Thank you, Bakul-ji. Good morning, everyone.
I am pleased to welcome you all to this institutional investors and analyst meet today at Mumbai. Today our senior management team will discuss the business and performance outlook of Power Grid based on the recently announced financial results of Power Grid, that is the final result.
Already Bakul-ji has introduced our senior management team. We have with us our Chairman and Managing Director, Shri Burra Vamsi Rama Mohan, and Shri G.
Ravisankar, Director Finance and CFO, Dr. Yatindra Dwivedi, Director Personnel, and Shri Naveen Srivastava, Director Operations.
Before starting, we shall have a small corporate video on the performance of Power Grid. Can we please play the video?
Thank you. Request everyone to please keep their mobile phones on silent mode, please.
Now, I'll invite our Chairman and Managing Director to have his opening remark and presentation, followed by Q&A session. Chairman sir, please.
Vamsi Rama Mohan Burra
Good morning, ladies and gentlemen. It's my pleasure to welcome you all to this analysts and institutional investors meet of Power Grid Corporation of India Limited.
I thank you all investors, analysts, and stakeholders for your continued trust and confidence in Power Grid. Your support has been integral to our journey as India's leading power transmission utility and a key enabler of the nation's energy transition.
India today is witnessing an unprecedented transformation in the power sector, driven by rapid economic growth, imminent increase in the share of electricity in the energy basket, large-scale renewable energy integration, and the government's vision to achieve net zero ambition. In this evolving landscape, Power Grid continues to play a strategic role in strengthening the national grid and ensuring reliable, secure, and efficient power transmission across the country.
I would like to state that the irrespective of what kind of a generation it is, it is the humble conductor which is required for bringing in the mobility to the electricity, and that is what we are in the business. During the last year or during this year, I should say, we have continued to focus on timely project execution, operational excellence, grid reliability, and technology adoption.
We are expanding our transmission network to support renewable energy corridors, green energy evacuation, and emerging requirements of the future grid, including HVDC systems, digitalization, smart infrastructure, and grid stability solutions. Despite a dynamic business environment, the company has maintained strong operational performance and financial discipline.
Our robust balance sheet, healthy cash flows, and consistent dividend track record continues to reinforce Power Grid's position as a stable and dependable value creator for all stakeholders. Going forward, we remain optimistic about the significant opportunities emerging in the transmission sector.
With India's growing renewable energy ambitions and the increasing network expansion requirements, we believe Power Grid is well-positioned to sustain long-term growth while continuing to deliver reliable returns. Before we begin the presentation, I would like to place and record my sincere appreciation for the dedication and commitment of team Power Grid, whose efforts continue to drive the organization forward.
We look forward to an engaging discussion with all of you today and addressing your question and answers and your perspectives after the presentation. May we have the presentation, please?
Right. Gentlemen, I'd like to take note of this disclaimer, including that the annual accounts for FY '25 2025-'26 are yet to be approved by the by the shareholders.
The presentation outline would be covering the highlights and overview, execution and innovation, competition, order pipeline and outlook, financial performance, sustainability, CSR, and recognitions. Going with the highlights overview, I would like to state that on the performance front, the capex guidelines, whatever guidance we have given, that has exceeded.
The capitalization guidance stands exceeded. The system availability stands exceeded.
Firsts, we sure we're also proud to state that we got the first BESS project under the bidding route. The solar generation plant at Nagda has been commissioned.
We have commissioned the world's first 765 kV digital substation, deployed insulated cross arms on the 400 kV tower, showing our focus on reducing the right-of-way challenges and also reducing the footprint of the on the environment impact, indigenously developed 220 kV mobile GIS, international expansion in the PPP mode through Africa50 partnership. On the total structure of the company, would like to say we are still the India's largest transmission utility.
We have breached the ₹3 lakh crore of gross fixed assets. The transmission lines as on 31st March stand at 1.84 lakh circuit kilometer, and then the transformation capacity at 6.24 GVA.
HVDC projects running about 11 projects running, includes both back-to-back and bipole. 1.01 gigawatt of inter-regional capacity out of the total 120 gigawatt inter-regional capacity.
99.84 as the system availability, and comprising a total of 64 subsidiaries. The strong market position and credit profile, would like to state that the market cap stands at 2.75 as on 31st March 2026, 51.34 by the government and the rest by the foreign institutional investors and the domestic institutional investors.
In the credit profile, the highest rating in the domestic front, and on the international front, we are at par with the sovereign rating. You must be aware that the number of SPVs are primarily owing to the structure of the TBCB bidding, how it is undertaken.
Every time Power Grid wins a project, a TBCB SPV is given to Power Grid. In that way, given the large number of SPVs which have been coming, which are 80-plus now, we try to work upon the to bring in a leaner structure and a stronger governance.
17 SPVs have been merged into two other SPVs, and 28 SPVs have been merged into two other SPVs. In that way, we are trying to do it.
The second part of 28 SPVs is processes underway, and given the previous approach by the by the authorities, we look forward that this also will be materializing shortly. On the execution front, 4,765 circuit kilometers have been added in the previous financial year, and a whooping 72,055 MVA, amounting to almost 1 500 MVA in every 2.5 days, and about 13 circuit kilometers every day.
That's the kind of a pace which work has happened over there. Nine number of new substations have been added to the kitty of Power Grid, taking it up to 291.
Few of the few key transmission projects, which include Bhadla, Sikar, Ahmedabad-Lakadia, and interestingly Ahmedabad-Navsari, which is bringing the green power from the from the Khavda region into into the Mumbai area. These projects all the way coming from Khavda, Lakadia, Lakadia-Ahmedabad, Ahmedabad-Navsari, these are the projects which are making sure that the green power is reaching to every nook and corner of the country.
New substations: Bhadla, Ramgarh in Rajasthan, including Dausa, which is done in a record time of eight months after the first foundation being cast; Bikaner-III, KPS-2 and KPS-3, which are Khavda projects; Ahmedabad new substation; Narela in the heart of Delhi, we have new substation has been put up; and Ananthapuramu in the Andhra Pradesh region. As what we have stayed, we're proud to state that whatever capex or the capitalization figures we have given, I would like to reiterate that the capex which was had a guidance of initially about 25, ₹28,000 crore in the initial phase has been subsequently up to ₹35,000 crore, and eventually we could deliver close to ₹40,000 crore.
