Operator

Good day, and welcome to the Peabody Energy Corporation Q1 2026 Earnings Conference Call. All participants will be in listen-only mode.

Should you need assistance, please signal conference specialists by pressing the star key followed by zero. After today's presentation, there will be an opportunity to ask questions.

To ask a question, you may press star then one on your telephone keypad. To withdraw your question, please press star then two.

Please note, this event is being recorded. I would now like to turn the conference over to Kala Finklang.

Please go ahead.

Kala Finklang

Thanks, operator, and good morning, everyone. We appreciate you joining us for Peabody's first quarter 2026 earnings call.

Joining me today are Peabody's President and CEO, Jim Grech; Chief Financial Officer, Mark Spurbeck; and Chief Commercial Officer, Malcolm Roberts. After our prepared remarks, we will open up the call for questions.

Before we begin, I want to remind you that our remarks today will include forward-looking statements. Please review the full statement contained in our earnings release and consider the risk factors referenced there, along with our filings with the SEC.

I'll now turn the call over to Jim.

Jim Grech

Thanks, Kala, and good morning, everyone. Peabody's first quarter was marked by a number of accomplishments amid a positive time for both thermal and metallurgical coal markets.

We delivered better than expected volumes, pricing, and costs in our seaborne thermal segment, supported by sharply higher global LNG prices in March. Our U.S.

thermal coal volumes continued at a strong pace, driven by continued strong electricity demand. Across our seaborne met portfolio, operations performed in line with expectations, with the notable exception of Centurion.

Focusing on our top priority, Centurion, I'll provide a thorough update of where we are today. As as part of our commissioning of equipment in February, we encountered temporary mechanical and electrical issues.

While those challenges were resolved, the disruptions led to a slower cutting speed, which in turn contributed to roof control conditions. Maintaining roof integrity is critical to sustaining optimal cutting speeds.

As a result, early in the ramp-up, progress was slower than we were anticipating, even after resolution of the mechanical and electrical issues. Importantly, once the mechanical and electrical issues were resolved, the team implemented a comprehensive response plan centered on proactive strata management and disciplined execution, with safety as the top priority.

We have brought together a highly experienced group of engineering and operational personnel from across the platform to address these challenges. Since that time, we have been systematically working through what was, at its core, an iterative cycle of slower equipment performance affecting roof conditions.

Over the past several weeks, we have taken deliberate steps to stabilize the operation by reinforcing the roof and face, realigning shields, and improving overall cutting conditions. Naturally, every mine is unique, with different geology, equipment, and operating conditions, and it has taken some time to apply the right solutions at Centurion.

While this has required a longer than anticipated commissioning period, it ensures that safety remains paramount as we work toward durable solutions. Our safety performance has remained strong, and I want to be clear that we have had no carbon monoxide events, no methane issues, no ignition events, and no regulatory challenges.

While we are not yet at full cutting speeds, the key remediation steps are largely in place, and we are encouraged by what we're seeing. We believe the remaining temporary headwinds are largely confined to the second quarter, with performance in the back half of 2026 expected to reflect a return to full longwall production rates.

We expect to sell roughly 300,000 tons in the second quarter, reflecting strong June production, but a traditional lag in converting production at the mine into sales at the port. Additionally, the seven-week longwall move that had been planned for the fourth quarter is now expected to shift into early 2027, which will support stronger production in the second half of this year.

As a result, our full year sales outlook for Centurion is now 2.5 million tons, compared to our original expectation of 3.5 million tons. With that said, we've updated full year met segment volumes to reflect the 1 million ton decrease, and increased costs to a range of $123 to $133 per ton.

Stepping back, Centurion remains one of the most attractive assets in our portfolio, with a strong position on realized pricing, cost structure, and mine life. In addition to our coal mining and marketing business, we continued to make progress in our Peabody development initiatives in recent months, focused on unlocking additional value from our vast array of land, reserves, operations, and commercial relationships.

