Financial statements for the 9-month period of this year. As our Director General would like to extend his warm wishes to everyone, all the participants.

Thank you for being close to Transgaz through your reports, your questions, and correspondence we have. I would like to present our team: the Chief Financial Officer, Mr.

Marius Lupean, will present the statements; by my side, I have my new colleagues, Radu Perșoiu and Mr. Cătălin Tuță, but he will attend online if he manages to; Mrs.

Lăcrămioara Ciolpan, Head of the Investors Relations Department; Mrs. Elena Sasu, the Director of the Finance and Budget Unit; and Lăcrămioara's team at Investors Relations Department.

We are open to any questions. I would like to kindly ask Mr.

Lupean to present the statements, and are looking forward to receiving your questions related to the results for the 9-month period of this year. Please, Mr.

Lupean, start the presentation. Marius, you have the floor.

Marius Lupean

Yes, thank you. Good afternoon, everyone.

As Mrs. Ghidiu said, we will start by a short presentation of the statements and the factors that influenced such results.

In the second half of the meeting, we will answer all your questions. We will start the presentation with the comparison of the 9-month results achieved compared to the budgeted ones.

As you may see, the revenue from operation are achieved 95% compared to the budgeted ones for this period, but the expenses recorded higher savings compared to the budgeted ones for this period. The gross result at 9 months is 18% higher than the one which was budgeted, and the net result is higher by 28% compared to the budgeted one.

In terms of the individual comprehensive result as 9 months 2026 compared to the same period of the previous year, there were decreases in the revenues from operation, an achievement of 98% or a reduction by 2% compared to the previous year, but the expenses increased by 17% compared to the previous year. We will explain in a minute the factors that determined these results.

You will see that the results are determined by the expenses, the non-cash expenses recorded in this period, which do not affect the capacity of our company to generate cash. The main factors are depreciation and inflation.

As I said, we will present in more detail the factors later on. As I said, operational revenues recorded a decrease by 2% compared to the previous period, a reduction of 38 million lei.

The revenues obtained from the capacity booking were lower by 76,000 lei, but the capacity booked is higher by 1% compared to the previous period. The quantity transmitted increased by 3% compared to the previous period.

It's, in fact, an increased trend of the capacity transported through the transmission system. The factors that determined the capacity revenue lower by 76 million lei are determined mainly by the revenues from the auction premia, which are lower by 38 million lei compared to the previous period, and the capacity booking tariff, which is lower by 0.19 lei for the capacity booked in this period compared to the previous period, with a negative influence of 51 million lei.

I wanted to underline that the capacity booking tariff is determined by the structure of the products, the capacity booking products. Short-term are more expensive than long-term products, and the market focused in this period compared to the previous period to long-term capacity products.

This is the factor that determined its reduction by 50 million lei. As far as the revenues from the volumetric component are concerned, they are lower by 7.4 million lei, determined by the volumetric tariff lower by 0.13 lei lower than the previous period, with an influence of 15 million lei.

Other revenues from operation are higher compared to the same period of last year by 45 million lei on account of the revenues from funds for grants from a project financed under such grants. As far as the balancing activity revenues is concerned, they decreased by 87 million lei due to the lower quantity by 366 megawatts and the trading price higher by 0.60 lei per megawatt, with a positive influence of 50 million lei.

The balancing activity is neutral from a financial point of view for Transgaz. The level of the revenue, or any profit or loss that may be determined monthly as a difference between the balancing activity and revenue, are balanced by the neutrality tariffs that determines an equalization from revenues and expenses from balancing.

Transgaz does not have any loss or gains from this activity. Related to the construction activity, the revenues do not record any profit or loss.

It is because we apply IFRIC 12. All the costs related to investments are passed through revenues and costs from the activity, construction activity, and are related to the developments of the NTS.

Related to the financial revenues, they are lower by 105 million lei due to the update of the regulated asset value with an inflation rate. Once the new regulatory base period begins, the inflation is taken into account with an equivalent of 3%, 3.01% per year, and an adjustment of 2.29% for 9 months results for the 2026 compared to the adjustment of the inflation rate in the previous period, when inflation, the effectively achieved inflation, was taken into account at 8.45%.

The value of the revenue from the receivable update under the concession agreement is 76 million in this period, lower by 153 million compared to the previous one registered in the previous period. The revenues from interest related to the receivables are 46 million lei due to the commissioning and inclusion in the regulated asset base of major investment project completed and commissioned in this year.

We are referring here mainly to Tuzla-Podișor, which is a major project, and the Mintia project as well. Regarding operating expenses, they increased by 17% compared to the previous period, which is 239 million lei.