This actually augurs well as far as the capitalization which is going to follow shortly. The guidance for '27, the initial guidance, I should say, is ₹37,000 crore.
The capitalization front, the commitment was ₹25,000 crore, and eventually delivered as ₹28,206 crore. The guidance for '27 is up to ₹30,000 crore initially.
On the operating front, Power Grid continues to demonstrate its leadership over here, and we are well above the maximum availability which is possible in terms of realizing revenue 99.75. We are way above the mark and continuously deriving the full availability incentive.
On the annual tripping, the other parameter which we closely monitor to make sure the healthiness of the entire system, it stands at a low of 0.26, which is a very good number in terms of both the domestic as well as the international standards. All these were enabled while by infusing new technologies, including AI-based defect detection on the towers, drone-based patrolling, and condition monitoring of the major equipment, including transformers and reactors.
We are proud to also be having this onto our record that the Asia's first transformer with synthetic ester oil has been successfully commissioned, and Power Grid has a significant role in designing this particular transformer along with the OEM. It replaces conventional mineral oil.
It's biodegradable, fire safe, being its fire point being close to or greater than 300° C, and lower environmental impact. We look forward that such kind of a units be developed more and more in the country.
India's first insulated cross arm of 400 kV level. As you can see that on the top of it, what you see there are totally it's a multi-circuit, actual picture on a Maharani Bagh-Narela line, it has four circuits for clarity purpose.
If I say on totally four circuits over there, and of this, the bottom part, the two circuits are on a normal cross arm, the quantum of right-of-way or the width is to that extent. Subsequently, when we put on the or rather when we also on the same tower we put on the insulated cross arm, the right-of-way comes down to that extent.
The total cost of the project, impact on the cost of the project and impact on the environment, everything goes down. These are the solutions which we are actively pursuing, and maybe in the next few lines which are in highly urbanized areas, we look forward that these solutions will be deployed.
These are indigenously manufactured, the insulated cross arms. Another feather in the cap is the 220 kV mobile GIS.
As you see, it is a truck-mounted GIS bay, easily readily to deploy quickly and at any location it can move, and it is trailer-mounted, as you see, easily to be deployed, and it boosts the grid resilience whenever there is an urgent requirement of any bay or during the operational phase or during any any environmental impact in terms of cyclones or anything, if some bay or some particular network is disturbed. The deployment of this would be with such rapidly, and we can restore the power supply.
This 132 kV is already there with us, 220 kV mobile is already positioned, and we are also going to get the 400 kV mobile GIS within this particular calendar year itself. We see that we are going to have a good amount of armor in the asset what Power Grid has so that we can deploy this as and when which are required.
This is akin to the emergency restoration systems what we had for towers. We can claim that these are emergency restoration systems for even for the substations as well.
Battery Energy Storage Systems, the bids which Andhra Pradesh has floated, we were successful in the bid in Kalikiri, and we look forward that this would be giving us a good insight as to how we need to navigate through the BESS model. Interesting to note to the right side is the Integrated Energy Storage System.
CERC, as you are aware, on 20th March has notified an amendment to the existing terms and conditions of tariff regulations, wherein they have also opened up the batteries rather Integrated Energy Storage Systems to be developed by a transmission system developer as well. Taking cue from that, Power Grid has already initiated actions, and we are we had a successful discussion in the northern region part, and then the western region part also the discussions are taking place.
We see that this would open up a new opportunity wherein under Section 62, Power Grid can start implementing projects under the to bring the storage requirements into the country. Global expansions: the first international transmission PPP model, while we had our global footprint in many countries, this would be the first PPP model wherein about $300 million of investment in terms of the project cost, what would go in building the first PPP model by Power Grid.
The company which has been incorporated there is called as the Mwanga Transmission Company and works are taking up in full pace so that we are able to make inroads in the country of Kenya, and which will pave way for different other countries also to follow suit because Africa50 is partnering with us. Along with Power Grid and Africa50, we see that there's a good opportunity to move beyond Kenya and also to other countries wherein this model can be successfully and gainfully be utilized.
Discussions are being held with Uganda, Zimbabwe, Mozambique, and other countries. Depending upon the DPRs which are evolving and the kind of a structure what we have on the regulatory front, I'm sure that this is going to provide a good opportunity for Power Grid.
The TBCB outcomes: in the financial year '26, 28 projects were floated, of which Power Grid had nine projects as success, and the total tariff stands about 44%, and few of the projects which are visible on your screen, you can look into that systems, which includes also an intra-state project being developed by Power Grid for the state of Maharashtra, which is called Pune East, about 300-plus tariff which is that part. The outlook for transmission for the Power Grid and the sector as a whole, if you look, the blue what we can see is whatever works are already in hand, ₹1.7 lakh crore, which includes both from TBCB and the RTM mode.
On the green, which talks about bidding which is in the pipeline, ₹1.1 lakh crore of projects are under bidding. This is not including those projects which are going to come by the different states.
Most of the states are now looking into this mode, this will further add up depending upon the quantum of tenders what the state would be floating. Long-term sector opportunity in terms of CEA projections, in terms of the opportunities in the Brahmaputra basin, and One Sun, One World, and One Grid, which would be coming in the long term, we look that this is also going to be a potential opportunity for Power Grid to develop the transmission systems.
Coming to the first ₹1.7 lakh crore works in hand, TBCB has a share of about 81%, about standing at ₹1.37 lakh crore, RTMs ₹28,000, and other businesses about ₹4,200, a total working up to 1.7. We are not including the Pang-Kaithal HVDC project, which is being reviewed by the Government of India, shortly we should be getting some guidance on that as well.
₹1.1 lakh crore bidding in pipeline: under bidding is ₹1.05 lakh crore, which is comprising both inter-state and intra-state with the major chunk presently visible is inter-state, and we also are actively looking that the intra-state also number of projects are massively increasing there. To be floated primarily under the intra-state is 5,270, taking the total to ₹1.1 lakh crore for which bidding would be possible.