When we spoke last quarter, we had been recommended for a $6.25 million grant from the Wyoming Energy Authority, and that grant was awarded later in the first quarter. Peabody is now advancing initial plans for the pilot plant to process rare earth elements using PRB coal as feedstock.

We also continue to advance additional opportunities related to rare earths and critical minerals. We have a particular focus on germanium, where we see good concentrations, strong end-market engagement, and favorable supply-demand dynamics.

For proprietary reasons, we'll need to keep details at this level for now. I'm also pleased to note that an initial test shipment is occurring this quarter for West Coast thermal coal exports.

We have sent PRB coal from our North Antelope Rochelle Mine, transported by Union Pacific Rail to Mexico's Port of Guaymas, where it is being loaded for export to an Asian customer. This test run reflects close coordination with U.S.

and Mexican governments, port authorities, and logistics partners. It demonstrates the potential of a West Coast export route for PRB coal.

While this is a proof of concept shipment, Guaymas has infrastructure that could support additional volumes over time. More broadly, this effort underscores Peabody's ability to connect the largest coal basin in the Western Hemisphere with the largest global demand center for thermal coal imports.

We would also note that recent U.S. policy actions continue to affirm the value of reliable coal supply chains and baseload generation capacity to national security and grid resilience priorities.

That follows an executive order during the quarter that directed U.S. defense facilities to purchase power from coal-fueled generation.

We view these moves as highly constructive, both symbolically and practically, for longer-term coal use in the U.S. For more on the U.S.

and global supply-demand fundamentals, I'll turn things over to our Chief Commercial Officer, Malcolm Roberts.

Malcolm Roberts

Thanks, Jim, and good morning, all. Last quarter, I noted that we'd seen strong upward moves in the past year, first in U.S.

coal demand and later in the year in met coal pricing, but that seaborne thermal coal had been stuck in a middling trading range. Recent events in the Middle East, though, have changed the seaborne thermal coal fundamentals.

Leading into Q1, seaborne thermal coal had been somewhat range-bound, with a mild winter in much of Asia suppressing burn, and strong domestic production running in China and India had kept seaborne demand modest. However, two major forces emerged that both increased demand and constrained supply.

First, the Iran conflict in late February caused a sharp rerating of thermal coal demand, and prices moved upward, with March Newcastle averaging more than $20 a ton higher than pricing pre-conflict levels. At the same time, high LNG prices and limited availability pushed multiple countries to rely more heavily on coal-fueled generation.

We've seen both policy support and practical actions for seaborne thermal coal across Japan, Korea, Taiwan, Vietnam, Thailand, and the Philippines, among others. As history has reminded us, whether it be Fukushima, Ukraine, or the Middle East, coal remains, by far, the largest source of electricity in the world, and continues to play a critical role in global energy security.

Coal is abundant, transportable, storable, and reliable, and today still fuels more than one out of every three electrons worldwide, far more than any other form of generation. The second major factor impacting thermal coal fundamentals was Indonesia's directive to keep more coal domestically, which has begun to take a real bite out of supply.

Indonesia exports over half of the world's seaborne thermal coal, and its government has announced cuts in production that would represent about a quarter of its exports if fully implemented. We've grown accustomed to such proclamations coming in short of original estimates over the years, but even a portion of that dramatic cut would mean a tightening of thermal coal fundamentals.

I'll note that not all developments in the seaborne coal markets are favorable. Freight rates have roughly increased 50% from pre-conflict levels, affecting the delivered cost of our products.

While the market excitement has centered on thermal coal, seaborne met markets remain very constructive. First quarter benchmark pricing for premium hard coking coal averaged more than 25% above year-ago levels, and could be characterized as more mid-cycle after the temporary dip we saw in 2025.

I'll note the stratification of prices across lesser grades of met coal has become more pronounced. Low-vol PCI is up a more modest 14% over a year ago, while High-Vol A pricing was actually 12% lower in the first quarter than in quarter one of 2025.

