Operator
Good day, and thank you for standing by. Welcome to the Q3 2026 Comstock Resources Inc.
earnings conference call. At this time, all participants are in a listen-only mode.
After the speakers' presentation, there will be a question-and-answer session. To ask a question during the session, you will need to press star one one on your telephone.
You will then hear an automated message advising your hand is raised. To withdraw your question, please press star one one again.
Please be advised that today's conference is being recorded. I would now like to hand the conference over to your first speaker today, Jay Allison, Chairman and CEO.
Please go ahead.
Jay Allison
Thank you. I know that there are several companies presenting at the same time, those of you that have joined this call, we're always appreciative and thankful.
Welcome to the Comstock Resources third quarter 2026 financial and operating results conference call. You can view a slide presentation during or after this call by going to our website at www.comstockresources.com and downloading the quarterly results presentation.
There you'll find a presentation entitled "Third Quarter 2026 Results." I am Jay Allison, Chief Executive Officer of Comstock, and with me is Roland Burns, our President and Chief Financial Officer; Dan Harrison, our Chief Operating Officer; and Ron Mills, our VP of Finance and Investor Relations.
Please refer to slide two in our presentations and note that our discussions today will include forward-looking statements within the meaning of securities laws. While we believe the expectations in such statements to be reasonable, there can be no assurance that such expectations will prove to be correct.
If you will turn to slide three, we summarize the highlights of the third quarter. Our production grew 9% from 2025 and was 8% higher than the second quarter driven by new wells turned to sales from our drilling program.
In the quarter, 16 legacy Haynesville wells were turned to sales with an average lateral length of 10,812 feet and an average per-well initial production rate of 25 million cubic feet per day. Six of those were Horseshoe wells.
We also turned six new Western Haynesville wells to sales in the third quarter with an average lateral length of 9,829 feet and an average per-well initial production rate of 33 million cubic feet per day. The higher production drove our financial results, which Roland will go over in a few minutes.
Starting September 1st, we entered into a drilling venture with Jerry Jones covering 27 wells. 18 of the wells are in the Western Haynesville with nine in the legacy Haynesville.
The new venture will allow us to generate free cash flow in the fourth quarter while also allowing us to continue our development and delineation program in the Western Haynesville. On November 9th, yesterday, we entered into a definitive purchase and sale agreement with SOCAR for a $1.65 billion divestiture.
The proceeds from the transaction will substantially improve our balance sheet. We also just extended the maturity of our bank credit facility by a year, which will further extend an additional four years after closing the SOCAR transaction.
I will cover all of those strategic transactions in the next slides. Turn to slide four, we summarize the drilling venture with Jerry Jones.
Beginning September 1, 2026, Arkoma III, a partnership owned by the Jones family, will fund the drilling and completion cost of 85% of 18 Western Haynesville wells and 80% of nine legacy Haynesville wells. Arkoma III will fund an estimated $300 million of capital expenditures in 2026 and an additional $150 million in 2027 on these 27 wells.
Prior to September 1st, Comstock has spent $180 million on these wells, which will be recovered by Comstock from 100% of the net revenues from the first production of these 27 wells. Arkoma III will receive the net revenues after the pre-venture cost are recovered until Arkoma III has recovered its cost and a 15% return.
After the return on investment is achieved, 50% of the interest in the 27 wells revert to Comstock. The drilling venture allows us to generate free cash flow in the fourth quarter while supporting the continued development and delineation of our 547,000 net acres in the Western Haynesville, as well as providing volumes to Pinnacle Gas Services.
If you'll turn over to slide five, we'll summarize the strategic partner with SOCAR. SOCAR is purchasing a 20% interest in our legacy Haynesville, a 15% interest in our Western Haynesville, and 15% of our interest in Pinnacle Gas Services for $1.65 billion.
We recently executed the definitive purchase and sale agreement and expect the transaction to close by year-end 2026. Proceeds from the transaction will be used for debt repayment.
Comstock will remain the operator of the properties, and Comstock and SOCAR will jointly participate in further leasing and acquisitions in the Haynesville. SOCAR will offer Comstock future LNG marketing opportunities.
SOCAR's 15% interest in the Western Haynesville reduces to 7.5% after five years and once SOCAR has achieved a 15% return on investment in those assets. As a result, Comstock will have an increased participation in the future upside of the Western Haynesville assets, creating a balanced structure that aligns both parties around the long-term performance of those assets.
Slide six shows the ownership interest in the legacy Haynesville, the Western Haynesville, and Pinnacle Gas Services upon closing of the SOCAR transaction. As previously mentioned, after five years and upon SOCAR achieving a 15% return on the investment in the Western Haynesville upstream assets, Comstock's interest in the Western Haynesville assets will increase from 85% to 92.5%.
Sixth Street owns the remaining 27% of Pinnacle Gas Services, which reduces to 19.5% after certain return hurdles are met. At that point, Comstock's interest in Pinnacle Gas Services will increase to 69.5%.
Please turn to slide seven. I'll show you the key partnership impact of the SOCAR transaction to Comstock.
The $1.65 billion purchase price provides strong validation of the value implied by the quality and longevity of Comstock's upstream assets in the legacy Haynesville and Western Haynesville while reaffirming our significant midstream value embedded within Pinnacle Gas Services. SOCAR's investment-grade balance sheet and global LNG marketing operations should help create value for Comstock shareholders.