The main expenses and main increases were recorded at depreciation, 169 million lei, based on the commissioning of the investment projects. These projects were commissioned during the year: Podișor in January, but the capacity for the project Black Sea-Podișor, the capacity bookings established through an incremental capacity booking process developed a few years before, will be found in revenue starting with October.

With September, but to a larger extent can be seen consolidated starting from October. Natural gas consumption increased by 12 million lei based on the average price higher by 96 lei, with a negative influence of 24 million lei.

Technological consumption quantity is lower compared to the previous year by 83 megawatts, with a positive influence of 12 million lei. Technological consumption percent recorded in 9 months 2026...

Another expense element that increased are financial expenses, which increased by 90 million lei based on the costs of bank interests related to the investment projects commissioned. The costs are capitalized with the borrowings taken for the financing of the investment projects in the project values only until the commissioning.

As at 30 September 2026, the net profit recorded is 203 million lei, which is lower compared to the one recorded in the same period of last year. These would be the factors which determine the results of our company.

I would like to go to the questions and answers session. Thank you very much,

Elisabeta Ghidiu

Mr. Marius Lupean, CFO.

Lăcrămioara, I would like to ask you please to intervene and moderate a bit from all participants their questions.

Lăcrămioara Ciolpan

Yes, sure. Ioana Andrei.

Good afternoon. Can you hear me?

Yes, hello. Good afternoon.

Thank you for your presentation. I would like to refer to Quarter 3.

From your calculations, CTP cost resulted is 343 per megawatt. I know that you have enough gas resources that you don't see an issue to procure gas and to have higher costs.

Can you explain us what the issue was?

Marius Lupean

We have enough stock of natural gas, but part of the technological consumption was transferred from balancing. The obligation to store for balancing was reduced, and this gas was transferred to technological consumption.

This came with a higher cost?

Marius Lupean

Yes, it came with a higher cost because the balancing gas was accumulated over previous periods. We also had in the past price peaks at natural gas, and it was one of the periods in which the gas was procured.

That the balancing activity means buying and selling gas, and only part of those gas was procured during that period of time. That cost is lower compared to that existing on the market.

The market price was by quarter, and I'm not referring to 1st October, but the average price on that quarter was 200. The quantity of natural gas was moved from balancing, and this was the cost.

Can we expect for the fourth quarter to a similar value?

Marius Lupean

Yes, we can expect a similar cost for the fourth quarter, but in the market the cost is higher than 400. It follows the market trend.

Okay.

In fact, let's remain to the results at 9 months. On the financial result regarding budgeted, there is a large difference.

Can you explain the deviation? Do you mean that this is about the dividends that were to be cashed from the Moldavian activity?

Marius Lupean

No, dividends were budgeted for the Moldavian activity, but those dividends were distributed from Vestmoldtransgaz to Eurotransgaz, and they will reach Transgaz. Eurotransgaz, being a vehicle, it will not give dividends, but the capital will be diminished.

The cash will arrive at Transgaz. It was budgeted initially as a dividend cashing, but the profit would have been allocated in the next year.

The participation was diminished. This diminishing of participation that will be seen in the fourth quarter

this year, what does it imply? Okay.

Can you tell me what is the amount we are talking about?

Marius Lupean

We speak about 10.2 million euro.

For dividends in Moldova, is there a dividend policy? Are they going to exist continuously, a mechanism distributing dividends then reaching Transgaz?

Marius Lupean

The investment necessity, the availabilities will be analyzed, and depending on the situation, it will be taken the decision whether dividends will be distributed. The capacity of the company will not be affected regarding the implementing of the investments.

Which is the mechanism?

Marius Lupean

Capital diminishing. Eurotransgaz being a vehicle, this would be the purpose of Eurotransgaz.

The acquisition of Vestmoldtransgaz was through Eurotransgaz. Dividend distribution, the cash reaching to Eurotransgaz can be made by dividends or by cash, but at this moment we prefer the reduction of share and only the cash to enter into the company.

Now,

if we take a look at the budget, there is a difference compared to the budgeted value at 9 months, which implies a powerful fourth quarter. How do you see this situation?

Is it achievable, this budget for the fourth quarter?

Marius Lupean

Yes, it is achievable. The fourth quarter remains...?

Compared to the 9 months, we are above the budgeted figures. We expect that the budget will be achieved.

In the context of volumes which were decreasing at Q3,

how do you see the diminishing volumes at the beginning of the fourth quarter?

Marius Lupean

The budgeted volumes were estimated at the beginning of the year, depending on the major projects or the capacity booking contracts. You saw that the production deadline was moved in 2027, and this has an impact on the results.

