Sibanye Stillwater Limited

Sibanye Stillwater Limited

9.26
USD
-0.53
(-5.46%)
6.01BMarket Cap
Mar 03Next Earn

Q2 FY2026 · Earnings Call TranscriptSeptember 1, 2026

Richard Stewart

Okay. Good afternoon.

Good morning, everybody. Schalk, can I check we are online?

All good. Thank you very much.

Good afternoon, good morning, evening, those joining us online, welcome. Just before we kick off with the formal part of the presentation today, please just take note that obviously there are a lot of forward-looking statements, please note the safe harbor statement.

Before we kick off, listen, I would like to just invite George Coetzee, our head of safety, perhaps just to share a a safety moment with us. It is how we start all of our meetings in in Sibanye.

George, over to you. Thank you.

George Coetzee

Thank you, Richard. Good morning, good afternoon, good evening to everybody online and in person.

Thanks for the opportunity. I think before we begin the formal session, Richard asked me to do an opening safety moment.

I'd like this opportunity to reflect on the recent Nepal flooding catastrophic incident that we have seen. I was reading last night that as of yesterday, 950 people have passed, and there were still around 4,400 people missing.

We do extend our sincere condolences to all all involved, an absolute tragedy. What started as an unexpected rock and ice collapse rapidly escalated into a devastating disaster, reminding us that catastrophic events often emerge from hazards that are unseen, poorly understood, or outside our current experience.

Within Sibanye, we have seen that approx 90- approximately 90% of our fatal incidents are linked to our 18 group minimum standards. These are known fatal risks, and reinforces the importance of rigorously applying a critical control management process, verifying critical controls, critical life-saving behaviors, and critical management routines every day.

These are all included in this fatal elimination booklet that has been signed off by each and every person in the company and contractors committing themselves to these standards. There's also another important reality.

Approximately 10% of our fatal incidents occur outside these known standards. These include both in-service and criminally-related loss of life incidents.

We have seen of that of late in the company. These are the events that challenge our assumptions, expose blind spots, and reminds us that not all catastrophic risks are visible on a risk register.

The lesson from Nepal is that managing known risks is not enough. Catastrophic events often develop from weak signals, changing conditions, and hazards that have not been fully recognized or understood.

As leaders, our responsibility is twofold. Firstly, ensure our critical controls are effective for the risks that we know.

Secondly, remain curious, vigilant, and encourage and courageous enough to ask, what are we missing? What has changed?

What could hurt us that we have not yet considered? Thank you.

Richard Stewart

Awesome. Thank you very much, George, and a real reminder of the very volatile times we're living in.

Once again, welcome. I think thank you very much for joining us today.

It's a real pleasure to be able to to share our results with you. I think just as a as a very brief introduction, in January of this year, we shared with the market our refreshed strategy.

Now this was a strategy that spoke about how as a company we were going to create a future-focused, a high-performing future-focused metals business. Today is not about strategy.

What I would like to do is just a a brief refresh of what we presented back in January, because what today is really about is how are we progressing on this journey. Just a quick sound bite.

There are two or three parts to the strategy. The first one is the piece in the middle that actually describes not what we're doing, but who we are as our business.

It's our purpose, it's our values, it's our stakeholder ethos. That hasn't changed.

I'd dare say that part of the company supersedes any management changes or any external events. It's who we are, it's what makes us Sibanye.

That hasn't changed. The left-hand side is what our short-term priorities are.

Short-term, we said a couple of years. That's strengthening the business fundamentals.

If I could just try and summarize that very high level, what we mean by strengthening the business fundamental fundamentals, it's getting our operating margins increased. We all know how we do that, costs and production.

We don't control price, but that's how we drive revenue. That's our operational excellence strategy.

It's about improving our effectiveness and efficiencies through our operating model. It's about increasing our return on capital and enhancing management focus through simplifying our portfolio.

Ultimately, we identify two enablers, looking at a systemic approach, a real enterprise thinking approach, and through, I guess, what is the glue of our company, our culture, our performance culture of care, caring for people. If we got all of that right, then it comes down to we should be generating a lot of cash, and how do we allocate that cash, our capital allocation model.