Comstock will use the proceeds from the SOCAR transaction to repay the outstanding balance in our Comstock revolving credit facility with pro forma net debt decreasing to about $1.7 billion compared to $3.4 billion at the end of the third quarter. The stronger balance sheet will support continued delineation and development of Comstock's 547,000 net acres in the Western Haynesville.
Comstock remains operator of the properties and retains further upside in the Western Haynesville through the reversion provisions. On slide eight, we'll show you the benefits of the strategic partnership with SOCAR.
The partnership with SOCAR combines Comstock's Gulf Coast location, access to significant gas reserves, and midstream operations with SOCAR's LNG and trading platform. The scaled footprint across both the legacy and Western Haynesville provides decades of drilling inventory.
As a result, Comstock is positioned to maximize natural gas pricing netbacks across domestic and international markets while mitigating volatility via strategic partnership and power supply and midstream investments. Both the Jones family and SOCAR are aligned as long-term strategic stakeholders.
Lastly, the deleveraged balance sheet provides development flexibility across our asset base. I will now turn it over to Roland Burns to discuss the third quarter financial results.
Roland?
Roland Burns
All right, thanks, Jay. On slide nine, we cover the third quarter financial results.
Our production in the third quarter averaged 1.3 Bcfe per day, which was up 8% from the second quarter this year and was 9% higher than the third quarter of last year. Oil and gas sales after hedging were $359 million, reflecting the impact of the higher production being offset a little bit by lower natural gas prices in the quarter.
EBITDAX for the quarter was $266 million, and we generated $208 million of cash flow, or 71 cents per share, before any working capital changes during the quarter. We reported a $22 million profit for the quarter, or 8 cents per share.
Included in that number was a pretax $35 million mark-to-market unrealized gain related to our future hedges. Excluding the mark-to-market gain, exploration expense, and other non-recurring items and the related income tax impact of those, we reported net income of $6 million for the third quarter, or 2 cents per share.
Slide 10 covers the year-to-date financial results. Production in the nine months of the year averaged 1.2 Bcfe per day.
Oil and gas sales after hedging were $1 billion in that period. EBITDAX was $763 million, and we generated $588 million of cash flow, or $2.02 per share.
We reported a $138 million profit for the first nine months of this year, or 47 cents per share. That number included $119 million mark-to-market unrealized gain on our future hedges.
Excluding that mark-to-market gain, exploration expense, and other non-recurring items and the related income taxes, we reported adjusted net income of $54 million for the first nine months of this year, or 18 cents per share. Slide 11 breaks down our natural gas price realizations in the quarter.
The quarterly weighted average NYMEX settlement price averaged $2.95 in the third quarter, and the weighted average Henry Hub spot price averaged $2.87 in the quarter. We sell a third of our gas in the spot market, an appropriate NYMEX reference price for our quarter would be about $2.93.
Our realized gas price averaged $2.61 in the quarter, reflecting a 34-cent basis differential compared to the NYMEX settlement price and a 32-cent differential compared to that reference price. In the third quarter, we were 59% hedged, so that increased our realized price to $2.93.
We also made an additional 2 cents per Mcfe from our third-party marketing activities. Slide 12 details the operating costs per Mcfe and our EBITDAX margin.
Our operating costs per Mcfe averaged 80 cents in the third quarter, up 3 cents from our second quarter rate. Lifting costs were down 2 cents, G&A was down 1 cent, both attributable to that higher production level we had in the quarter.
Production and ad valorem taxes increased by 3 cents in the quarter, really due to prior-period true-ups, and gathering costs were up 3 cents. Overall, our EBITDAX margin was 73% in the third quarter.
Slide 13, we recap the spending so far this year on our drilling activity and other development activity. We spent a total of $383 million on development activities in the third quarter and $1.1 billion during the first nine months of this year.
In the first nine months of this year, we drilled 39 wells, or 28.6 net to our interest operated wells, and those were in the Haynesville Shale formation. Then we drilled another 16, or 10 net wells, in the Bossier Shale formation for a total of 55 wells, or 38.7 net wells.
We turned 52 wells, or 44.7 net operated wells, to sales so far this year with an average overall IP rate of 29 million cubic feet per day. Slide 14 summarizes our capitalization at the end of the third quarter.
We ended the quarter with $800 million of borrowings outstanding under our upstream credit facility. Our upstream borrowing base is $2 billion under the credit facility, and the elected commitment under that facility is at $1.5 billion.
All of that was recently reaffirmed in our early November bank meeting. The maturity date of our facility was recently extended also to November 2028.
After closing the SOCAR transaction, the maturity will further be extended on our bank credit facility to November 15, 2031. At the end of the third quarter, the midstream credit facility had no borrowings outstanding.
Our last-12-months leverage ratio was 3.2 times, and we ended the third quarter with over $850 million of financial liquidity. Pro forma for the SOCAR transaction, our debt will be reduced by half, and our leverage ratio improves to two times.
Given the impact of the Jones drilling venture on the fourth quarter capital spending, we anticipate generating free cash flow in the fourth quarter, which will further reduce our debt before closing the SOCAR transaction. I'll now turn it over to Dan to discuss the operations in more detail.
Dan Harrison
Okay, thanks, Roland. On slide 15, this is, our updated overview of our total acreage footprint in the Haynesville and Bossier shales, East Texas, and North Louisiana.
Overall, we currently have a million and 84,812 gross acres and 809,883 net acres that are prospective for the commercial development of the Haynesville and Bossier shales. We currently have just over 262,000 net acres across our legacy Haynesville area, and our Western Haynesville footprint has grown to just over 547,000 net acres.