Turning to the U.S. markets, power demand has remained strong early in the quarter due to a very cold January.

Henry Hub gas prices lagged as the quarter wore on, and ultimately ran below the fourth quarter and year-ago levels. Coal was still dispatched at a decent rate, and U.S.

coal demand was solid. We're working through the shoulder season and soft gas prices at the moment, but expect overall U.S.

load growth to help balance that out as we begin to enter the strong summer burn. With that brief overview of the markets, I'll turn the call over to Mark.

Mark Spurbeck

Thanks, Malcolm, and good morning, all. In the first quarter, we reported a net loss attributable to common stockholders of $32.4 million, or 27 cents per diluted share, while delivering adjusted EBITDA of $82.5 million.

Results were underpinned by outstanding performance from our seaborne thermal platform, which benefited from higher realized prices and strong demand from Asian markets. The seaborne thermal platform delivered 3 million tons, exceeding expectations, and increasing export shipments by 200,000 tons.

Realized export prices averaged $86.25 per ton, up more than 5% from the prior quarter, driven by higher Asian demand amid elevated LNG prices in the latter part of the quarter. Higher production from both Australian thermal mines helped reduce costs to $50.26 per ton, below the low end of guidance, resulting in a 25% adjusted EBITDA margin and $48.5 million of adjusted EBITDA.

Seaborne metallurgical shipments totaled 2 million tons, 400,000 tons below plan, due to the longwall ramp-up challenges at Centurion and unfavorably wet weather at the CMJV, partially offset by higher than anticipated production at Metropolitan, where we completed a longwall move ahead of schedule. Costs were higher than our guidance at $142 per ton, largely due to lower volumes at Centurion, partially offset by realized prices that increased 13% quarter-over-quarter.

The segment recorded an adjusted EBITDA loss of $7 million, as an otherwise strong quarter was reduced by $80 million from the Centurion ramp-up, including $10 million of additional commissioning costs. Our U.S.

thermal business delivered $61.5 million of adjusted EBITDA in the first quarter. The PRB shipped 21.2 million tons, exceeding expectations.

Costs were above guidance due to sales mix, which included additional shipments of higher heat coal from NARM, and timing of certain repairs and maintenance costs. Net net, costs outpaced higher average realized prices, resulting in lower margins in the quarter and $23.7 million of adjusted EBITDA.

Other U.S. thermal shipped 3.3 million tons at better than expected costs, demonstrating continued disciplined cost control.

I'm also pleased to report that 20 Mile continued to perform well in its new longwall panel. Together, the other U.S.

thermal mines contributed $37.8 million of adjusted EBITDA. Moving forward, like the rest of the industry, we are keeping a close eye on oil prices.

I'll share a few points here for context. Peabody uses approximately 100 million gallons of diesel fuel a year, with the majority used in the U.S.

at our large surface mines. Each $10 per barrel change in oil price impacts EBITDA by $6 million per quarter, ignoring potential benefits from higher coal prices.

With the continuation of the Middle East conflict, we increased expected full year PRB costs 50 cents per ton to reflect the current forward curve. We also increased seaborne thermal cost guidance by $2 per ton to reflect the current price strip.

We have not experienced any disruption to imported fuel deliveries in Australia, and we are working closely with our primary supplier to monitor continued availability. While higher fuel costs are anticipated across the business, the seaborne met and other U.S.

thermal segments are expected to remain at beginning-of-year costs. A firm resolution of the Middle East conflict may result in an improved forecast with lower costs.

Looking ahead to the second quarter, we expect seaborne thermal volume of 3 million tons, including 1.9 million tons of export coal, 300,000 of which are priced on average at $64.60 per ton. 1 million tons of Newcastle product and 600,000 tons of higher ash coal remain unpriced.

Costs are expected to be between $57 and $62 per ton, with approximately $3.50 related to higher fuel costs, as well as a stronger Australian dollar and planned repairs and maintenance at Wilpinjong. We expect seaborne metallurgical volume of 2.3 million tons, with realizations of 75% of the premium hard coking coal index.