Realistically speaking, at Petrom and Romgaz, there was never an issue that the gas should go off the pipelines in 2026. I'm not speaking only about the Black Sea gas, but also about the Mintia project, which had another deadline for commissioning.

Mintia finished on time, at time, and the other parts are coming.

I understand that you see also a diminishing of volumes for the fourth quarter?

Marius Lupean

Not necessarily. The quantities transmitted this year in 9 months are higher by 3% compared to last year.

We expect that this trend will be maintained, and we will transmit a higher quantity of gas at the end of the year compared to the previous year. We have a higher clarity on capacity where contracts are concluded.

Whoever contracted the capacity can use it at the level... Increasing of the technical capacity at Negru Vodă in November,

is it already included in your estimations for gas year 2026-2027, or is it additional?

Marius Lupean

Yes, we took it into account. The contracted, concluded mean capacity booked.

In the first 2 months of the quarter, how do you see the evolution of the revenue from capacity overruns and auction premia?

Marius Lupean

Auction premia, Transgaz recorded the revenue from auction premia in a substantial part. Capacity was booked over several years.

There was a higher interest for the capacity of the following year, but lower for the next years. Once contracted, the capacity at a certain capacity premium level, this would be kept for the relevant year.

Auction premia are maintained. The annual, quarterly, and monthly capacity has already been contracted.

It remains only the daily capacity to be contracted.

How about capacity overruns? Can you help us understand the movement from quarter to quarter compared to last year or the last quarter?

How should we see things? Is there stability in that?

Marius Lupean

Yes, there is a certain stability, but I can see the short-term products increasing in importance because capacity booking tariffs, the multipliers were excluded. This is another factor, and the winter products, the quarterly, monthly, daily products, are no longer so much expensive compared to the previous years, which means that the market is encouraged to book capacity for short-term products.

We expect to have bookings for short-term products, and also for daily products if they wish. For the daily products, there is no contract necessary to be concluded because they have the same tariff.

Capacity overrun is a contract for daily capacity booking. If there are any other questions, please.

I wanted to ask you about salaries increase. When will it be applied?

Marius Lupean

We are awaiting to receive the memorandum, but according to the legal provisions, it is applicable from the following month after its approval, most likely in January.

No. That means the following month, that means December, no?

Marius Lupean

Yes, yes. That is what the law provides.

I repeat, we have to receive the memorandum approved, and we will apply it accordingly. In fact, it is an indexation, it's not an increase.

Okay.

I had another question regarding the capex levels and commissioning expected for the following years until 2030. Could you provide us with some annual values or per gas year in any version possible?

Marius Lupean

The tariff methodology provides for its recognition in the regulated value the assets that are commissioned and received, accepted. We can make estimates for the following 5 years.

We provided a plan for commissionings to ANRE, but the higher clarity is for the gas year 2026-2027, this gas year. This year, we commissioned from two projects, the regulated asset base reached 9 billion lei from Marea Neagră-Podișor and the Mintia project.

Together, they have 2.5 billion and grants 0.5 billion lei. For the following gas year 2026-2027, we estimate 1.2 billion lei in investments from commissioning, from which grants approximately 0.4 billion.

Could you give us a data for the following gas year?

Marius Lupean

For the following gas years, you can take the best estimate from the 10-year development plan, where you have all the years for commissioning. And...

In that plan, most of the projects are non-FID. There is an annex which includes the projects which are smaller.

You see there only the major projects, to say so, but there is an annex where smaller projects are included, and we can make an estimate for their commissioning with the value. I have to check with my colleagues if they have the values.

It would be very useful if we could have some values, estimated values obviously, for each of the gas year in this regulatory period so that we have a predictability what is to be included in the regulated asset base. The predictability is given by the budget, because in the budget we present the information.

In the budget, you have presented the capex value, which is not equal to what is commissioned in that gas year. Yes.

Most of the investments are in the regulated asset base. Yes, but the time, the necessary time for the execution of an investment usually exceeds the influence of the recognition of the revenue in the RAB for the following gas year.

That's what I meant. Yes, you said the best estimate, and I indicated where you can find the best estimate.

As you have seen, the projects we envisage usually are achieved and commissioned in due time. Any major projects may have some problems, but usually they were very well managed, and reality proves that those investments were made.

At the level of the balance for the corrections after 2026-2027, which is the balance? Is there a correction balance from the previous years remained to be regulated?

Marius Lupean

Yes, approximately 250 million lei. This is for Transgaz individually and for the company Vestmoldtransgaz approximately 10 million euro for Vestmoldtransgaz.

They are from 2026. In 2025, they recovered fully.

There was an estimated balance, to say so.