Major projects include Rajasthan Barmer complex, that is phase four, Vizag green hydrogen, Jam Khambhalia, Krishnagiri, Lakadia, ER-WR inter-regional network, and the Navada-Durgapur system. Strategic drivers powering transmission investment cycle on the domestic front: as I said that the anchor program by the Government of India, 900-plus gigawatt by 2036, this has a potential about ₹7.9 lakh crore, which includes both inter-state and intra-state transmission systems, including the evacuation needs for meeting the load requirements of green hydrogen.
The hydro potential of about 76 gigawatt in the Brahmaputra basin, we see that this also adds up to ₹6.4 lakh crore in two phases. New demand centers in terms of data centers and green hydrogen further adds to about requirement of 71 gigawatt being transported, which, as I already said, obviously it should be a transmission system only which would help in evacuating these systems.
Either be it a new generation or it be a new load center in terms of data centers, green hydrogen, or so, the ingredient or the essential or invariable ingredient would be the transmission sector. I see a good opportunity in this front as well.
On the global front, One Sun, One World, One Grid: as part of that exercise, whatever studies are being undertaken, I'm sure that this also will fructify to make sure that new opportunities open up for the country and Power Grid in particular. Intercontinental cross-border links: India-Sri Lanka, Maldives, Mannar, and UAE, Saudi Arabia, India-Singapore, these all are being discussed, and as and when the traction is there for it on the higher level, I'm sure that this also would be materializing.
Upcoming HVDCs: 22 numbers of HVDCs are in various stages of bidding and planning. Total HVDC schemes envisaged are 22 and combined with a total HVDC capacity of 127 gigawatt.
Presently the Barmer-II and Khavda- Kalam project which is under bidding presently, and the other projects from different generation points are identified, and as and when the load center is identified, these projects also will be fructified. Brahmaputra is already stated with the the number of basins where the generation can happen, good number of HVDC, six number of HVDC projects are also being envisaged here, apart from the cross-border under sea links of India-Sri Lanka.
Paradip-Andaman also would be the links which are in the pipeline. Financial performance: the total income for the financial year stands at ₹47,684 in comparison with the total income of financial year '25 as ₹47,459.
You need to factor in the the natural trajectory of the RTM projects, which we need to be focusing that. The natural trajectory for the RTM project is that it is always on the downside.
It it comes down and it moves on basis the O&M charges. As and when this trajectory is having a major major dip, that is reflected, and in this case, almost 1,700 on account of depreciation and others have been covered up in this year, apart from the previous year's almost ₹750 crore on account of various additional revenue which has happened on account of our additional spares, or maybe 26% stake sale what has happened, and such kind of a and also the surcharge, PSIT sales award what we have received from the regulator.
All this put also has added another 700 in the previous year. All this gap of 1,700 and another 700 dip, all this has been covered well in this particular financial year, apart from the massive capitalization which has taken place in this year, which would be actually reflecting in the revenues in the years to come because this happened primarily in the later part of the previous financial year.
The current financial year, that is 2026-2027, would be witnessing the complete fruits of that particular capitalization. The profit after tax stands about ₹15,928 crore, which is a 3% increase, all this on the consolidated basis.
Similarly the the financials on the standalone basis, the PAT stands at about ₹15,921 crore, which is 4% increase from the previous year. The gross fixed assets, as I've stated that it has breached the ₹3 lakh crore, and it stands at ₹3,20,334 crore.
Net worth also has breached the ₹1 lakh crore, standing at ₹1,00,494 crore, ₹1,00,494 crore. Then the return on net worth with the increased net worth naturally stands at 15.85.
These ratios are primarily indicative of a company which is in a growth phase, in a massive growth phase. The income for previous periods, FY '26 stands at 617, interest on differential tariff at 705, interest from subsidiaries 3,350, incentive consolidated 664, dividend from JVs 145, dividend from subsidiaries 1,516 crore, CSR expenses 351, FERV 1,277, equity in TBCB and equity in TBCB both operations and under construction which are there, and which stands about 9,558 and 2,502 respectively, short-term loan ₹7,000 crore.
As I said, all these figures are indicative of the the structure in which Power Grid is having multiple subsidiaries for TBCB and also the growth phase of the company as a whole. On the collections front, pleased to also share that strong collections are happening on this in the previous financial year.
We see that as against ₹40,201 crore, ₹40,684 has been realized with the new LPS rules and all kicking in. As against the ₹4,795 crore outstanding in the year financial year '24, it is now standing at 2,905, standing means with the kind of efforts being put by the by the company and also the the provisions which are there for us to realize this.
Interesting to note also that the outstanding more than 45 days also has, which is in blue, represented in blue, is also significantly reduced. On the consultancy and telecom front, if I take up the telecom front first, the revenue is increased from ₹1,128 crore despite the high level of competition in the telecom sector, it is still growing steadily at ₹1,195 crore.
Happy also to announce that Power Grid is also able to provide the highest 400G interface for the telecom sector, which is the highest level in the country. The massive amount of data which can be transported on a single interface is now available in Power Grid, and it's also in operation.
The first ever international long-distance link has been delivered to Bhutan, and we are poised to take up more such international requirements for telecom as well. The pilot data center, the 1,000-rack data center which we are building at Manesar is going to be visible within the next quarter, and we are seeing great opportunities and a lot of traction in this government-owned data center being established by Power Grid.
The availability of telecom continues to be one of the finest with 100% backbone availability. Consultancy: ₹799 crore, which was standing at financial year '25, now stands at ₹1,755 crore.
On the domestic front, 39 orders and ongoing projects at 62. On the international front, eight orders and 25 countries having footprint of Power Grid.
We are also keenly looking into pursuing opportunities in South Asia, Middle East, Africa, South America, Europe, and Australia. On our commitment to ESG goals: glad to also inform that the targets what we set for 2025, that 50% of the electricity consumption would be from RE, has been well achieved much before the completion of the year.
The net positive in terms of water, what we aim to achieve at 2030, we are more than halfway mark with 55% already done through. Zero waste to landfill, landfill we are almost 90% is what we are already presently there, and we are inching forward to reach our goals.