Costs are expected to continue at higher than full year run rates due to lower production at Centurion before achieving full longwall volume in the second half of the year. In the PRB, we anticipate shipments of 19 million tons at costs of $13.25, reflecting the traditional second quarter shoulder season and the 50 cent adjustment to higher fuel costs.

Other U.S. thermal coal shipments are expected to increase to 3.4 million tons, with costs at $45 to $49 per ton, in line with full year guidance.

In closing, our first quarter results highlight the value of our diversified global assets. Strong performance from our thermal segments, both abroad and here in the United States, continues to generate substantial free cash flow.

Peabody ended the quarter with just under $500 million in cash and total liquidity above $850 million. This financial position reflects the resilience of our balance sheet and provides financial flexibility to navigate near-term challenges, support our shareholder return program, and continue to invest in long-term value creation.

With that, I'll turn the call back over to Jim.

Jim Grech

Thanks, Mark. As we look toward the rest of the second quarter, priority one is continuing the positive momentum at Centurion, and progressing toward our targeted production rates in a safe and productive manner.

Beyond Centurion, we remain focused on delivering strong performance across the broader mining portfolio, while maintaining a rigorous cost discipline. Finally, we'll continue unlocking additional value from our extensive asset base over time.

With that, operator, we're pleased to open up the call to questions.

Operator

Yes, thank you. We will now begin the question and answer session.

To ask a question, you may press star then one on your telephone keypad. If using a speakerphone, please pick up your handset before pressing the keys.

At any time your question is addressed and you would like to withdraw it, please press star then two. At this time, we will pause momentarily to assemble the roster.

The first question comes from Chris LaFemina with Jefferies.

Chris LaFemina

Hey guys, thanks for taking my question, and thanks for the update. I just wanted to ask first on the PRB cost guidance.

Second quarter costs are going to be a bit higher than the first quarter, but then the full year guidance is materially lower than what your first half average would be, and I wanted to understand how you're going to get there. I understand that that part of it is, I would assume, a function of higher volumes in the second half of the year, and part of it is that on the strip, diesel prices, I guess, are a bit lower, but it is a substantial drop-off in costs, and just wanted to better understand that.

That's my first question.

Mark Spurbeck

Good morning, Chris. You're exactly right.

You kind of answered your own question there for the PRB. Costs were higher in the first quarter a little bit, going higher in the second quarter, mainly due to diesel fuel.

That's probably about a 75% impact in the second quarter, 50 cent impact over the full year. You're right, that forward strip declines.

That's the biggest change there on the PRB costs.

Chris LaFemina

Did

Mark Spurbeck

you mention lower volume as well, right? Second quarter shoulder season, we're looking at about 2 2 million tons less, a big denominator difference there as well.

Chris LaFemina

That makes sense. Thanks.

Then, secondly, just on the balance sheet, I noticed that the restricted cash balance fell by $33 million in the quarter, and I'm not sure I saw the offsetting decline in any associated liabilities, I might just be missing something there, but what was going on with the cash balance?

Mark Spurbeck

The restricted cash, there was just some movement in how we collateralize some of those obligations. No change in the liabilities.

Chris LaFemina

Got it. Thanks.

I'll get back in the queue. Thank you.

Operator

Thank you. The next question comes from Katja Jancic with BMO Capital Markets.

Katja Jancic

Hi, thank you for taking my questions. Maybe staying on PRB, I know that the prices are currently locked in or mostly locked in.

Do your contracts in any way allow you to potentially share some of the cost burdens from diesel right now? Or is there no opportunity for that?

Malcolm Roberts

Morning, Katja. Malcolm here.

Look, a majority of our contracts are fixed-price contracts that don't have a fuel rise or fall. Then

Katja Jancic

if this environment continues, are you potentially looking at hedging any of the diesel costs? Or do you have any hedges in place?