Another question related to the regulatory period and a kind request if you could send us the volumes that were taken into account in the forecasts. What are the volumes that you take into account in tariff estimations, and on the other hand, which is the projection of ANRE for the pass-through costs?

Marius Lupean

The quantity of gas transported was for 2025-2026 191 million megawatts and for 2026-2027 262 million megawatts. This is the quantity estimated, taken into account, I repeat, taking into account the production in the Black Sea, the best estimate at that moment.

These were the quantities used in the substantiation of the tariff.

For the pass-through costs, do you take into account a reduction, or is it flat?

Marius Lupean

The technological consumption, as I said, is 0.22%. It's extremely low if we look throughout Europe.

ANRE, through the reduction of the technological consumption, cannot ask for zero. The level approved is higher than the one achieved.

It is higher than 0.5, which is a reasonable level at European level. It cannot set lower values than the ones which are valid for most transmission system operators.

This element, the savings for technological consumption, are recovered. As a conclusion, yes, technological consumption is fully recognized, and if savings are recorded, they have to be returned to ANRE.

One last question in the booked capacity. Could you tell us for the gas year 2026-2027 which is the volume, the capacity volume booked?

Marius Lupean

In terms of capacity booked, we can send you a link because there are several projects. We have annual, monthly, quarterly, daily, within-day products.

There are many elements that are taken into the calculation of the capacity. Yes, we can make this information available to you.

Thank you very much.

Marius Lupean

In order to better understand, a total level of the capacity booked is not the one that determines revenue because shorter-term products are more expensive than longer-term products. We'll make available to you the information so that you can make the calculation.

Thank you very much. That's it from my side.

Marius Lupean

I wanted to ask you if out of the questions sent by mail you wanted clarifications.

Everything is clear now? As far as the parameters for the substantiation of the regulatory rate, yes, we need more clarity regarding the components and the parameters used to substantiate the fifth regulatory period.

It would be easier for us to see the situation. The commissioning related to each, per each year, gas year, would be very useful.

The other components as well. More useful information would be to have these parameters in writing than what we have discussed today.

You have access to that information because the regulated revenue is presented annually. Agreed, but on the other hand, the substantiation of ANRE in the beginning of the regulatory period considers the five regulatory periods, no?

Marius Lupean

The regulated revenue is approved in the beginning of the year, and the structure is presented on Transgaz' website. I think you have seen that information, but we may send you the link where you can find this information.

Every year, there are adjustment elements: inflation, delta VT, and other factors. Those are the elements that are illustrated on Transgaz' website.

It is the revenue approved by the ANRE order.

There is not a split per year of the 5 years of the regulatory period?

Marius Lupean

No, there is not, because it is approved for one year. Maybe you compare with the methodologies for electricity.

Yes, maybe. No, they are approved in the beginning of the year, and then you have adjusting elements.

Yes, now I understand why you asked about investments and commissioning. The estimated commissionings are not taken into account at the substantiation, only the ones achieved for 2026-2027, because the substantiation was made in April 2026, took into account the estimates until September 2026, but they are seen as correction in the following year.

The value of the commissionings are not relevant for setting the tariff. If we look at each gas year separately, yes.

When we make an evaluation, we take into account 5 years. We have to make a projection with revenues for the following 5 years.

In order to be able to make such projections, we can start from some commissionings that have to be put in a guidance that the company provides, because otherwise commissionings are very difficult to be estimated if many of the projects you mention in the National Development Plan are long-term projects, are in beginning stages, the projections for 5 years is exposed to too many parameters. I'll make available some materials where you can find the information you need so that you can make your own projection.

I wanted to explain you that the structure of the revenue approved and published is adjusted every year with adjustment elements. That's it.

This is the structure. This is the structure, because each, at its turn, has hundreds and thousands of lines.

These are details.

Thank you very much.

Marius Lupean

You're welcome.

Lăcrămioara Ciolpan

We have a question from Mr. Corneliu Manole in the chat: According to Transgaz' 10-year network development plan updated in September 2026, the new dedicated hydrogen corridor connecting Tuzla-Podișor-Bibești-Jupa-Horia-Nădlac are both scheduled for completion by 2030.

Could you provide an update on whether these projects are progressing according to the original schedule for 2030, or whether there have been any significant changes in their timelines, scope, or investment priorities? When does Transgaz expect to be able to offer firm hydrogen transmission capacity to third-party producers wishing to connect to the European hydrogen backbone?

Mrs. Ghidiu.

Elisabeta Ghidiu

For the question of Mr. Manole, he referred to the 10-year network development plan over the 10 years from September 2025, but since then we've had modifications, and we are now in the process of preparing the clarification requested by ANRE for the actual version of the 10-year network development plan.