Net zero emission status by 2047, we are confident that we should be able to achieve this much before the target date. Various sustainability initiatives what we have taken up during our journey is initially the first sustainability report way back in 2009, and thereafter the world's first 400 kV shunt reactor with natural ester oil, and then the ESG water and waste policies have been adopted, and '23-'24 the anti-bribery system in position, '24-'25 the first ICT with ester oil, '25-'26 the first 315 MVA synthetic ester oil which has been commissioned, and also the 85 megawatt solar PV.
ESG rating stands by NSE as 70. We have nine substations which are by and large manned by women.
Transmitting smiles through corporate social responsibility, that is our tagline. Major thrust areas are in health and nutrition and PM internship, skill development and employability, rural development and environmental sustainability, education and women empowerment.
On these focus on these major fronts, we are having a good amount of spend as far as CSR goes. We've received a good amount of accolades, few of them only have been narrated here.
As you can see, it covers both HR, on the technical front, and also on the CSR initiatives. The Scope Eminence Award, the and the we are ranked first in the International Transmission Asset Management System also, and the People L&D Excellence Award for using AI in learning, Green World Award for climate change initiatives being undertaken by Power Grid, and we are ranked first in CSR category by ICC, and Best Organization for Women conferred by Economic Times.
Thank you so much for your patient hearing. This is the actual picture of the 400 kV multi-circuit line, which is to Maharani Bagh-Narela.
Four number of circuits of each of 400 kV line are there. If you can see a small speck on the road which is in white in color, that is the size of the vehicle which is standing there.
You can see the massiveness of the entire structure which stands over there. Thank you.
Moderator
Thank you, Chairman sir. That was indeed very detailed and very, very precise presentation.
Deeply appreciate. We now move to the next segment, which is Q&A.
I would be moderating that. Request each one of you to raise your hand, introduce your house and then yourself and then ask the query.
Yes, sir.
Good morning, and thanks for the opportunity. My first question is can you please explain the reason for EBITDA decline in Q4 FY '26?
Is it due to older assets completing 12 years of life? Can you also please shed some light on the accounting for the new transmission system?
Are you booking everything on service concession accounting? Are you booking the newer transmission system on the service concession accounting method, yeah?
Especially new TBCB. That's the first question.
Vamsi Rama Mohan Burra
You're partly right in your question itself. You have been asking that whether the EBITDA pattern is because of assets completing 12 years and all.
Yes, to the extent of that the structure of the regulated tariff has a trajectory wherein after the 12 years, which you're aware, there's a dip in those projects which it is there. This is a natural transition which happens over there every time, and this is one of the transition which is a major transition which happened for a major project.
Yes, it is so. As far as the service accounting part of it, yes, these projects are under the BOOT method, the new projects which are being floated on the BOOT method, and the financial lease model is being followed for these projects.
Understood. My second question is it possible to help us with the capital expenditure target for FY '27, FY '28, and FY '29, given the list of projects?
Also, you can similarly help us with the commissioning expectation for FY '27 and FY '28, commissioning number, capital expenditure and commissioning?
Vamsi Rama Mohan Burra
As I've already shown in the presentation, for FY 2026-'27, the initial guidance what we are starting is about 37,000,
what we are starting it here, the initial guidance. FY '27.
FY '28, sir?
Vamsi Rama Mohan Burra
Pardon me?
FY '28?
Vamsi Rama Mohan Burra
FY '28, naturally it would be going beyond 40s. The initial guidance, again, as I'm saying, it would be beyond 40s and in 40, 45, 40, 45 ke range mein, it will be standing there.
All what has been capex jo hua hai, uska the capitalization also would be shortly following. We are initially giving a guidance about 30,000 for the current year, and then next year, it should be moving up to 35.
Understood.
Vamsi Rama Mohan Burra
35. As we move forward, as we move into the year, more of clarity will be coming.
As last time, as what we already said, the initial guidance was given as 28,000 for the capex, and eventually achieved close to ₹40,000 crore. All this would be happening hopefully this year as well, with the quantum of efforts what we are putting and also streamlining the activities, and I'm sure that we should be able to meet the guidance what is being given here.
Understood. Thank you, and all the best.
Moderator
Can you also let us know your organization name and yourself so that Chairman sir knows that?
Vamsi Rama Mohan Burra
ICICI. Thank you.
Yes.
Yes. Hi, thank you.
This is Puneet from HSBC. My first question is if you can shed some light on your BESS strategy.
You talked about Section 62 also in play here. How do you intend to grow this piece of the portfolio?
See,
Vamsi Rama Mohan Burra
BESS is coming on two fronts. One is by the VGF being given by the government.
States have been rushing to float a good number of tenders on the BESS front over there. Power Grid also is participating so that we understand the kind of model, mode, and what kind of an ecosystem is there in trying to put up these systems.
As I said, one of the project which we have won, thus will give us a good opportunity for having an insight into the BESS projects. That is one part of it.
That is under the 63 mode, if I say. When we come to the 61 and 62 sections under which the tariff is under the regulated model, pleased to also inform that the regulator and its terms and conditions of tariff amendment, which is issued recently, also calls for that the transmission service provider can put up the Integrated Storage Systems.
As part of it, the exercise what has to be done, the kind of documents what have to be furnished, the locations which have to be selected, the cost-benefit analysis, all these things have to be done, and we have already done this. In terms of northern region, we already submitted all our details, and we see a very positive traction on that front.
For the other regions also, it will follow suit, and given the massive requirement of the storage requirements, we feel that Section 62 would be a very conducive way to create the ecosystem so that eventually these projects or these systems can be developed under the Section 63 mode. We see that this would be actually paving a good way for the system to be built in the country.
The OEMs would be having that much of a visibility, predictability. We see that moving forward, if it's gaining traction, Power Grid would also be taking it up, and we already started for your information.
Do you have a target capacity in mind for this over next three years?
Vamsi Rama Mohan Burra
I would say not immediately now, but once we get a clarity upon how these provisions which have been identified in the new regulation, because all the stakeholders will have to look into it, the moment the clarity comes on it, I'm sure we should be able to give you these numbers in the next revision. We should be able to give you these numbers.
Understood. Secondly, on the right-of-way, there were some challenges last year, some amendments happened on the compensation.
How are you seeing that moving ahead? Has it significantly improved, or you still see a lot of challenges on RoW?