Our producing well count now stands at 47 wells in the Western Haynesville. This is up six wells since our last call.
We currently have another 15 wells that we have in various stages of development. On slide 16, this outlines the drilling inventory in our legacy Haynesville area, at the end of the third quarter.
We have 899 gross operated locations with a 78% working interest, or 698 net locations. We have 770 gross non-operated locations with a 12% working interest, or 96 net locations.
442 of our 899 gross operated locations, or nearly 50%, have laterals exceeding 10,000 feet. The average lateral length in our inventory is, stands at 10,212 feet.
Our gross operated inventory is evenly split between the Haynesville and the Bossier. Also included, in the legacy Haynesville inventory is 108 gross Horseshoe locations with 50% Haynesville and 50% in the Bossier.
We currently have four rigs, they're running on our legacy Haynesville area that's provides us with a long runway of future drilling locations. Slide 17, this outlines our estimated drilling inventory in the Western Haynesville.
We have 3,255 gross operated locations and 2,507 net locations in the Western Haynesville, which equates to an average working interest of 77%. Our our total net locations are estimated since much of the Western Haynesville acreage, has not been unitized.
Roughly 40% of our 3,255 gross operated locations, or 1,317 locations, have laterals exceeding 10,000 feet. 61% of our gross operated locations have laterals exceeding 8,500 feet.
The average lateral in our Western Haynesville inventory is 8,884 feet. Our Western Haynesville drilling inventory is more weighted to the Bossier formation with nearly 2/3 of the inventory in the Bossier, and 1/3 of our inventory is in the Haynesville.
We currently have five rigs running on our Western Haynesville acreage today. Slide 18 is an overview of our Horseshoe well drilling program, which allows for extended reach and re-entry opportunities for higher-return drilling locations.
The improved drilling economics of the Horseshoe wells unlocks previously stranded acreage by converting two section laterals into a single two-mile lateral. Since starting the Horseshoe program, we've turned 17 Horseshoe wells to sales with an average IP, of 29 million cubic feet a day and an average lateral length of 10,223 feet.
The two most recent Horseshoe wells have an average lateral length of 13,518 feet. As mentioned on the previous slide, we have 108 remaining Horseshoe locations as of the end of the third quarter.
In addition to the drilling of Horseshoe wells, we've identified a number of enhancements to further improve returns, including the rotary steerable technology, the re-development opportunities, the longer laterals up to 15 to 20,000 foot, and drill-drill-through applications. Slide 19 outlines our average lateral length drilled based on the wells that we drilled to total depth.
The average lateral lengths are shown separately for our legacy Haynesville area, and our Western Haynesville areas. In the third quarter, we drilled 16 wells to total depth in the legacy Haynesville area with an average lateral length of 11,905 feet.
The individual laterals, ranged from 6,050 feet up to a max, 15,923 feet. The longest lateral drilled to date in the legacy Haynesville area still stands at 17,409 feet.
In the third quarter, we also drilled five wells to total depth in the Western Haynesville, with an average lateral length of 8,587 feet. The individual laterals ranged from 6,936 feet up to a max 10,920 feet.
Our longest lateral drilled to date in the Western Haynesville is 14,783 feet. To date, we have drilled 54 wells to total depth in the Western Haynesville.
23 of these 54 wells have laterals exceeding 10,000 feet. Slide 20 summarizes the 38 wells that we have turned to sales, in our legacy Haynesville area, so far in 2026.
The average lateral length was 11,530 feet, and the individual laterals, ranged on the low end from 8,497 feet up to a high of 15,772 feet. The average IP for the 38 wells is 28 million cubic feet per day.
Included in these 38 wells is 14 Horseshoe wells. Slide 21 outlines the 17 wells that we have turned to sales on our Western Haynesville acreage so far in 2026.
These 17 wells had an average lateral length of 10,153 feet and an average initial production rate of 31 million cubic feet per day. Since our last call, we have turned six additional wells to sales with IP rates ranging from 26 to 40 million cubic feet per day and an average IP of 33 million cubic feet per day.
We have a total of 47 wells currently producing on our Western Haynesville acreage. Slide 22 highlights our drilling efficiency in the legacy Haynesville area.
This is for our benchmark long-lateral wells that have laterals over 8,500 feet long. In the third quarter, we drilled 14 of our benchmark long-lateral wells to total depth in the legacy Haynesville, an average 22 days to total depth.
Correspondingly, we averaged 1,156 feet drilled per day on our legacy Haynesville acreage, and this, represents a 14% increase versus the second quarter of 2026. Five of the wells we drilled in the third quarter were Horseshoe wells.
Slide 23, this highlights our drilling progress in the Western Haynesville. During the third quarter, we drilled five wells to total depth.
This gives us a total of 52 wells drilled to total depth through the end of the third quarter. We averaged 56 drilling days for the five wells, drilled to total depth during the quarter.
This is a decrease of three days compared to the second quarter. The drilling speed of 461 feet per day during the third quarter was 2% lower than the second quarter.
The main reason drilling speed decreased from the second to third quarter was the Dolly Jones, that was our first big-hole lateral we drilled during the second quarter. This well drilled 25% faster than our other wells.
If we taking the Dolly Jones, yeah, would have been excluded, our drilling speeds would have improved in the third quarter. Slide 24 details our D&C costs through the third quarter for our benchmark long-lateral wells, in the legacy Haynesville area.
