terms of how it will work is if you are not able to sign PPAs for a certain amount of LOA and the Renewable Energy Implementation Agency really clarifies that these PPAs cannot be signed, then of course that developer is free to develop it in a merchant basis or free to use it in another LOA. As far as we are concerned, we have around 6.2 GW of signed PPA which we are constructing.

Our LOAs are more or less converted into PPA.

3.2.

Nikhil Dhingra

In terms of the construction, three if you remove the three operational for us, we have 3.2 GW of LOA which have converted into PPA, which we are constructing. There is 1.8 GW of PPAs we have won recently, and there are some which are older.

You can say around around 850 MW of older PPAs, which are in various stages of discussions. We we are not anywhere near to that timeline where we the REIA will say that, right, PPA will not be signed, because they're trying their best and all the agencies are trying their best to get it signed.

There are various discussions at various forums to get it signed. Just in case if this happens, these will be for us our strategy will be to to use them for future bids, and or to use them for you can say for for for a battery-connected projects in future.

We will use this connectivity in any case, because we have a good pipeline of PPAs where there is a lot of bids which are coming which are now backed by a solid demand from states, like a thermal mimic which is coming, which will require a large amount of capex and large amount of solar and battery. There are a lot of other bids which are coming, which we will use the connectivity for.

We will keep the connectivity with us, and we don't foresee that our LOAs will we will have to surrender. Just in case it happens, we will have a BESS plan ready by then.

Got it. That's very clear.

Just a follow-up on that and on the industry level only, we have seen around 3 3-plus GW of PPA conversion from LOA capacity. Overall in the industry, there was a huge buildup of LOA capacity.

How do you see what types of capacity are the discom preferring to convert from LOA to PPA? Also, what is your overall view in the RE tendering momentum in FY '27, given that the peak demand is growing strong?

Nikhil Dhingra

Right. The good thing is because of the huge amount of bids which they did, of course more than the demand, most of the developers have a sizable PPAs to execute.

That is giving everybody a sizable, you can say, capex opportunity or a revenue opportunity. Of course, there are a lot of unsigned PPAs.

In terms of the PPAs getting signed and demand coming up, there is a demand for peak power. Which does not have a battery is hard sell as far as the states are concerned.

Everybody needs some amount of peak power at least, if not 4 hours, at least 1 hour, 2 hour. If not, plain solar is the hardest to sell, right?

Some states have a typical demand for solar because they are putting up their PSP or they are putting up their thermal is a bit some distance away. Very few states have a plain solar demand.

In terms of the pecking order, you can say peak power is selling fastest. The partial peak power is second fastest, and then the wind is selling well, but wind opportunities are very less and people are doing less wind, and the solar is selling the slowest.

In terms of the bids for this year, we see that the bids will be lesser than last year, but the PPAs should be faster again because they are not doing bids until the previous ones get at least allocated or signed in some way. The REIA is one, focus will come in terms of there is only SECI which will now be aggregating demand.

They will have some sort of, you can say, aggregation power, which being a sole entity gives them in terms of with the states. They are aggregating demand for, let's say, a thermal kind of tender or peak power tender or a CFD tender, which will find takers because that is purely based demand.

They are doing wind tender, they are doing PSP tenders. There are at least 5 GW of tender currently open with SECI, which is one 2 GW of wind, around some 1 GW of PSP, then there is this thermal mimic, there is CFD.

You will see bids of a level of 15 to 20 GW. Of course, this can change depending on the shortage this year, states can change their behavior, and not all states can afford to do state-level bids because there is little renewable in some states, they'll continue to buy from SECI because of the competitive rates which these go.

Also there are some states which will do on their own, where also they'll be successful, like southern states or Maharashtra or you can say Gujarat. There also you will see some growth and bids coming up.

Like UP recently called for a bid wherein they called for a peak power in their own, where you could charge from anywhere in the country, but the battery installed in their place. Those kind of bids you will see.

A lot of peak power is the something which everybody wants. Bids focused around that will be successful.

Manoj Kumar Upadhyay

I would like to add here that that although the bid size will be one is bid capacities in next year this year, adding state and the SECI will be 20 to 30 GW, but the overall solar or overall the capex requirement will be higher than the last year. Because what is going to happen in the plain vanilla source solar, it is ₹3-4 crore ₹4 crore per megawatt.