Vamsi Rama Mohan Burra
See, RoW, right-of-way is always a perennial issue. Every tower is a project in itself, and it is not unique to Power Grid.
It is unique to every transmission service provider. It is not only that RoW is for a particular segment, it is there.
Now that it is there, the government has come up with an initiative since 2024 and 2025. It has come up with market rate determination, because earlier the right-of-way charges were paid for a quantum of area, but the rate what was applied for that particular area was primarily the circle rate, or any other rate which was known to them.
Now a mechanism has been given by the central government. Guidelines have also been issued saying that this will be a market rate determined kind of a mechanism wherein valuers would be identified, and valuers will be independently valuing that area, and more than one valuer, that is three valuers will be identified, wherein they look forward that it will emerge the right rate.
The moment the right rate comes, we are sure that the landowner to a great extent will be willing to part the land for construction of the line, both under the tower as well as the corridor. Just for your knowledge, I should say, for a tower, it is 200% of the area of the tower what we are paying, and for the corridor where the conductor runs through from tower to tower, the entire right-of-way, we are paying 30%, 45%, or 60%, basis the quantum of urbanization which has happened over there.
That is also clearly defined. In order to speed up the process, specific timelines also have been issued so that not only the provisions, but also timelines also so that the outcome of the MRC rate is done quickly so that the right-of-way challenges up to that extent mitigated.
Understood. Lastly, on the intra-state TBCB projects, you talked about 17 projects under bidding.
How are you thinking about that? What all states would you bid, and what are the risk mitigants, given it's not as easy to collect as ISTS?
Vamsi Rama Mohan Burra
That's quite an interesting question, I should say. Inter-state has a system of point of connection charges.
You have the PRAAPTI portal wherein the payment security mechanisms are well taken care of. Having said that, as far as the intra-state goes, similar provisions in terms of regulation of power supply are also available in the document, and we are also given guidance that the PRAAPTI portal also should be because through one particular amendment, the inter-state transmission licensee has been removed and it's only defined as transmission licensee.
We see that all this portal going forward would also provide good strength as far as the payment security mechanism goes. Then there are challenges, again.
Intra-state also still requires transmission lines. Right-of-way would be there, and as what we see, there should be good support from the government front as well to clear the right-of-way, which we are seeing a lot of support being provided by the central government, and the state administration has also played a very vital role in most of the projects seeing light of the day.
Understood. That's very helpful.
Thank you so much, and all the best.
Vamsi Rama Mohan Burra
Thank you.
Moderator
Over here.
Amit Bhinde
Hello, sir. Amit Bhinde from Axis Capital.
I just want to understand what is the difference between the gross block that you would have made on the capitalized asset versus the NCT cost in the project that you commissioned in FY '26? Similarly, if you can give some inflation indicative number on the capex part as well that you're incurring?
That's my first question. Come again.
Vamsi Rama Mohan Burra
Come back again.
Amit Bhinde
If you can help me understand the variance between the actual gross block that you will be recording on the balance sheet of the projects that's your capitalized versus the NCT cost, to understand the inflation on impact, all right.
Vamsi Rama Mohan Burra
Okay. The NCT cost is merely a number which is derived much before the project is implemented, without going to the details of it.
Whereas the cost what we undertake in our bidding has to a greater exercise has been done over there. That is the cost what we go ahead while starting a project.
The real cost of a project is known only after completion of a project, whoever be implementing a project or whichever be the infrastructure, the cost of the project is known only after completion. Your question is what would be the difference between the NCT cost
Amit Bhinde
Approximately if you can give the variance, 10, 15% or so.
Vamsi Rama Mohan Burra
It varies from project to project. We cannot specifically say how much it would be there.
Rest assured that whatever cost we have been taking up, with the quantum of experience what we have in this sector, all costs are factored well, and in case if there are costs which are surprise to us in terms of something which we could not fathom at the beginning of the project, in terms of force majeure, change in law, we see that these are also being properly addressed as part of the transmission service agreement.
Amit Bhinde
Right. The second question that I have is the bidding pipeline that you mentioned, in that if you can give some color around the timeline as to when are you expecting most of this to come in Q2, Q3, etc., if you have some visibility on that, and any slippages risk over there?
Vamsi Rama Mohan Burra
I think this question would be better to the planner. Please understand there is a planner
Amit Bhinde
who
Vamsi Rama Mohan Burra
decides these activities. We would be asking the similar question to say that when are these projects coming, because we are a developer now.
Amit Bhinde
Right,
Vamsi Rama Mohan Burra
we are a developer now. Having said that, the timelines are very well known, they are very well documented as and when the RFP comes.
In case if they have a challenge in finalizing it because of the offtaker and all, there could be a shift in a couple of months. By and large, the projects once they are envisaged here have seen the light of the day.
Amit Bhinde
Right. Thank you.
Namit Arora
Hello. Thank you, sir.
This is Namit Arora from Indgrowth Capital. Sir, my question was around TBCB.
Now, you mentioned two statistics. One is that the number of projects you won this year and also your market share since inception of 44%.
If you could give us some background on are you seeing competitive intensity increasing for TBCB projects, and in terms of your discipline in terms of the tariff or the IRR that you look at, and going forward, do you expect similar market shares or success rates in the TBCB projects? Sure.
Vamsi Rama Mohan Burra
I would say that we have been in this sector for quite some time, initially under the cost-plus mode, and it is more than now 14 years since we are into the tariff-based bidding. While undertaking the bids, we take into the quantum of risk-return framework of that particular project, and then we go ahead, so that we are able to create value for our stakeholders.
Keeping that in mind, whatever projects we are picking up, by and large would be focusing on that to make sure that the value for the stakeholders is ensured always. That's what I should say that.
Namit Arora
Got it. Sir, and my second question was, in terms of the annual tariffs, most of your projects are ₹100 crore-plus, the ones that you won, but there are a couple of small projects also.
In terms of your bidding, do you remain open to all projects that come out? Also when the planners are designing, do you expect that the minimum size of the projects might go up or they might be some small projects as well?
Vamsi Rama Mohan Burra
Okay. I should say that the smallest project which we have touched was somewhere about ₹60 crore also.