These costs reflect all of the wells with laterals over 8,500 foot long. The drilling costs are based on the quarter in which the wells were reached TD, and the completion costs are based, on the wells, during the quarter on the wells that were turned to sales.
During the third quarter, we drilled 14 of our benchmark long-lateral wells to total depth, including five Horseshoe wells. Our third quarter drilling costs averaged $634 a foot.
This is an 11% decrease compared to the second quarter. Our improved drilling performance in the third quarter can be attributed that had much stronger lateral drilling performance compared to the second quarter, which outweighed the impacts of the slightly higher service costs we did experience during the quarter.
The rotary steerable drilling technology being deployed in our legacy Haynesville area, especially in our Horseshoe wells, has continued to deliver superior results, is driving our drilling efficiencies higher. During the third quarter, we also turned 15 of our benchmark long-lateral wells to sales on our legacy Haynesville acreage, of which five were Horseshoe wells.
The third quarter completion costs came in at $715 a foot. This is a 5% increase compared to the second quarter.
The higher completion costs in the third quarter is is partially the result of completing three single-well pads during the third quarter, compared to to nine during the the, second quarter. We also experienced the higher service costs during the third quarter.
On slide 25 is a summary of our D&C costs through the third quarter for all wells drilled in the Western Haynesville. During the third quarter, we drilled five wells to total depth, in the Western Haynesville.
Average lateral length was 8,587 feet. The third quarter drilling costs averaged $1,934 a foot.
This represents an 11% increase compared to the second quarter. The biggest factor in our higher drilling costs for the third quarter was the shorter average lateral length of 8,587 feet for the wells, in this quarter.
To a lesser extent, the higher service costs we experienced also contributed to the higher drilling costs for the quarter. During the third quarter, we drilled our second, big-hole lateral.
This time we drilled it to a more challenging lateral target in the Haynesville, but again, our results met our expectations. During the third quarter, we also turned six wells to sales in our Western Haynesville acreage that had an average lateral length of 9,829 feet.
The third quarter completion costs averaged $1,959 a foot. This is a 22% increase compared to the second quarter.
We had several drivers affecting the higher completion costs during the quarter. The primary driver has been the transition to pumping the larger fracs.
This led that we we had a 12% higher proppant loading in the third quarter compared to the second quarter. Coupled that with the higher service costs that we that we had.
We also tubed up all but one of our third quarter wells, as opposed to only tubing up one of our wells in the second quarter. Back to the drilling side, we've been very pleased with the results of our first three big-hole lateral wells, and we're planning more of these wells for the future.
The bigger hole in the lateral, creates the lower downhole temperatures, and we're seeing longer, more reliable runs from our downhole drilling assemblies. Then it has also provided us with much better steering ability so that we can keep our laterals on target.
One last item I want to update from our last call, we should be deploying our first 10,000 psi rig in the Western Haynesville towards the end of this month, which we fully anticipate will lead to faster drill times. We're planning to upgrade two additional or two more of our rigs to 10k capability in the second quarter of next year.
I'll now turn the call back over to Jay.
Jay Allison
Dan, great job. Roland, great job.
If you'll go over slide 26, we'll summarize our outlook for 2026. Again, our primary goal continues to be advancing our Western Haynesville that will position Comstock to benefit from the longer-term growth in natural gas demand.
We have five operated drilling rigs in Western Haynesville to continue to delineate the new play. We expect to drill 19 wells and turn 20 wells to sales in 2026.
We expect drilling efficiencies and changes to our completion design to continue to drive up productivity and drive down D&C costs. We have four operated rigs drilling in legacy Haynesville to support production growth in 2026 and 2027 and expect to drill 52 wells and turn 45 wells to sales in 2026.
The Jones drilling venture allows us to generate free cash flow in the fourth quarter while supporting the ongoing delineation and development of the Western Haynesville. The SOCAR transaction will allow us to retire half of our debt outstanding, providing us a strong balance sheet as we enter 2027.
Comstock has captured the massive Western Haynesville footprint and been successfully drilling wells there since 2021. At the same time, we own Pinnacle Gas Services, our midstream, to ensure takeaway.
We believe natural gas will be undersupplied by 2029 with the demand growth of LNG going from about 20 Bcf a day now to 35 Bcf a day by 2032, plus the additional 12 Bcf needed to provide power for turbines for data centers. Where our Haynesville Bossier leases are located is the sweet spot for demand.
Our goal is to protect our natural gas assets, protect our midstream company, PGS, prudently develop our Western Haynesville footprint and add to it monthly, protect our balance sheet, and have the best partner in the world on our side. With the addition of NextEra, Sixth Street, and SOCAR, I believe we have the winning team.
When Jerry Jones and his family touched Comstock in 2018, we became who we are today. That support 100% allowed us to purchase Covey Park in 2019, close the numerous acquisitions around the Western Haynesville, acquire PGS, and lease thousands of acres in our Western Haynesville at a time of very low natural gas prices.
The Jones relationship also helped secure SOCAR as a forever partner that provides us LNG marketing opportunities in Europe. On September 1st, 2026, the Jones drillco, $450 million, allows us to generate free cash flow in the fourth quarter while supporting the continued development and delineation of our 547,000 net acres in our Western Haynesville, as well as provide volumes to Pinnacle.