The current bid which is happening, for example, mimicking the thermal power or mimicking that long-duration storage solar storage, they will be actually they will carry a very large solar behind the battery. Technically, maybe 25 to 30 GW will technically mean solar of 40-50 GW.

Overall, if you see that the name of the actually configuration of the procurement will change, but requirement of solar will remain 40 to 50 GW.

Nikhil Dhingra

Just to add here, even if you look at the CERC connectivity rules, when they have asked to put batteries, they have made it mandatory to put solar in the 3 years once you take a connectivity. The solar is mandatory to be installed if you are taking connectivity under certain guidelines, like 5.2 regulation.

They also want their connectivity to be appropriately utilized. You'll see battery-linked solar installations coming up very fast, and pure battery installations will be very less.

Manoj Kumar Upadhyay

Yeah.

Sure. Just one last question on the standalone battery.

Just wanted to know what is our expected IRR from that 550 MW project and what is the end-of-the-life value for the BESS in that particular project?

Nikhil Dhingra

The 550 MWh project is currently basically the tariff is adopted with a caveat, it is not yet started. In terms of the IRR for that project you were asking?

IRR is in again in terms of mid to high teens for that project, because there is not much transmission infrastructure to be put. It's a 33 kV level installation.

The zero date for that project has not started for us, we have not really finalized the capex because the state regulator has really asked that on the trading margin of NHPC. Because in this case, it's a pure leasing and they are getting a VGF.

It is in terms of the whether they should get a 0.5% margin or a ₹0.07 margin. That is being debated.

Zero date has not yet started for us. We'll be able to update you once the zero date has started.

Broadly, we're telling you the bid return when we bid it. Also in terms of the end-of-life assumptions, these batteries are basically slated to run for 8,000 to 10,000 cycles.

Right? I think that depends on the PPA, it's a single cycle or a double cycle.

I think it's a single cycle or double cycle? Double cycle,

Ankit Verma

but that's a very small project in the overall portfolio, because this is 550 MWh. Correspondingly, for other projects that we have which are 5 GW under construction, that will require installation of around 17 GWh of battery.

It's more just like the small projects that you're talking about, it's more like a leasing model wherein you are not putting any generation source, you're just storing the power which you are getting from the discom and then you are just discharging the batteries.

Nikhil Dhingra

It's a one bid

Ankit Verma

out of the

Nikhil Dhingra

overall portfolio of 8 GWh. We are not focusing at all on those bids.

Like Ankit mentioned, the batteries which are part of the overall solar, wind, and FDRE mix, the peak power mix, those will be, you can say, 99% of the capex. This is less than 1% of the capex.

Got it, sir. Thank you.

Those were my questions.

Operator

Thank you. Next question is from the line of Dhruv Muchhal from HDFC AMC.

Please go ahead.

Dhruv Muchhal

Sir. Thank you so much.

Sir, if I look at your gross block increase for the year, it's about 3,400 crores YoY approximately, what you've reported, and your run rate EBITDA would have increased by about I think 300-odd crores YoY. It was 1,700 crores last year, and it's about 2,000 crores this year.

The gross block to EBITDA run rate is about 11x, which is very worse off versus what you typically do. I'm just trying to understand what am I missing here.

Nikhil Dhingra

Gross block has increased by, yeah, around 3,000-odd crores,

Dhruv Muchhal

right,

Nikhil Dhingra

in terms of capitalization, right? In terms of what you are not seeing is the, you can say, the wind.

Wind has not really started performing, first of all, because wind is got installed in the In phases. in phases, and

Dhruv Muchhal

Sir, but that's included in your run rate EBITDA of 2,000-odd crores, right?

Nikhil Dhingra

No. See, the run rate EBITDA is basically in terms of the last month, it basically got commissioned at the fag end of the year.

What you're talking about is the reported EBITDA or the run rate EBITDA?

Dhruv Muchhal

No, run rate EBITDA. In Q3, you had reported run rate EBITDA of about 2,100 crores.

I think largely all your projects were commissioned by then, including the wind, probably small portion was remaining. Or is it probably the gross block number includes the battery, which was commissioned by the end of the year, for which the run rate EBITDA is not part of it?

Nikhil Dhingra

Definitely includes Basically the run rate EBITDA is for the 12 months number. I think we don't have that number in this year, because the whole gross block will not be operating for the 12 months.