We shared with you we had three priorities: shareholder returns, our balance sheet, reducing our debt, and ultimately investing in the sustainability of the business. If we got those fundamentals right, I think as a company, we've learned the best way to grow is to be able to be agile and have flexibility with regards to time.

You make your best growth in decisions at the right time in the cycle, at the right assets where you can add value. That requires flexibility.

If we get that right, we'll have the flexibility to grow in a value-accretive manner, which is the key point there. We also highlighted that we had a portfolio of assets that we already have within our existing portfolio.

We don't have to go out and join expensive M&A sales processes. We actually have a portfolio of assets ourselves which we could develop, that have significant value to us, and that was our focus.

Today, what we're going to touch on and really, I guess, hopefully show you is the three boxes we've highlighted, specifically around operations and margins, capital allocation, and growth. How are we tracking on the strategy that we put out at the beginning of this year?

Let me apologize upfront. I do understand there was a delay with our results going out from the JSE.

Unfortunately, there were some technical issues. Many of you may not have had a chance to digest the numbers yet.

I I do apologize for that. Uh not much we could do unfortunately, but glad it could get out and we can at least be on time now.

Uh but just to give you some of the the real headline numbers, starting at the top with our first priority, safety. Uh I do have a slide where I'm going to unpack that a lot more.

We've had a great safety performance, whether we benchmark it against our own history, against peers, how we doing locally. Uh we've actually had a great performance.

However, we still lost colleagues in the second quarter of this year. Until we can eliminate fatals, we have not yet achieved our ultimate safety focus.

We've had a spectacular run of commodity prices, absolutely. It has been a a very volatile, but a high-price environment for the first half.

Also full credit to our teams with a solid operational underpin, highest revenue ever for the company for a six-month period. That's very pleasing.

Our EBITDA more than doubled. I think what's relevant to point out there, last year this time we actually had a a big EBITDA kick because we in the US recognized two years' worth of Section 45X.

If we normalize for that, EBITDA was up 200%, almost three times. The one that matters to us, and if you saw that strategy, it was about cash and margins.

That's what we can control and drive. Record net operating cash, a great achievement, and solid margins.

Whether we look at EBITDA margins, whether we look at all-in sustaining cost margins, you'll see later we are happy with where we are competing within our business. That's led to the value.

We are declaring a dividend today. Schalk will share that in detail.

Uh and when we look at the yields of that, it's certainly one of the highest yields in the in the industry amongst our peers. We've had a significant impact on our debt, which was one of our big objectives at the beginning of the year.

We've also managed to fund organic growth. Today we'll share with you two new projects that our board has recently approved in Burnstone and Mount Lyell.

A very exciting uh pipeline of projects that we've got coming through. All in all, I think a a six-month period for which we are very proud, and has certainly helped us progress our strategy, I'd dare say, a lot further than I imagined we would 12 months ago when we put that together.

I do just want to touch on safety. Uh there is a reason safety features in the introduction and not the operational sections, because this is our number one priority.

Why? Number one, it's people.

Uh we are a people's business. Safety is all about people.

The second reason is for me, if there's one measure to tell you how well your business is doing, it's safety. To get safety right, you got to have your infrastructure working.

You got to have your people working according to planned processes and delivering, and you need people to feel like they belong and are contributing to the safety culture. To get this right, you got three metrics you can see in one.

I think this is why that continued downward trend when we look at our lagging indicators is so pleasing. We've been on a definite safety journey for the last five years.

We can see it's reducing risk. We can see it's having an impact.

We do still have a way to go, of course. Certainly in terms of historical performances and a lot of the improvements around us, we are very proud of this.

Nevertheless, we had a fatal incident in our PGM operations in the second quarter, and we had one in our gold operations in the also in the second quarter of this year. Having gone a quarter fatal-free, tragically, the second quarter, we lost three colleagues.

Our sincere condolences go to the families and friends of those colleagues: Khanyile, Tebohlo, and Kulisa. A question we often ask, and we actually asked this at a big industry safety day yesterday is, do we believe fatal incidents are preventable?

I put one point on that slide that I'd just like to unpack, because last week we celebrated a significant event. Our Driefontein operations went one year fatal-free.