Submitting this plan at ANRE, and we are waiting for analysis and approval by ANRE. The deadlines for the two corridors are 2032, because as you may know, these projects regarding hydrogen require certain justification, substantiation regarding regulation, European regulation, national regulations.

We included them into the plan, but the deadline for achievement is 2032, both for Giurgiu-Podișor-Bibești-Jupa-Horia-Nădlac, and also for the Black Sea-Podișor. The updated deadline is 2032 following approval by ANRE.

We will publish the 10-year network development plan on our website.

Lăcrămioara Ciolpan

Mrs. Daniela Popov.

Hello. Can you hear me?

Yes. Thank you for your presentation.

I'd like to ask you a few questions regarding the finance income. You mentioned a difference between what was achieved in 9 months and what was budgeted.

It was attributed to the dividends, but this explains only half of the difference. Can you explain the other part of the difference?

Marius Lupean

Yes, the difference results from the adjustment with inflation of the receivable in the concession agreement.

When budgeted this income, you didn't know the adjustment rate for this receivable?

Marius Lupean

It comes from the asset value. I repeated these elements are non-cash, all of them.

We have depreciation, which is not to be found in cash, and also the updating of the receivable with inflation.

At one budgeted, did you know about the adjustment?

Marius Lupean

No, we only knew the percentage. All right.

Regarding the parameters utilized, they establish only for the following gas year?

Marius Lupean

They are published every year after the approval of the tariff. They are approved at the beginning of the years and adjusted every year.

The structure approved for the following gas year is published in the PowerPoint you referred to.

It would be useful for us substantiation notes,

Marius Lupean

if there exists such... Substantiation note, we have such a thing.

There is an internal document between Transgaz and ANRE, but the structure and the results can be found and are published. Substantiation note includes the quantity which is estimated for the relevant year?

We presented this information, and this is not a secret. We can publish it as well, but we presented the quantity.

Where can we find the quantity?

Marius Lupean

I have mentioned during the meeting the quantity for 2026: 162 million megawatts. Probably the ultimate suggestion regarding

the investment level for us, the analysts, it would be very useful if we could have a visibility over this regulatory period and an estimated investment level for the following years.

Marius Lupean

We have the 10-year network development plan. We have many projects which don't have a final investment decision.

We need a benchmark to transmit the activity of the company as accurately as possible. We have the investment plan and the budget of the company.

The annual budget is not achieved in the 9 months.

Can we suppose that in the following quarter that will be compensated, the amount not achieved?

Marius Lupean

The estimates are to be found in the TYNDP and in the budget. Which were achieved, correct?

The commissionings were achieved, and these commissionings are those that matter.

Which projects were commissioned?

Marius Lupean

Black Sea-Podișor and gas supply to Mintia power plant. These are 2.5 billion lei together.

All right. It would be very useful if you could provide us a guideline for the investment level for the following period.

I understand. Thank you.

Marius Lupean

Please, if you have any other questions.

Lăcrămioara Ciolpan

We have another question on the chat from Mrs. Rodica regarding the Transgaz announcement regarding the increase of the Petrostar equity.

She would like to receive clarification regarding the dates for Stage A and Stage B for the increasing of the share capital.

Marius Lupean

This is outside our meeting scope, but the first stage is until 9 December, and the second until the end of the year, 31st of December.

Lăcrămioara Ciolpan

Other questions?

I wanted to ask something about the budget as a follow-up. When you say that you trust that the budget will be achieved, do you mean the annual budget, or the budget for the fourth quarter?

Marius Lupean

I refer to the annual budget.

How about the budget for Quarter 4?

Marius Lupean

We can deduce it from the annual budget and that for the 9 months. We have an estimation with a net profit of 220 million lei.

Our estimation is that the budget will be achieved. Including the one for Quarter 4?

Was forecast at the beginning of the year, the annual budgeted values.

The achievement of the annual budget implies indirectly that you don't achieve the budget for Quarter 4.

Marius Lupean

No, we speak about an estimation. For Quarter 4, I can surely say what happened in 9 months, but I cannot say something surely, but estimation for the end of the year, because we have transmission months.

The winter months have higher revenue compared to the summertime. Yes, there are elements that lead to the conclusion that the budget will be achieved.

I told you the best estimate.

Lăcrămioara Ciolpan

Are there any other questions? If there are no other questions, I would like to thank you again in the name of our company and of our Director General for the activity in this year, to wish you health and happy holidays together with your loved ones.

We remain open to receive your questions by email, and we hope to see you next year. Thank you very much, and a lot of health.