Jerry asked me to make these following comment: his commitment to Comstock is because of his unwavering faith in management and an exemplary natural gas asset base that we control, and the tremendous value of US gas in the future. That is why the Jones family have invested over $1 billion in Comstock equity.
With that, I want to thank you for your time. Slide 28 provides guidance for the rest of 2026, which Ron can discuss with you directly if you have questions.
For the rest of the call, we'll take questions from analysts who follow the company. I'll turn it back over to you.
Operator
Thank you. At this time, we will conduct the question-and-answer session.
As a reminder, to ask a question, you will need to press star one one on your telephone and wait for your name to be announced. To withdraw your question, please press star one one again.
We ask that everyone limit to just one question and one follow-up question. Please stand by while we compile the roster.
Our first question comes from the line of John Annis with Texas Capital. Go ahead, your line is open.
John Annis
Hey, good morning, all, and thanks for taking my questions. For my first one, the Dolly Jones well delivered a 40 million a day IP using the big-hole design, and I think you're now drilling your fourth well with that design.
What have you learned about the repeatability of results on drilling and well performance, and then ultimately what portion of the Western Haynesville inventory could ultimately be developed this way?
Dan Harrison
It's a really good question. We are drilling our fourth well at the moment with the big-hole design.
We haven't seen anything to date that tells us that we have any concerns with that design. We really need to drill more wells to just hone in on where the breakover is between drilling a slimhole versus a big-hole design.
Right now, I'd probably just say it's somewhere between 10 and 11,000-foot lateral length. Of course, we had the shorter average lateral lengths that we reported for the quarter, and that's just due to where we're trying to hold acreage, and the acreage layout, and geology, and some other things.
In the future, we'll definitely be getting the laterals longer in the years ahead. I would say probably the majority of all our future wells, maybe not within the next year or so, but further out, I'd say the majority of the wells will be drilled with the big-hole design.
We just need some more data to just hone in on really just kind of where that crossover mark is. We've been super pleased with it.
You asked about the Dolly Jones, that was the first one, that thing really drilled incredibly fast, that was drilled to the Bossier. Our second big hole that I kind of mentioned on one of the slides was drilled to the Haynesville.
The Haynesville just on average out here is a little bit harder digging than it is in the Bossier. The results from the second well were about right on par with what we expected.
I think, maybe one of the things to drive home is the intangible benefit of drilling the big hole. We can steer and keep the laterals on target much more easy than we can when we're drilling with the slimhole.
When staying on target is directly correlates to the performance of these wells, you want to keep that lateral right there in the best rock where you want it. Not only can we drill long, but even when we're drilling long, we can still keep that thing on target way out there at the end, which the slimholes, they'll start walking and we have a lot more difficulty keeping them on target when the wells get long.
This leads to other issues that add drilling days. Happy with the big holes, I see that is the bulk of the future.
John Annis
Got it. I appreciate all that color.
Maybe staying on completion design, last quarter, you noted the 2Q wells were the first full batch completed with 5 to 6,000 pounds of proppant per foot and said their early pressures look encouraging. With another quarter of production history, are you seeing a measurable improvement in expected EURs, and is that uplift, in your view, sufficient to justify the 12% or so higher proppant loading?
Dan Harrison
Definitely, absolutely. We actually transitioned our standard frac design when we started out, and really for a lot of early wells, was 4,000 pounds per foot.
We did have one big job we pumped back early on one of the Robertson County wells, but other than that, they were all 4,000 pounds per foot. We transitioned to the bigger fracs really starting in December of '25 when we started Poppleton.
Every well in 2026 has either been 5 or 6,000 pounds per foot. When you run the math on the economics, you only need maybe an incremental 0.2 Bcf per thousand to justify adding another 2,000 pounds per foot.
When you look at the well performance we have to date, which it's early on some of these wells, but they do look really good. When you take that early data and combine it with the modeling and stuff that the reservoir group has done, we easily should surpass that 0.2 Bcf per thousand incremental.
That's definitely the direction we're going.
John Annis
Got it. I appreciate the time.
I'll turn it back.
Operator
Thank you. One moment.
Our next call comes from the line of Carlos Escalante with Wolfe Research. Your line is open.
Carlos Escalante
Howdy, Jay and Roland and team. How are you guys doing today?
Thank you for taking our call. Wanted to ask on your HBP program in light of the now nine rigs you have running across your operations where five are now in the Western Haynesville, because I don't think that when you gave preliminary outlook of when you thought the HBP program would be done that you contemplated five rigs in the basin, or at least as quick as you did.
I wonder if you can remind us or reframe for us when you think you would hit your threshold and how do you foresee that transition from HBP-driven wells move over to value-driven or return-driven operations? Should we see, or should we expect perhaps, a quicker inflection on D&C per foot when that does happen anytime sooner?
Thank you.
Roland Burns
I'll let Dan answer most of it, but I would just say that what the fifth rig is gonna allow us to do is to put some more development wells into the program and not have to 100% keep all the projects on HBP acreage. I think we're still on the same kind of timeframe because we're very comfortable with that timeframe to HBP the acreage, but with the additional rigs, we can now drill some more wells on the same pad, also drill in areas where we've already really spent a lot of money to figure out the area really well.
I think the ability to drill some development wells will definitely start to see a positive impact on the overall program as far as cost. That's kind of the direction.
We'll probably use the additional drilling rig there. Now that we have support of other partners such as the Jones partnership and SOCAR to probably add infill development wells along the way in the program and meet our HBP goals with the overall drilling program.