The cost of the project was ₹60 crore also initially. The planners slowly realize that what should be the size of the project.
For intra-state, as you must be aware, intra-state, there are thresholds which are defined by each of the state. They have given 150, 250, depending upon the state.
That is for the intra-state. For the inter-state, we have the set of framework under which we have all the three: the CTUIL, the NCT, and the Ministry of Power.
They determine what should be the size of project which has to go into the TBCB. As far as that what is determining that, it is that particular entity which identifies it.
Whatever be the size of the project, the quantum of activities involved are the same, and we are not indifferent to a smaller project or a larger project. We are more, as I said you, we look into the total risk-return framework of that particular project, and then we go ahead for it,
Namit Arora
so
Vamsi Rama Mohan Burra
that we are ensuring that the value to the stakeholder is always intact. Right.
Namit Arora
Thank you, sir. My final question was around technology and innovation, both for asset management as well as for new projects.
While you are using a lot of technology, if you could give us some background, let us say whether it's drones or new technology, both for asset management, given your very large network, as well as for new project implementation, specially considering that you operate in very difficult terrains also at times. In terms of innovation and technology, is it at par with what's being done globally, or are there some more innovations that you are considering to enhance your asset management and new project implementation capabilities?
Vamsi Rama Mohan Burra
Thank you so much for asking that question. As you understand, as the size of the network grows, which is in operation, and the intensity of project implementation also grows, we have big challenges in both the ways.
One, what is in hand, it's massive, and what we are growing is also it's in a massive structure. We need to actually, with the quantum of manpower what we have, we are very keen and focused upon bringing in new technologies to make sure that at no point of time is my operational parameters are low, or continue to be high, and at the same time, the project implementation is to at the best.
As far as the operational part goes, Power Grid has been one of the initial inroads what we have made in trying to not only have more of a technology-driven, but also AI-driven approaches in trying to identify the shortcomings or the defects before they really materialize into a massive impact on the system, we are able to detect them early and rectify them and take action at an early stage. With this approach, we are having a good amount of AI-driven technologies and unique applications developed by Power Grid only.
Not elsewhere, unique applications which Power Grid has, both in terms of towers as well as the major equipment, we do have this. We are also moving more towards reliability-centered maintenance, this would be the one of the first in the world what we are also looking at.
Apart from that, we are looking into indigenization of one of the solutions, software solutions, which would also help the country in maintaining the security aspect. As and when we move a lot of IT into the system, you need to balance it with the adequate cybersecurity aspect as well.
Taking care of that, we are moving as far as the operational front goes. On the construction front goes, we are no longer in that initial primitive stage understanding the status of a project.
We have the entire streaming, live streaming of all the projects are available. We have a monitoring team wherein we look into the projects.
Sitting in our control room, we can see all the projects, what is the status of it, not only merely the projects, the status is also updated on a handheld device. With Power Grid only developed that app, wherein all this data is coming, and there is one single truth about the project so that we know what action has to be taken, and timely action is taken to make sure that the project is not having any time or cost overrun.
With these initiatives, we are confident, and also including the transparency in quality and all, which we are bringing in, all these things will be positioning us in a good stead, not only in the growth of the company for new projects, but also maintaining the operational excellence what we already have.
Namit Arora
Superb, sir. Thank you for your very detailed answers,
Vamsi Rama Mohan Burra
and
Namit Arora
all the best, sir. Thank you.
Moderator
Go ahead.
Archit Singhal
Hi, sir. This is Archit Singhal from Bajaj Alternate.
Two questions. First, you mentioned on a slide the opportunity size of ₹15 lakh crore, right?
We are doing annual capex of around ₹40,000 crore as of now. Is it fair to understand that maybe three years from now, the annual capex number itself can increase to 50, 60, or 70,000, or is that a too far-fetched an assumption?
Vamsi Rama Mohan Burra
It's not far-fetched. As and when these things materialize, understand transmission is an offshoot of the generation and load.
I would have said a few years ago it is generation, but I would say it is an offshoot of generation and load. The quantum of transmission evolution depends upon how much of generation is happening and how much of new load centers are coming up.
As and when those are materializing, it is no option, but transmission will have to happen. Because as I've said you, transmission is the only way how electricity can move.
You cannot take it in a tanker. I'm sure that as and when the generation comes up in new locations and the load center is coming, it is a common denominator for everything.
Whatever be the nature of generation, including nuclear power or whatever it is, because electricity is a fungible good, and transmission is a neutral carrier.
Archit Singhal
Sir, linked question is, as execution is picking up, capitalization numbers are improving, fair to assume that the earnings growth for the next three years will be significantly better than what it was for the last three years?
Vamsi Rama Mohan Burra
You are not wrong.
Archit Singhal
Okay. Perfect.
Sir, second question on the HVDCs, you mentioned 22 are in various stages of planning and bidding. What is the time period we are looking at these 22 HVDCs to come?
Is it every year we can have two to three HVDCs coming for the next six, seven years? Again,
Vamsi Rama Mohan Burra
as I've said you, one of the gentlemen who has asked, this is a planner who will have to identify this question. Having said that, that's a disclaimer.
That's a planner who'll identify it. Having said that, it all depends upon the many aspects will have to be fixed in for a particular system to be evolved, a transmission system, more so a HVDC system also.
Meaning that the potential generation center, the potential load center, the timing what has to come, and then the number of OEMs who are willing to provide the solution in a particular timeline, should we take it, because now to get the HVDC system in a matter of one or two years is not possible, you need a longer perspective. Factoring all these, only then the solutions will be emerged.
As and when they come, definitely there will be enough time for all of us to understand it, and we also require the time to undertake our bidding. It will come.
These projects are there, and they will become visible as and when we move forward. It will happen.
Archit Singhal
Got it.
Vamsi Rama Mohan Burra
Thank you, sir.
Subhadip Mitra
Good afternoon. Hi.
Good afternoon. This is Subhadip here from Nuvama.
My question is more around the macro ordering. I understand that in some of the past interactions that we've had, you alluded to a number of somewhere between ₹80,000 crore to ₹1 lakh crore of annual tendering opportunity that can emerge.