The reason I raise that, Driefontein is the second deepest mine in the world, slightly deep, slightly shallower than Mponeng. That means it's got intense seismicity, it's got intense heat, it's got intense water.

We put 7,000 people underground through more than 50-year-old infrastructure every day through three shaft systems. Arguably on an inherent risk basis, that is probably the most dangerous mine in the world if you want to look at inherent risk.

We've got the controls, we've got the methods, and we've got the people to prevent fatals in that environment. If we can do it at Driefontein, we can do it anywhere else in our business.

If we've got other mines that go for five or six years fatal-free, we can do it across our business. Fatal incidents are preventable in the South African mining environment.

We believe that as a company, and this demonstrates it. I think the last point I just want to make is you would notice, and George did mention it, we've lost three colleagues through safety incidents in our mines.

We've also lost three colleagues to crime, crime directly related to work. A loss of life is a loss of life.

That is also preventable. Today I want us to acknowledge those loss of lives.

I want us to appeal to all stakeholders, these are preventable. It's not something we can do alone, but we committed to preventing it.

We're appealing to all stakeholders to work with us in addressing this epidemic in South Africa of crime. It must stop.

Enough is enough. Ladies and gentlemen, with that, I'm going to hand over to the team who will take you through the results and uh pick it up towards the end.

Thank you very much. Glyntha.

Kleantha Pillay

Hello, everyone, and good to see all of you again. I'm just going to talk through three very quick slides today.

We'll cover off macros, um the precious metals, and then of course lithium, which has been quite an exciting market in the last couple of weeks. On the macros, I mean the war in Iran has really resulted in downgrades to global growth forecasts for the year.

Of course the longer it takes to resolve the conflict, the greater the potential economic consequences. There's been limited flows of oil and other key industrial appli- supplies like sulfur, aluminum, and helium out of the Strait of Hormuz.

This of course increases the risk of shortages, leads to higher inflation, and then of course impacts on spend and growth. Tariffs and sanctions, as you may have seen in the last few weeks, is back on the agenda.

That, again, impacts investment confidence and adds risk to the forecasts. It also possibly pushes out risk into 2027 as well, we could see some further downgrades.

Global growth for this year is forecast at 2.5%. The US is proving to be fairly resilient at 2.3%, China easing a little bit, and the eurozone unfortunately remaining lackluster.

Looking on at the precious metals, prices have consolidated after the massive speculative buying push that happened for both gold and platinum resulting in record highs in January. In general, the dollar strength and the higher interest rates are usually a headwind for gold and PGMs.

Encouragingly, the net central bank gold purchases have continued through the first half of the year. The market liquidity has also improved as both gold and PGM and platinum ETFs have declined.

Gold lost about 2 million oz in in PT- in ETFs over the half, while platinum ETFs were down just over 0.5 million oz as all the investors look to take profit. It's helped liquidity, and it's certainly helped interest rates coming uh sorry, lease rates coming down significantly.

Then onto lithium. Lithium hydroxide prices climbed to a peak of almost $28,000 a ton in May, and that's the highest it's been since August 2023.

From the beginning of April until the middle of May, lithium prices were driven even higher as supply availability was limited, largely by the Zimbabwean government's export ban. At the same time, demand continued to grow for batteries, particularly in energy storage systems and in electric vehicles.

We had cathode producers beginning to restock for this demand. Prices then fell back a bit on the resumption of supply and exports from Zimbabwe as well as a number of announcements and rumors of possible mine restarts in China, Australia, and the DRC.

In Q2, the price for battery-grade lithium hydroxide declined 9% and was averaging $23,000 a ton. Today prices are a bit lower, but still at a $21,000 per ton number.

We expect these prices to decrease somewhat as new supply comes online in the second half of the year, but we can't foresee this dropping below the levels of 2025. I think just in in summary on markets, clearly biggest risk right now is downside risk, and that is from the macro environment and also the geopolitical uncertainty.

I'll now hand you over to Richard to talk through the South African operations. Thanks, Rich.

Richard Cox

Thank you, Glyntha, and hello, everybody. I think two quick points before I get into the numbers.