Mark Spurbeck

Katja, we do not hedge diesel. We've looked at this over the years multiple times, whether fixed pricing with our suppliers or hedging it with derivatives, it's just not cost-effective to hedge.

Katja Jancic

Maybe one more if I may. You mentioned the potential for West Coast exports of PRB.

Can you talk a bit more about right now currently what the opportunity could potentially be in more near term?

Malcolm Roberts

Thanks for the question, Katja. Malcolm here again.

Look, the potential there in terms of the coal quality is pretty much unlimited. This PRB coal quality is fantastic in terms of its sulfur level, in terms of its ash level.

What we've seen in Asia is a lot of power generating plants have been set up to burn on this type of coal. That was originally based on Indonesian coal.

Now Indonesian coal is being kept more domestically and also we're seeing grades decrease. There's a real opportunity, particularly in terms of the environment, and this high-grade PRB coal to be consumed in Asia.

It was really quite positive and exciting that we're able to work with the port operator down there and also the Union Pacific to do a trial shipment. The potential there will be limited by the logistics in terms of the Guaymas port.

Then also, you'd note that there are West Coast port opportunities currently being discussed, and that is something that really encourages us as we move forward.

Katja Jancic

Okay. Thank you.

Operator

Thank you. The next question comes from Nathan Martin with The Benchmark Company.

Nathan Martin

Thanks, operator. Good morning, everyone.

Malcolm, maybe just sticking with you for a second. You mentioned about some of the additional seaborne thermal opportunities you're seeing in the market driven by conflict in the Middle East and as well as Indonesia.

Is there still demand and price out there, or have you seen that retreat maybe some of the recent peaks? Oh,

Malcolm Roberts

look, I think we're going to potentially go to the next level over coming months. The tide that lifts all boats is the Chinese import price.

We've seen that rally reasonably strongly and I'm hearing of deals for API 5 around $100 a ton at the moment, which is over year-ago levels, that's probably $25 in excess of that. Now once that tide comes up, that'll also support Newcastle pricing.

LNG pricing is still at quite a multiple as a fuel cost than seaborne thermal coal. We're just starting to move into the summer in the Northern Hemisphere.

I think there's more to come.

Nathan Martin

Great. That's helpful.

Then maybe going to Centurion. I know you guys obviously mentioned aiming to complete the commissioning in production ramp here in the second quarter.

Can you talk a little bit more about the timing there? I think maybe June was mentioned, but is this kind of an end-of-quarter completion, how confident are you that the longwall should be up and running at full tilt in the second half, and when that might occur?

Jim Grech

Hi, Nate. Jim Grech here.

We have a lot of confidence that that's going to occur here in the second quarter. I'll give you a little detail around where we're at right now, how we see us getting through the month of May, and then the month of June, why we have so much confidence.

Right now, our plan gets us to optimize longwall automation by the end of May. What do we mean by optimize longwall automation?

It means we're all done with the commissioning of the equipment and we are in regular production mode per our forecast. To get us to that position by the end of May, [we are progressively moving into?]

that longwall face and its target horizon in the coal seam, where we have the shearer at optimal position for both the floor and the roof horizon in the coal seam and the longwall face is straight and level. Our goal is to get us to those conditions by the end of the month, and we have made significant progress to getting to those conditions.

It is an iterative process, Nate, that we're in. We advance the shields, we align the shields.

If there's any fortifying of the coal roof or face, we do that if it's needed, and we do another pass with the shearer, we cut some coal, and then we advance the shields again. We're going through that process right now: advance the shields, align, fortify, cut, and we're having some very good success with that.

We're going to keep repeating that process for the next few weeks till we get to this optimized longwall automation position, and then from there we'll be running per forecast. A lot of good progress made in the last two weeks, where every day we move further along with our plan.

We again, feel very good about getting this completed by the end of May, getting out of this commissioning phase, and getting into the regular production mode starting in June.

Nathan Martin

That's very helpful. Jim, appreciate that.

Then maybe just one more if I can. You guys had a small update on your rare earth and critical minerals project there.