Jay Allison
I think we'll have a dual program, which we needed. We're to the point after I think we'll have drilled 60 wells at the end of this year in the Western Haynesville.
I think our timeframe, even though we add acreage every month, our timeframe to hold all of it with the four-plus rigs is still the same. Now we have a dual goal: we can come in, and the millions of dollars that we have spent for gathering and takeaway and the pads, we can now drill additional wells on those pads, and I think you'll see material cost savings.
Now that we've drilled around a bunch of these wells, we understand where we should keep the lateral. You add all the new drilling tools that we have, I think you'll see the costs come down, I think you'll see the productivity go up, particularly with the choke management that we're using now.
We'll blossom on some of the production rates that we will be giving you in the future.
Dan Harrison
I think Jay and Roland gave you a pretty good answer. I don't really have a lot to add to that.
We are blending in some infill development wells a little bit in 2027, and those wells we can set up with the longer laterals and in the areas where we already have proven offset well performance to kind of help balance out the HBP program.
Carlos Escalante
Sure. No, thank you to the three of you.
That turns out a solid answer, I think. Then on productivity, just going a step further perhaps on the prior question.
If I look at, particularly one of the Kretschmer, and I'm sure I'm botching that name, Kretschmer wells, your normalized initial production rate, as a very quick-and-dirty metric, looks to have jumped and actually posted one of the highest numbers in the two years you've been doing a lot of the drilling. Just wondering, that's obviously just one piece of the puzzle, initial production, but what steps are you taking, or what of the completion design tweaks you've done give you confidence that you can flatten the decline rate, or said another way, can lead to maximization of your EUR and really keep that production up the same way that you perhaps did with some of the earlier wells alongside that Circle M trendline?
Dan Harrison
You got the name right, Kretschmer. I think everybody struggles with that a little bit, but the answer, without making it real complicated, is the larger fracs, definitely believing in the larger fracs like we talked about earlier.
It just takes a minimal incremental EUR, which we should easily surpass, and the conservative drawdown strategy. You're contacting a lot more rock, stimulating a lot more reservoir volume, and with the conservative drawdown, you keep that open, that's going to lead to the bigger EURs.
The early data that we've got on the wells that we've fracked in the last year with the larger fracs are showing that we're heading in that direction. We do need longer-term production to prove that out, but it's all pointing to where we expect it to go.
Jay Allison
I think the good thing on your question is if you go probably 90 miles north to south, that's kind of a guess number, but the rock that we have found, it is consistent quality resource rock. All we're doing now is we've extended it to the north and south, starting with the Circle M, going to Elijah, and extended it to the north, now we're going a little bit west.
It is not the inventory, the 2,500 locations, is not the rock. It is now really with Dan's program, we're getting to the point where we can have some repeatability.
That's another reason we're going to go in and drill some of these infill wells. Why?
Because of the demand for natural gas for the future.
Carlos Escalante
Thank you, Jay.
Operator
One moment. The next question comes from the line of Paul Diamond with Citi.
Go ahead, your line is open.
Paul Diamond
Thank you. Good morning, all.
Thanks for taking the call. Just real quick on the SOCAR deal.
Can you guys put some, I guess, details around the potential marketing opportunities that you referenced? Are those long-term supply agreements or direct sales?
Any detail you have available there.
Roland Burns
Thanks, Paul. We'd like to, but a lot of that is being developed.
I think our future partner here, SOCAR, is actually in the process of looking to buy offtake in the United States. They're buying their production first, kind of a reverse order of some of the other entities that have come in and had the same strategy.
As they lock that down, they'll be able to come up with specific opportunities for us to look at. Their whole reason to invest in the Haynesville Shale was to support their global LNG trading operations and have this gas available to export.
As they develop that full value chain, they're going to offer us to kind of follow them on the same path, and we have the option to do that. Getting the full economic arrangements are something kind of in process that will kind of work themselves out over probably the next year or so.
Paul Diamond
Got it. Appreciate the clarity.
Then talking a bit more about the rig upgrades you guys referenced, going to 10,000 psi, potentially to go 20,000, one on the way, two more being considered. Can you talk about how tangibly or quantitatively that actually translates to higher drill speeds?
Or I guess where does the cliff off go? How much faster do we see?
Dan Harrison
Good question. I guess we really don't know exactly what that's going to turn out to look like, but we do have the first one.
Actually, we got a rig move probably coming up in a couple of weeks, and that's when the first 10,000 10,000 the first pad we drill with the 10k rig will be spudding hopefully here in a couple of weeks. I think if you just basically mathematically, right, the higher pump pressures, the higher flow rates you can pump, you get better efficiency out of the motors, you get more horsepower to the bit, basically that's just conventional thinking that's going to transfer into higher ROPs.
Some of the motors we run in the laterals, specifically like on slimhole, sometimes we don't get quite the GPMs or flow rate to the motors to have them operating at their peak efficiency. The 10k rig being able to pump faster will let us achieve those things.
Very comfortable. I know there's some other operators that have already taken some 10k rigs, and that are adding more 10k rigs.
I think we're going to see that even industry-wide. I think you'll see this pick up a little bit more also as everybody gets comfortable with the higher performance.
Operator
Thank you.
Paul Diamond
Got it. Understood.
Operator
One moment. Our next question comes from the line of Jacob Roberts with TPH Research.
Your line is now open.
Jacob Roberts
Morning.
Dan Harrison
Morning.