Ankit Verma

Out of this 3,460 crores, roughly 1,000 to 1,100 crores is related to battery, which

Dhruv Muchhal

Okay. I think that explains

Ankit Verma

capitalized. Yeah.

Dhruv Muchhal

That explains it very well. So 1,000 If I remove 1,000, the gross block is increased by about 2,300, and that explains it.

Ankit Verma

Got

Dhruv Muchhal

it, sir. Perfect.

Sir, the second question is on the MNRE clarification that you highlighted. Now does it mean that for a FDRE project, if you're commissioning a battery early, the charging of the battery can happen through a conventional power, which is now allowed?

Is that the approval which we have got or the regulation which has changed?

Nikhil Dhingra

Yes. It is allowed to be sold in the merchant.

Basically it is allowed to be sold outside of the because since it's a non-renewable power, you can sell it outside not to your offtaker, to anybody you want till the time you are not installed renewable behind the battery. It is not a renewable power, so that is the clarification they have explained, which was already part of the PPA, but they have clarified it.

Dhruv Muchhal

Got it. For example, for an FDRE project

Manoj Kumar Upadhyay

No, just I would like to add it here that even if you have installed the solar panel, if you have not connected with the battery, for example, if your LTA is not right now operational, most of our projects are actually connected with the brownfield of Power Grid substation. That means we can energize our transmission line, we can energize the project well before our connectivity timeline or our PPA timeline.

What we are doing is actually we are installing the solar and we are installing the entire power generation also, but we are not connecting it. Because the moment we connect it, it will be treated as a part of FDRE.

Because right now in the summer, the price is very good. We are not connecting that.

We are just connecting the battery and charging from the grid and selling

Dhruv Muchhal

it.

Manoj Kumar Upadhyay

That is giving us a very good return. We are doing purposely, but the day that COD timeline comes in, LTA date comes in, the whole thing will get integrated and go as FDRE.

Dhruv Muchhal

Got it. Perfect.

Nikhil Dhingra

Dhruv, we are deferring the capex also on the solar side, because it doesn't make sense to call modules at site and keep them there, because what we are doing is we are deferring the solar part of capex.

Dhruv Muchhal

We are not

Nikhil Dhingra

installing the modules. We are because of course, we have

Dhruv Muchhal

You can get it cheaper. You can get the cheaper merchant power from exchanges and Yeah.

Nikhil Dhingra

Also the interest during construction is saved, there is no reason to do a solar capex until your LTOA is operational. We are deferring that also, which is helping us improve our returns.

Dhruv Muchhal

Got it. Sure.

Sir, last question is you mentioned about the commissioning target of your generation assets for this year. If you can give the number, what you're targeting to commission of generation assets based on whatever transmission visibility you have in megawatt terms?

Nikhil Dhingra

We are targeting 1.5 GW of projects in this financial year, right, and around 10 GWh of battery. This 10 GWh

Dhruv Muchhal

of battery

Nikhil Dhingra

may be for those projects which are not included in this 1.5, because for 1.5, it will be maybe 5 GWh, but we are charging the battery ahead of time.

Dhruv Muchhal

Got it. Yeah.

Perfect. Great, sir.

Thank you so much, and all the best. Thank you.

Nikhil Dhingra

Thank you, Dhruv.

Operator

Thank you. Next question is from the line of Dhruvin Shah from HDFC Securities.

Please go ahead.

Dhruvin Shah

Hi, sir. I think my question was answered in the previous question, but I just wanted to clarify the 10 GW that you said we are planning to commission this year, how much of it would be on merchant basis and what is the kind of EBITDA margins that we can expect on these BESS capacities that operate on merchant basis?

That's all.

Nikhil Dhingra

Yeah. See, in terms of all of it will start other than the you can say around 1,200 MWh to 1,500 MWh, which will be commissioned on the FDRE format because of the Neemuch substation, which I mentioned earlier, rest of it will start on the merchant basis in this financial year, because the substations will get start charging in the fag end of the year only.

You will see around 8.5 GWh out of this 10 GWh would be on merchant and 1.5 GWh would be in the FDRE format. In terms of the EBITDA realization, Ankit, I'll request you to

Ankit Verma

Yes. On the EBITDA margin, look, it's a function of at what cost you are procuring and, of course, at what price you are selling.