Maybe could we just get some thoughts around a potential timeline for that development you'd mentioned previously, as well as today, the possibility of building a pilot plant. Again, just any updates on timeline would be great.

Thanks.

Jim Grech

You're referring to the grant we got from the Wyoming Energy Authority to build a pilot plant. We're looking at building it at the moment at our Rawhide Mine is the site at the moment, but there are some other sites being looked at.

We expect the development operations and so on to take about 18 months, and then you're going to have some time after that of a year or two to get it up to full development of the plant. We're going to work on the siting first, and then initial construction, and then get it operating hopefully at some extent 18 months out, and then over that 18 to 48 month timeframe just keep ramping it up, and with the project.

That's what we're doing on that one project. I just want to remind you, though, that we've got several opportunities that we're pursuing.

We've got this option-based approach because we've got multiple feedstocks, whether it's coal or overburden, and looking at other of our mines. We have other projects underway.

We're not ready to talk about them yet, but this is the one here that we're talking about at the moment.

Nathan Martin

All right. Thanks for that, Jim.

I'll leave it there. Appreciate the time, guys, and best of luck.

Jim Grech

Thanks, Nate.

Operator

Thank you. The next question comes from George Eadie with UBS.

George Eadie

Good day, team. Hope you're well.

Jim, your audio was muffling, I think, before, sorry if this is a bit of a repeat. What specifically at Centurion, sorry, were the electrical and mechanical issues experienced, and were there any issues with the shields not bearing the roof weight properly due to roof conditions or undulations at all in the roof?

Jim Grech

George, I'm not sure why. I'm right next to the microphone and I think I'm talking loud enough.

I'll start screaming into this. Are you hearing me okay right now?

George Eadie

Sorry. Now I got you good.

Jim Grech

If you hear me catching my breath, it's because I'm talking at the top of my voice. What we've had is a longer than anticipated commissioning period at the mine.

To get to the situations you talked about, during the initial commissioning, we encountered some unexpected electrical and mechanical issues that we hadn't picked up, we did testing, we did a mini build on the surface to test the equipment. Once we got the equipment underground, put it together, and put it under full load conditions, we started having some issues with it.

Fundamentally what happened with that is we had eight-year-old unused mining equipment. We put updated technology in it and then we put it underground.

When that got under full load, we started having issues that we weren't anticipating electrically, and we had to troubleshoot that, order parts, and repair. Once we got past the electrical issues, we had some mechanical issues with conveyors and chutes and so on, what I would call standard commissioning issues that you have with this type of situation in a new mine and equipment that's been sitting on the shelf for a while, all taking much longer than we had anticipated.

With that situation, going in and the longwall sitting, and what happened was the longwall was advancing very slowly during this commissioning period. This slow progress of the longwall gave rise to some localized ground conditions where the longwall was sitting.

We had moisture accumulating in some roof cavities and above that combined with the softening of the floor beneath the shields. The roof conditions have been addressed with void fill and are under control where we have the longwall right now in its current position.

The floor conditions we've adjusted to, but what's happened is with the floor conditions, we've got misalignment in a limited number of shields. That really is where we are in the final stages of remediation that I had outlined to Nate, is getting those shields in alignment.

The only way to do that is to advance the longwall, adjust the shields, advance the longwall, adjust the shields. That's going to take us another week or two to do that.

We anticipate getting through that by the end of the month. Each time we advance, we progressively improve with our remediation.

Once we get a little further along here and we get onto some fresh ground underneath those shields, we'll be going at forecasted rates. George, did I answer the question you had asked there?

George Eadie

That's super clear and exactly

Jim Grech

I'm assuming you can hear me.

George Eadie

Yep. No, that was great.

Thanks, Jim. Appreciate that.

Are you guys testing the shields to make sure they're carrying the roof load? Is that something you can do and are doing, I guess?

Jim Grech

The shields themselves are performing well. It's just they're out of alignment, and we just have to get them straightened out between the floor and the roof.