Jacob Roberts
Morning. Guys, I wanted to start on the Western Haynesville, and when we look at the 2025 and 2026 vintages and the performance we're seeing out of those against let's call it a $35 to $40 million cost for a 10,000-foot lateral, can you speak to where you see the full-cycle breakeven gas price today, and then ultimately where you would like to see that head over the coming years?
I say all that and we do appreciate that this is a longer-term plan, but I just wanted to get a sense of where we're at now versus where we could be in a few years from now.
Dan Harrison
With the costs that we have today with where we're at, I think we're in that ballpark just straight up breakeven. We've had a lot of inflation this year just obviously with the diesel prices driving up the cost of everything that we're doing.
Just from the second quarter to third quarter, we're up 8% to 10% overall on our costs. Hopefully, that's going to flatten out in Q4.
We don't see a whole lot of an increase, and maybe hopefully it retreats a little bit next year. Obviously, what happened with the elections and everything, kind of who knows really where that's maybe headed.
I think the breakeven price is there. As we get into the future, I think that'll be still somewhere in the same ballpark.
As the performance gets better with the higher fracs, should push that down a little bit.
Jacob Roberts
I appreciate that. Then, maybe just to follow up on that performance comment.
The 2025-2026 vintages, we're starting to see that longer production history. Our conversations with investors would point toward folks modeling a pretty big range of outcomes, and some are probably below the 3.5 Bcf per thousand that we talked about at the initial onset of this play.
I was wondering if you could give any color on how the recent wells are performing on an EUR per foot basis, just to think about the change across the vintages per year or even per quarter.
Dan Harrison
I think since we've been pumping the larger fracs, like I said, we started in December of '25, all of the 2026 wells have pumped the larger fracs. The early data is definitely pointing to much improved EURs.
I don't know if I would put a certain number on them, but we're, percentage-wise, 10 10% easily increase in EURs. Just what we've seen to date, everything's fitting the way that we've got them modeled, we're just really comfortable with the bigger fracs.
We definitely need more data to basically pinpoint what the numbers are going to end up being.
Jacob Roberts
Thank you. I appreciate the time, guys.
Operator
Thank you. One moment.
Our next question comes from the line of Jack Kavanaugh with Goldman Sachs. Your line is open.
Jack Kavanaugh
Morning, team. Thanks for taking my question.
Would love to focus on the cost in the Western Haynesville, and you touched on it a little bit in the call, but can you speak to kind of the trend scene in D&C costs over the last few quarters and also expand maybe on the puts and takes on how you're thinking about the outlook to get those costs lower in the context of some of these rig upgrades and kind of the things you guys are doing with the big-hole design?
Dan Harrison
I think if you take inflation out of the mix, the cost and the change in the frac design, basically, I think our costs have been pretty flat if you normalized all of that and took it out. I think we got the 10k rigs coming.
We definitely feel like we're going to shave some days off, that's going to drop our cost a little bit. I think in the future, long term, we are looking at some rotary steerable technology, but that's a little bit further out in the future.
We're still looking at the 20k frac fleets. I think would definitely help us there, even though I think that's probably out further on the timeline.
Roland Burns
The major driver of cost on these shale wells is lateral length. You've seen the legacy Haynesville achieve these great cost levels because we're now just drilling 15,000-plus wells.
The Western Haynesville is going to get there, but it's going to take a longer period to get there. I think overly focused on the cost of short laterals in the legacy is expensive, too.
I think, so as we improve these drilling and completion techniques and we get the laterals long, which is going to happen in the future, the costs are going to start to look more similar to the legacy. It's just a different stage of development.
I think that the overall focus of the cost, you have to have a little patience. There's a lot of exploration costs, there's a lot of single-well pads, there's a lot of things in the Western Haynesville in its early development stage that the legacy Haynesville had the exact same thing, and they're just a different time stages.
It's trending there, and all the initiatives for the higher-powered rigs, the higher-powered completions, the better motors, development infill drilling, those are all going to drive those costs way down from where they are today. The best thing is the large reserves in place in the Western Haynesville make it all worth it.
They are definitely much higher than the legacy Haynesville across the board, usually twice as much.
Jay Allison
We went back to 2008, 9, 10 and compared the core, which was iffy in 2008, 9, 10, and the results, and you had to have $5.15 gas to have a 30% IRR. Those were 4,500-foot laterals.
We really didn't start drilling extended laterals even in the core till probably 2015. It's only been the last several years that we've been able to drill 15,000-foot laterals in the core.
To Roland's point, if you compare where we were in the core, they call it the core back in '08, 9, 10, in the first 3-4 years of the core versus where we are in the first few years of the Western Haynesville, we are light-years ahead in the Western Haynesville where we were in the core to create value with the reserve potential that you have maybe 200 feet of pay in the core and you may have 1,500 to 2,000 feet of prospective pay in the Western Haynesville. It's a completely different game, and the prize is multiple times more valuable in the Western Haynesville.
The question is, do you have the 1,100 penetrations for that 90 miles? Do you have the seismic?
Do you have the balance sheet and the partners in order to de-risk this, unlike it didn't happen in the core? There was recklessness when gas hit $6, $8.
We've not been reckless in the Western Haynesville. We have an exemplary partners, and we didn't have LNG and demand for natural gas to power the turbines.
That is the game changer, that 30, 40, 50 Bs a day that they've spent trillions of dollars investing in takeaway infrastructure, we didn't have that back then. We have it today.
Jack Kavanaugh
Got it. That's all super helpful color, appreciate that, team.