Assuming a tariff arbitrage of ₹6, which means selling the power at ₹8, which of course more than that we are currently seeing, and purchasing the power at ₹2, give or take, the margin will be around 75% to 80%, the EBITDA margin.

Dhruvin Shah

All right. That was very helpful, sir.

Thank you. Welcome.

Operator

Thank you. Next question is from the line of Aanchal Jalan from Lotus Wealth.

Please go ahead.

Aanchal Jalan

Hello. Thank you for taking my question.

Sir, in the first slide for under-construction portfolio, a total of 3,280 MW plus 1,200

Operator

Aanchal, sorry to interrupt. You're sounding distant.

Can you come closer towards the phone and talk?

Aanchal Jalan

Am I audible now?

Operator

Yes, go ahead. Yes, please.

Aanchal Jalan

Yeah. My question is that in the first slide for under-construction portfolio, a total of 3,280 MW plus 1,200 GWh of BESS portfolio is given.

By when will this be completely commercialized, the whole under-construction portfolio?

Ankit Verma

There is a second slide also, which is PPA yet to be signed. On the PPA side, yeah, these will be commissioned by FY '28.

Manoj Kumar Upadhyay

Battery we are putting up early, like Nikhil mentioned earlier.

Aanchal Jalan

Okay. Yes, okay, sir.

Thank you.

Ankit Verma

Thank you.

Operator

Thank you. Next question is from line of Sweta Jain from Anand Rathi.

Please go ahead.

Sweta Jain

Thank you for taking the question. Couple of questions.

On this BESS arbitrage that we're talking about, using conventional power and then discharging at peak demand, how long do we see that this arbitrage situation should sustain into the future?

Nikhil Dhingra

This is anybody's guess in terms of that it will

Manoj Kumar Upadhyay

Nikhil, let me take this answer. Yeah.

Actually, right now the current calculation of CEA is we need around 200 GWh of battery to come to this if you don't add any more solar. What is happening is also another 40, 50 GW of FDRE and this one where the tender has happened, they will get added in the daytime.

Technically, what is happening, as long as you are adding more and more daytime solar, you need a more battery in the evening. That's a formula.

Right now that formula tells we need a 200 GWh. What has also happened is that the thermal power in the evening, it is already at 6.5 rupees.

If you run at full capacity, and most of the capacity thermal power cannot come up fast and cannot go down, they operate around 60%, 70% capacity. Considering their capital cost, full capital cost in this one, they are at around ₹9 and ₹10.

Battery will remain, my guess is battery will remain at ₹9 to ₹10 in the peak-hour time. As a country, we will need around 2 200 to 300 GWh considering the current installation and the planned installation of this year.

As and when we are adding more and more solar, it will keep on going up.

Nikhil Dhingra

If you look at the last few years, we have seen that the annual price remains at around 7 ₹7 to ₹8 for the last few years, even when we have low demand. In terms of the last few years, we had relatively less demand than before.

Even in those slow years, we had a realization for peak power for around 7, 8 years. Now that the gas is constrained, it is slightly elevated, and it is likely to be elevated.

We are seeing some peak demand which is much much higher than last year.

Sweta Jain

We

Nikhil Dhingra

see that like Manoj-ji mentioned, at least for around 4, 5 years, we don't see this going down.

Sweta Jain

That's helpful. Secondly, sir, on when we mentioned that majority, almost 80% of our projects would be on the CTU side of the business, wanted to understand the transmission and distribution angle.

Are we facing lag in terms of substation connectivity at the STU level or the CTU level from an industry perspective? How do you see the projects getting commissioned when we shift the portfolio to this 80% mark that we're looking at?

Nikhil Dhingra

See, in terms of the CTU substations, what happens is there is a lot of linkages. They They are mostly on time with regards to their local infrastructure regarding bay construction and equipment ordering.

Where they lag is the components relating to transmission line, interconnection, and right-of-way issues, because of which there is a timeline delay at their end. The central transmission utility is in turn dependent on the various various companies which bid for them, they get a timeline basis the delay on their part.

The CTU is a very structured entity where they keep give you a firm date every quarter when their substation is coming up. As far as we are concerned, we plan our project basis that declared date, because that's the obligation on our part to commission the project by that date.