That's really what's going on here at the moment, George.

George Eadie

Okay. No, that's super clear.

Thanks a lot, Jim. Then maybe one quickly for Malcolm, just margins in the PRB just over $1 a ton, a few questions on it before and we've guided down there.

Are there risks to margins getting back sort of $2 and higher going forward with U.S. gas prices at $2.80 and cost pressures impacting on the other end, too?

Malcolm Roberts

Look, with where oil prices are at the moment, margins are being challenged, and also this quarter with lower volumes being in shoulder season. However, one thing that's pretty evident is that electricity demand is continuing to increase.

I think we've just seen the statistics for April. With this increased demand, we get out of shoulder season, get into the summer.

I still expect the spot market to be quite robust, and for pricing, as we move forward, to reflect this higher cost base. Because I don't think anybody's on their own in terms of the dirt that needs to be moved and the cost of that diesel.

It's a function of the higher cost base being reflected in new deals and the like as we work through that.

Mark Spurbeck

George, I might just add to that. If you look at the implied guidance, the cost and the additional volumes coming in the second half of the year, we're going to be back to margins right within spitting distance of $2 a ton.

George Eadie

Yep. Okay.

That's clear. Thanks, gents.

Operator

Thank you. Once again, please press star then one if you would like to ask a question.

The next question comes from Nick Jarmoszuk with B. Riley Securities.

Nick Giles

Yes, thanks, operator. Good morning, everyone.

A lot of my questions had been answered, but just maybe on the seaborne met cost revisions, I think most of which were driven by Centurion timing being pushed out. Can you just touch on the other operations and where costs stand today at those mines?

I think diesel isn't as impactful as the PRB, but was wondering if anything has changed as far as input costs at your kind of non-Centurion operations. Thanks.

Mark Spurbeck

Nick, good morning. I think I'll start with the two changes we made to the guidance for the full year.

In the thermal segment, PRB is up 50 cents on a full year basis. That's entirely due to higher diesel pricing.

Seaborne thermal, as well, up $2 a ton for the full year, entirely due to higher diesel pricing. The seaborne met, that is up $15 a ton, and that's entirely due to the lower volume at Centurion.

Now, there is some higher diesel costs obviously in met and other U.S. thermal, but that's a much smaller use.

Two-thirds of the U.S. oil or diesel is used at the PRB, and about two-thirds of Australian fuel is used in the seaborne thermal segment.

The seaborne met and the other U.S. thermal, much smaller impact from diesel, and we were able to maintain those original cost guidance ranges.

Nick Giles

Got it. Very helpful.

Appreciate that, Mark. Then maybe just one on the Centurion product itself.

Can you just talk about how the commercial process has gone to date with customers? How much is contracted?

How much is left to still be contracted? Then do you feel that with the higher freight rates globally, that Centurion has become more competitive?

Or how are you thinking about kind of a percentage realization in terms of PLV? Thanks.

Malcolm Roberts

Thanks for the question, Nick. Look, the customer generally discussions have gone very well because this product is the highest quality premium hard coking coal at around an 8% to 8.5% ash.

In terms of where it's being sold, traditionally, North Asia would has been a big customer when this mine was producing last decade. There's strong demand there.

Really the main focus is on India. We've concluded a number, probably eight or nine contracts, there.

In terms of how contracted I am for the year, I'd like to treat that as commercially sensitive, but there's plenty of demand there for that product. Hopefully that answers your question.

Nick Giles

That's helpful, Malcolm. Guys, I appreciate the update.

Malcolm Roberts

Thanks, Nick.

Operator

Thank you. The next question is a follow-up from Chris LaFemina with Jefferies.

Chris LaFemina

Hi, thanks, operator. Guys, just one quick follow-up.

If you look at the outlook for the business, if you hit your operational targets, you're going to be generating lots of free cash flow second half of this year and into 2027. Your balance sheet is very strong.