Then maybe for my follow-up, just maybe following up on the earlier kind of gas marketing discussion, with the SOCAR relationship obviously gives that access to international LNG markets. Just kind of how meaningful could you see that exposure become relative to kind of the current domestic marketing portfolio?
Roland Burns
Obviously, today, there's a significant premium to those markets compared to our domestic markets. There's a very wide, huge margin there.
You don't know what the future looks like, if those are going to more align with each other. I think having that optionality with a strong partner and will be a great asset to our overall marketing portfolio opportunities.
Today, we're putting in place several long-term arrangements where we're going to supply natural gas to power generators. Those create much higher margins for us because we're able to get those contracts done with much better prices.
Also, have a very long-term, great customer. I think that it's a balance of those two, those are the two trends in our gas marketing to be able to sell more directly to power generators, including the Anderson County power generation hub that the federal government is putting in on our Western Haynesville footprint, in addition to other long-term power generation deals that we are going to supply directly to other power generators.
The combination of those two will be kind of a great add to our marketing portfolio.
Jay Allison
For LNG, if you can have it, you really want location closer to the Gulf Coast, and that's just a transportation cost issue, and you want that and we have it. You want an established production base, we have that.
You want a balance sheet because you can't do it without a balance sheet, and you need decades upon decades of inventory. We have all that.
You ought to check those off, and most of them don't have that, and we have all that. You bring a SOCAR in, we have everything plus a big plus sign on it.
Jack Kavanaugh
That's all very helpful. Thanks, team.
Operator
Thank you. One moment.
Our last question comes from the line of Tim Moore with Clear Street. Your line is now open.
Hey, guys. This is Paul on for Tim.
Just want to go back to the balance sheet. It's great that you have SOCAR signed and you're taking net debt down to around 1 and 1/2 billion once that closes.
I'm just curious how you're thinking about the dividend from there. What leverage level would you want to see before bringing it back?
Jay Allison
Now think about this question that you just asked. Now think about this.
What is it? Near the rainbow, which is a pot of silver, gold, whatever.
Could be a big pot of natural gas if prices are high. Now just think This is the most reverberating question I've ever had lately, because we had three-plus times leverage ratio coverage, and now we've got 1 and 1/2, 1.7.
A dividend That tells you that you see that we've controlled this balance sheet properly, and you're just asking if we're going to continue to do that.
Roland Burns
I think that's a great question, Paul.
Jay Allison
Oh, it's a great
Roland Burns
I think our target leverage is to be below 1 and 1/2 times leverage, we would have to look over the horizon, do we have a stronger gas price market than we have right now? Do we have the hedge position that secures that prices?
Our number one priority, as we've said always, is to continue to advance the Western Haynesville, and advance the relationships we have that were building out our midstream, supporting the Anderson Power Hub, etc. Those are our top priorities.
Then if they're all met, and there's a great gas price environment and our leverage can stay below our targets, then the dividend can come back. We're not going to bring it back early.
We're going to be very responsible to all our stakeholders because our majority of our stakeholders and partners are focused on the long-term future, versus short-term return of capital.
Jay Allison
I think you add this fifth rig and you get infill drilling, and you get very comfortable, a repeatability, which is going to happen. Remember, you've got two Haynesville zones, you've got two Bossier zones.
It's not that we're trying to complete the same zone that 90 miles, we've got maybe three or four different zones that we're completing. I think as Dan has told you for the last hour, they're getting better and better and better at what they're doing.
You can see the type partners that we have now, and I do believe that the demand for natural gas is real because the investment has been spent, and I believe that we're in the sweet spot for that demand. It's never looked better for us, period.
Got it. That's helpful.
Thank you. For my follow-up, I just like to shift back to the power hub.
In your 10-K, you talked about an initial capacity of around 2 gigawatts, and the Anderson County hub could go up to 5.2. I guess your supplies reaching close to a Bcf a day by 2031.
Is 2 gigawatts, is that still the right way to think about that, and how the volumes could start to grow from that point?
Roland Burns
The very first stage of operations that comes in is a 1-gigawatt power facility, and then the longer-term facilities they're building will be 5.2 gigawatts to 5.3, and so that is the plan and that is what's being all designed. It's just the staging.
Then there's the possibility that they expand beyond that if they want to, but that is the initial plans that are in the engineering phase right now. All the equipment's been ordered.
It's off and going. The first phase, that will be sometime in '28 is when we'll start providing gas under that contract.
They will be constructing the facilities next year, especially on our midstream. We'll be constructing all that gas facilities for them that will need to hook up to the power generation facilities.
Jay Allison
You'll see first production early '28, and it'll strengthen toward the latter part of '28. They own the acreage, they're spending the money like Roland said.
Really, the goal is to have the 5.2 gigawatt position to have that if that demand is there.
Got it. That's helpful.
Thanks, guys.
Operator
Thank you. This does conclude the question-and-answer session.
I would now like to turn it back to Jay Allison for closing remarks.
Jay Allison
Again, I know there were several competing companies out there, all great companies, that you could have listened to, we're always thankful if you listen to the full hour and 5 minutes of this. I always want you to know that, whether you're SOCAR, or Sixth Street, or NextEra, or the Joneses, we as a management group, there's about 255 of us, we will always give you our very best, and we'll always be very honest with you, and we expect to always deliver.
Thank you.
Operator
Thank you for your participation in today's conference. This does conclude the program.
You may now disconnect.