We get extension till the time that thing is coming up. Till date, they have done a wonderful job of, give and take, 6 months delay.

They have done a wonderful job of coming up with the transmission capacity. We have also been in sync with that, let's say, a delay of 6 months.

We also try and sync our capex and sync our work along with that. As a renewable player, we can't really function without the transmission, we have to sync up.

There there by there has been a delay, but for a grid of this size and scale, which is the largest in the world, single grid, I think they have done a good job. So 6 months delay is I think very much should be taken in a good light.

As far as STU is concerned, we are not building any projects on STU. The Gujarat project of wind we did was the only project we have done on the state grid.

There is no project in our pipeline other than that battery we are installing on the Andhra Pradesh, very small, 550 MWh. There is no project on the state grid.

State grid is a different organization structure. Depends on each and every different states.

Some states are more efficient, some states are not. Some states don't have renewable energy potential, they don't really develop their grid as much.

States like Gujarat are quite good, I must say, and of course in terms of getting the transmission up and running on time. It varies from state to states.

As far as we are concerned, state STU are not a factor. As far as our the the portfolio realization and risk and everything is concerned, CTU is a much better place to be in terms of the curtailment and in terms of the predictability of the substation coming up on time and in terms of central grants and monitoring at every level.

Sweta Jain

Got it. Just lastly, our project blueprints already factor in this 6-month kind of a delay on a nominal basis?

Nikhil Dhingra

What we see, typically this can't be generalized. This is on a generic overall portfolio level.

Some substations, you can say around 60% are on time. The maximum delay is typically 6 months.

In some cases, because of some unfortunate event, it could be more. Typically, like I mentioned, our Neemuch substation is on time,

Sweta Jain

right?

Nikhil Dhingra

Some substations are delayed. Not every substation is delayed.

Wherever it is delayed and we know it from now, we will not call for our modules. We will defer our capex.

What we can do about it, I can tell you what we can do about it.

Sweta Jain

We can defer our

Nikhil Dhingra

sizable capex of modules because modules are available just in time and there is sufficient capacity of that available in India. We will not call for modules because it's around 60% of a solar plant capex or in sometimes more.

You don't do that. You keep the service-related work ready, the transmission line ready, the substation ready, because those are typically, you can say, 20%, 25% of the overall project cost.

These are long-lead items. You do that, you don't call your modules, you keep your everything else ready, and that's how you defer the capex.

That is how the industry has been doing and syncing up with the Power Grid or CTU. Also, you get extensions also.

The good thing is you don't get any penalty because of the delay because of this, because and that's how the central renewable program has been running because the in sync with the grid.

Sweta Jain

Sir, just one last question. There would be no risk in terms of PPAs getting not signed or getting the discoms not eager to sign the PPAs from the developer's perspective?

Nikhil Dhingra

See, that's a different question. See, in terms of if you don't have a connectivity, there are two things in PPA signing bit, right?

PPA signing, when you go to a discom, they look for what is the declared date of your substation, right? They look for a declared date of substation getting charged in near term, right?

If you are somebody who has a substation getting charged in 2027, you'll get a better priority from a discom because customers have more visibility to your project, right? If there is somebody whose substation is coming up in if the connectivity he has is for 2029, then he'll get a second priority.

He'll not get a seat at the table, right? Because the state will say, "I don't want power in '29, I want in '27," and there are certain ISTS waivers also which are expiring in 2028.

This determines your attractiveness to the customers, right, in terms of the connectivity date, right? If they get delayed in future, the states also don't get penalized because they are also part of this same sync-up formula where the ISTS waiver also they are eligible for depending on the original date declared by CTU.

That's a good regulatory setup where nobody is basically penalized for the delay on the behalf of CTU. Neither the states nor the developer, right, gets penalized because it is something beyond their control, right?

The only thing which a state needs to take care of when they're signing PPA, what is the declared date of that substation, right? As long as that is '27, they will get the same window of ISTS waiver which is applicable during that particular year even if the substation gets delayed to '28 and '29.

Sweta Jain

Okay. Okay.

That's helpful. Thank you so much, sir.

Nikhil Dhingra

Thank you.

Operator

Thank you very much. Ladies and gentlemen, that will be the last question for today.

On behalf of ACME Solar Holdings Limited, that concludes this conference. Thank you for joining us, and you may now disconnect your lines.