If we break up that ₹9 lakh crore, let's say out of that, maybe ₹3 lakh crore already ordered, another ₹6 lakh crore left, probably over the next four to five years, roughly that's the number we come to, and you can correct me if my math is wrong. Taking that into consideration, do you see an upside to that number, that opportunity can be higher than this number?
Secondly, as a derivative of that, once Power Grid reaches an annual capex of, let's say, around 45, ₹50,000 crore over the next two years, is there a further upside to that number, or do you think that number can stabilize somewhere around that ₹50,000 crore mark? Okay.
Vamsi Rama Mohan Burra
The share of electricity presently in the energy basket is about 22%. With the ongoing crisis and more emphasis on the electricity having a larger share, you'll be getting obvious answers where we should move as far as the electricity goes.
If electricity's share increases in the energy basket, obviously the transmission also will have to follow suit. The answer for your first question that whether it will grow, yes, it will have to invariably grow, given the kind of conditions where we are in.
Apart from that, a significant amount of intra-state is also coming under the tariff-based competitive bidding, meaning there more tenders are being floated as we speak. We see a opportunity only increasing.
The bubble is increasing more and more. I'll not say bubble, but then the entire horizon is increasing more and more, giving us more opportunities for us to dwell in.
As we see that the opportunities grow, naturally then the top line also can't be left behind. It will have to grow.
Subhadip Mitra
Understood. Specifically on the intra-state piece, within this ₹6 lakh crore opportunity, would you say that the intra-state is roughly 50% of that?
Is that a right, let's say, thumb rule to go with?
Vamsi Rama Mohan Burra
No, no, no. It could be, see, these projects will have to evolve eventually.
Most complex part of it is that the cost of the intra-state is not predefined anywhere. It is not stated.
It is only a fraction sometimes of the total project cost. Being guided by that particular number may not actually yield us any particular figure over there, but safely we can say that there is a good amount of opportunity in the inter-state and also a good amount of opportunity on the intra-state, because these two will have to go hand-in-hand, because we cannot simply develop an inter-state and leave the intra-state just like that.
They have to grow and they will grow together.
Subhadip Mitra
Duly noted. Last question: on the HVDC side, while you did answer I think in the previous question, from a near-term tendering and opportunity perspective beyond, let's say, I think the Barmer line, are there, let's say, a couple of more projects that you see visibility of over the next 12 to 18 months on HVDC?
Vamsi Rama Mohan Burra
Yes, it should be, as I've said again, it would be the planner who would be deciding it. As you understand, the planning activity is done by a different entity.
As and when it converges, it will come through. It should happen, because wind power being generated and we need long-distance evacuation systems, they will follow suit.
Subhadip Mitra
Perfect, sir. Thank you so much.
Vamsi Rama Mohan Burra
The mic over there. To the right side, yeah.
Nikhil Nigania
Hi, sir. Nikhil here from Bernstein.
I just had one question. Now 80% of our work in hand is TBCB, and since we've won these projects, every single cost head has gone up, whether it is conductor, transformer, land, and possibly high long-duration interest rates.
Earlier we were guiding on about 11 to 13% equity IRRs at least sometime back on these projects. Do we still believe we can meet that threshold of equity IRRs on these projects, given the rise in rates, given a rise in all these costs, and our inability to pass them through?
Yeah.
Vamsi Rama Mohan Burra
As I've said that we are in this business for the last many decades, and in the transmission, TBCB also we are proud to state that we are more than a decade, now almost 14 years we are into this. While undertaking this, we do factor these aspects as to what is the probable increase in it.
There are provisions taken care for that. Having said that, in case if there is a surprise which comes, which cannot be factored in a typical bid, they are well claimable under the change in law, provisions which are available under the transmission service agreement.
Keeping this in view, we make sure that wherever we are bidding, whatever we are doing, we are able to protect the returns for the stakeholder. We are doing that.
Nikhil Nigania
Understood, sir. Would you say it's the same range, 11 to 13% equity IRR?
Vamsi Rama Mohan Burra
Could be better as well.
Nikhil Nigania
Okay. It could be.
Vamsi Rama Mohan Burra
Please understand the model of a cost-plus, RTM mode, and a TBCB. In a cost-plus model, the returns are pegged to whatever be the cost of the project.
Even if you do the best of the innovations, that's the way how the model it is. It is not specific to transmission sector, and it's not particular to India.
Wherever there is an RTM mode, be it at any network asset or anything which is being developed under the RTM mode, the incentive for a better costing or a better operational efficiency is not discovered. Under TBCB, that is available.
After the tariff, if you're able to bring more of efficiencies, both in terms of the construction and the operational front, definitely that would be reflecting in the returns.
Nikhil Nigania
There
Vamsi Rama Mohan Burra
is an opportunity.
Nikhil Nigania
Fair point, sir. Thanks for the response.
Vamsi Rama Mohan Burra
Yes, please.
Mohit Pandey
Yeah. Yes, sir, this is Mohit Pandey from Citi Research.
Sir, first question, if you could give some color on the phasing of the capex and capitalization for FY '27, will it be very back-ended, too heavy in terms of capex and capitalization phasing?
Vamsi Rama Mohan Burra
I think I already answered that question, right? Capex guidance you're looking at?
No,
Mohit Pandey
no, not guidance, the phasing part of it. In FY '26, it was very back-ended, second-half heavy.
Okay.
Vamsi Rama Mohan Burra
You're looking at the phasing part of it. Let me say you, the transmission projects are not guided by a calendar year or a financial year, okay?
They are guided by the quantum of work which is involved in it. Maybe a project is taking about 18 months, 20 months, 24 months, and that could happen in this financial year or it could happen in next financial year.
I just wanted to use this question to answer or to clear thoughts that why it is happening here more or why it is happening less here. It depends upon the project which has started off and when it is ending.
Hopefully, number of projects may converge in a particular quarter, you see something magic has happened. No, magic was happening right from the beginning.
It only culminated on a particular quarter over there. As far as phasing which goes, you should also understand that there are certain seasons wherein the transmission projects find it a little challenging in trying to move forward over there, particularly the rainy seasons.