Your share price has been under some pressure, but it really seems like it's a timing issue on the cash flow rather than anything more structurally problematic. Yet, you have an opportunity in the market to buy back your stock at a relatively inexpensive level.

I was wondering how you think about the share price weakness and how you can defend the stock. Maybe that's the way to think about it, but can you take advantage of an opportunity here where the market is not pricing in the cash flow that you guys are going to generate, and maybe the opportunities to buy back your stock at this relatively inexpensive level?

Thanks.

Mark Spurbeck

Chris. We share your outlook for the business.

Certainly when Centurion comes back online or gets online at full production rates in the second half of the year, there will be a substantial amount of free cash flow in that second half of the year. I think there's a couple of opportunities, buying back shares is one, but also looking at our 2028 convert that's outstanding, and addressing maybe some of the dilution there as well.

Chris LaFemina

That makes sense. All right, great.

Thanks. Appreciate it.

Operator

Thank you. The next question is a follow-up with George Eadie with UBS.

George Eadie

Thanks, guys. Jim or Malcolm maybe, but when will we get some details on this PRB West Coast opportunity?

I guess chasing potential tons you could ship, washing, cleaning costs, capex, and sort of timelines, and all the various factors for us to potentially model it up? Look,

Malcolm Roberts

I'll start, and maybe Jim could give some further details. Look, this cargo is going to go out in May, and we'll get customer feedback.

We've got another customer visiting our PRB mines, oh I think it's next week or the week after. We're in a detailed qualification process there.

We'll discharge trains, and the first one's discharged down in Mexico this week, and we'll see how that goes. We'll load it on the ship, and see how that goes, and then get the ultimate feedback from the customer.

One thing is for sure is that there are opportunities and people are really focusing on this, and that the railway, particularly Union Pacific, is working with us really constructively. That's encouraging.

Then you're also hearing about other West Coast port opportunities. Exactly where we go with the Port of Guaymas, that's going to be a little bit of a suck and see.

Let's see how the port performs and the like. This is more of a proof of concept and the like.

In terms of capex and the like, well, we'd be leaving other promoters to develop ports and do those things. We'd be users of those ports and the like.

I hope I haven't said anything out of line here. I'll just check with Jim if there's anything he'd like to add.

Jim Grech

No, Malcolm, I think that the thing to take from this, George, is Malcolm said proof of concept. Most importantly, is there a market for this coal?

As Malcolm pointed out, there's a significant, almost unlimited market in terms of what the PRB can produce and move as far as demand because of the comparably very favorable comparison to Indonesian quality coal, which is big on the export market. The opportunity is significant.

The proof of concept is us working with the Union Pacific Railroad, who've been very good to work with, with the U.S. government, the Mexican government.

Can we then do the logistics to move the coal to this very large market? We've done that.

The next steps are how do we scale this up? How do we get significant tonnages?

Whether that's through Guaymas or other ports that are being looked at on the West Coast that are being looked at actively, then I think there's some great opportunity there for those ports to move this Western coal. There's a lot more opportunity to come.

Is it on the horizon, like in the next three to six months? No, there's nothing significant because you need to get the port capacity there.

The demand is there, the demand's not going away, the ability to work with the rail carriers and the U.S. government to develop these opportunities is there.

There's a lot of good potential for us out into the longer term, but not just in the near term.

George Eadie

Yeah. Great.

Thanks, Jim. Just on that, what is the port capacity you guys could tap here?

Is it sort of 5 to 10 million tons? Is that the right range for me to think?

Jim Grech

I think it's what's the port capacity potential. Guaymas could get to those ranges or slightly higher, and other ports that are being looked at on the West Coast would be at the upper end of that range.

George Eadie

Awesome. Cheers, guys.

Operator

Thank you. This concludes our question and answer session.

I would like to turn the conference back over to Jim Grech for any closing comments.

Jim Grech

Thanks to everyone for your time today, as well as your longstanding support. We're going to get back to work, and look forward to keeping you apprised of our progress.

Operator

Thank you. The conference has now concluded.