Having said that, if you have completed all the projects and it's only a matter of commissioning of the system in the substation, they do take place. Keeping in view the challenges what will be coming forward, both in terms of right-of-way, the forest clearances, and then the disruptions owing to the natural calamities, which are much more now if we can try to say that, depending upon that, the projects may converge, and by and large, what we see is it will have an even spread across the quarters over there.
It should be happening. Maybe you should be seeing few projects getting commissioned shortly, or maybe it may take a month here and there.
Then it would be evenly spread. It's only incidental, coincidental that it happened in the previous financial year everything happened in Q4, but not necessarily it should happen the same way every time.
No, there's no such statement happening.
Mohit Pandey
Understood, sir. Sir, and so for last year, what proportion of the capex and capitalization exceeding guidance would you attribute to improvement in right-of-way challenges versus projects without those challenges coming in for commissioning?
Vamsi Rama Mohan Burra
Every project is plagued with the right-of-way. Every project is plagued.
Not only right-of-way, sometimes we have challenges in the supply chain as well. With high-intensity works happening across the country, there are challenges, let us not only ascribe it to right-of-way alone.
It is also right-of-way, the challenges in terms of the supply chain, few of the equipment. Sometimes you don't get a small equipment and the entire project is put on hold because of that, because massive amount of works are happening in the country.
Then the availability of the labor, the skilled labor for us to undertake the works. All of that will culminate when all of that gets through, then the project is done.
Mohit Pandey
Yeah. Sir, final question on the deferred tax asset linked movements from this quarter linked to tax changes, bulk of it is done or should we expect similar movements in the coming year as well?
Vamsi Rama Mohan Burra
No, you see, all the TBCBs are already in new regime. Only Power Grid was continuing in the old regime.
G. Ravisankar
We'll be migrating to the new tax regime, so as per the standards, we should remeasure the deferred tax liability. The one time this effect has already been given.
We don't expect further remeasurements in the future years.
Mohit Pandey
Understood, sir. Thank you so much.
Moderator
Last couple of questions, if any. Otherwise, we can call it off.
Over here. Mike.
Shirom Kapur
Hi, sir. This is Shirom Kapur from Jefferies.
I had a couple of questions. One, you alluded to, sometimes projects can get delayed because of equipment supply issues.
In the past, we have seen extended lead times for procurement of transformers and various other equipment. Could you comment on that?
Are we still seeing stretched lead times? Is there a demand-supply capacity gap?
If you could quantify the capacity of transformer manufacturing in India right now versus the demand? That would be my first question.
Vamsi Rama Mohan Burra
Okay. The capacity stands somewhere about 300 GVA, and the demand is much higher than that, 400-plus in a particular year.
I'm talking about in terms of the transformation capacity for both transformers and reactors. Having said that, for the couple of years what we are seeing in terms of the challenges in procuring these units, the good amount of capacity expansion is also being undertaken by the OEMs.
That is happening on one front, and we're going for bulk procurement, which is taking away the project-specific procurement, giving enough lead time for the OEM also to supply the equipment. That's the reason you could see 72,000 MVA being added in one single year, massive amount of capacity which has been added in that.
Other thing what has happened, which I would like to also mention here, is that the timeline which was earlier about 18 months for implementing a project, that was putting stress not only on the entire project, but also on the OEMs as well. With that being rightly recognized, and now the timelines have been recently increased to about 26 and 30-plus months, so that is giving enough room for the OEMs also to deliver.
I see that multiple things which are happening: the timelines being increased, and more predictability in terms of the orders which are there, capacity expansions which are happening, all these things we look forward will try to ease down that particular situation, hopefully. Then the intensity of works also as it increases, more new projects coming in, we'll have to see who is going to catch up with whom over there.
That has to happen.
Shirom Kapur
Understood, sir. Just second question is on in FY '26, your capex guidance of ₹35,000 crore, which you surpassed now and achieved ₹40,000 crore.
Do you see, two years down the line, your capitalization guidance, which you have maintained at ₹35,000 crore, is there scope for that actually being upgraded, given that your capex also was higher than you had initially estimated?
Vamsi Rama Mohan Burra
You see, capitalization will have to follow. Is there any option?
It will follow.
Shirom Kapur
Thank you, sir.
Moderator
One last over there. To my left.
It's this one, and then the last one over there.
Hi, sir. Just one question on the regulated equity.
If you can share the regulated equity on a standalone basis and a consol basis?
Vamsi Rama Mohan Burra
Regulated?
Equity.
G. Ravisankar
Regulated equity will be only in the standalone. TBCB, there is no regulated equity first of all.
It is whatever is appearing in the books in the standalone as well as the
Sir. Thank you.
Moderator
Please.
Dilip Pandey
Hi, sir. This is Dilip from ICICI Securities.
My question was the CEA is planning to increase the fixed charges for the consumers. I was just thinking how it can benefit the Power Grid, just?
Vamsi Rama Mohan Burra
Long as the discoms are having a very healthy practice to get their revenues, it is good news to us. Best solution if it is given to the discoms, if the discoms are healthy, we are.
Dilip Pandey
Power Grid also can benefit from
Vamsi Rama Mohan Burra
I'm not talking about this, but then if there is some solution which is provided wherein the discoms are going to be that much healthy, this is definitely good news to us and good news to you.
Dilip Pandey
Thank you so much, sir.
Moderator
All right. On that note, thank you, sir.
It was nice. There are few more segments, quick ones.
I now invite Mr. Sanjay Sharma, he is the Executive Director Corporate Planning, for the vote of thanks.
After that, few photographs with you.
Sanjay Sharma
Thank you, Mr. Bakul.
Respected Chairman and Managing Director, Power Grid, members of the Board of Directors, other members of Power Grid family, our investors and analysts, and dear friends, a very good afternoon to all of you. On behalf of Power Grid, I thank all the analysts and institutional investors for joining us today in spite of a very busy results season.
Your presence and your continued faith is always inspiring and means a great deal to us. I thank the CMD and the Board of Directors for their continued guidance.
I also thank the organizing team of Power Grid Western Region-I, ably led by Executive Director Shri A. K.
Behera-ji for meticulous planning, and all the logistical support provided by the hotel, our arrangers for the manner in which they have organized this particular meet. We value our partnership and look forward to continued support.
Thank you.
Already premium?