The South African operations converted stable delivery into real leverage this half. PGM and gold both printed high all-in sustaining cost margins, 44% and 32% respectively, and together, they generated the bulk of the group cash.

Second, we're not standing still in the portfolio. On PGM, we're putting capital into shallow infrastructure-backed extensions that hold a 1.5 million oz underground production profile.

In gold, we're producing more surface ounces. We're funding the Burnstone project, and we're also taking a tighter look at what remains economic at our Kloof operations.

I'll take the PGM business first, and then followed by gold. In our South African PGM business, production was consistent and in line with guidance, 790,000 4E oz.

It was 2% lower year-on-year, and that decline almost entirely from surface sources. Underground production, including or excluding Mimosa, was actually up 1%.

Our K- K4 operation added 10,600 oz, up 24%, which offset planned plant maintenance at the Rustenburg UG2 concentrator. Also at the end of the half, we had 15,000 oz that were on stockpile at the half-year mark, and that will be processed in the second half.

All-in sustaining cost was quite pleasing at 26,252 rand per 4E oz. It was 10% higher year-on-year, and that is the number to hold.

Roughly 1 billion of the increase is royalties and higher basket, and that was about 60% of the unit cost move. The balance is inflation and consumables, offset by chrome and other byproduct credits.

The chrome operating profit was 1.1 billion. All-in sustaining cost was slightly below the guidance, and I'll speak a little bit more about that later.

Against the 67% higher basket, adjusted EBITDA was 19.2 billion. That was up 302%, all-in sustaining cost margin of 44%, EBITDA margin of 45%.

Notional free cash flow was 10.4 billion, that was 9.9 billion higher year-on-year at a 54% conversion. Standing back, this is the operational leverage that we said the portfolio has when delivery is stable and prices move.

In the second half, all-in sustaining cost will lift. It'll lift because as our planned development and stay-in-business capital step up, and we are managing that inside the guided range.

Our K opera- K4 operation is doing what it was built to do, up 24%. Those are new, lower-cost ounces of capital already spent.

Chrome remains a material stream. At 1.1 billion of operating profit, volumes were down, and that was after the BTT plant stopped as planned in the second half of 2025 when remining the tailings storage facility was completed.

The remaining stream still matters, however, and chrome should contribute more as the UG2 feed is prioritized going forward. This is very deliberate, as we outlined in our market strategy day recently.

The brownfields program is shifting the mix towards UG2, the chrome-bearing reef, chrome is part of the same quality of ounce plan. Total capital was 2.6 billion.

It was up 4% against a full-year plan of 8 billion. Across ore reserve development, stay-in-business capital, and projects, only 1/3 of the year at the half, and spend does accelerate in the second half as stay-in-business and project spend pick up.

At the bottom, you can see our brownfields project pipeline is sequenced. We have projects in execution, Siphumulele and Thembelani.

That's existing infrastructure and continuity at Rustenburg and more mechanized mining. Western Limb Tailings Retreatment is our surface sources, lower risk, and we're currently building out the chrome circuit.

In study, a number of projects: East 4, Kponeng, East 3, Ba-Tebele, as well as the smelter. These are gated on returns, affordability, as well as readiness.

The point is not to build everything at once. It is to hold about 1.5 million underground ounces a year, lift the UG2 mix, and raise the mechanized share.

All this without an acquisition premium. We're moving towards a lower risk, shallow, and more importantly, it's actually on our footprint.

Gold is the same idea in a different shape. Mix and price more than offset a tougher underground half.

Production was 294,000 oz, or 2% down. Underground was 9% down.

Surface was 13% higher and is now 36% of the mix. That is a structural shift, and it's how the result held.

Kloof was rebased in the second half last year as we reduced exposure to seismicity active ground. Kloof 7 is closed.

Beatrix lost high-grade access after seismic damage to footwall infrastructure. Very important to see the plant recoveries at Beatrix are improving on the maintenance intervention.

Driefontein was roughly flat year-on-year. Cooke was up 11% on third-party material, and DRDGOLD produced 2.5 tons of gold, up 10% on yield.

Costs are up, and we should be precise as to why this is: shaft infrastructure maintenance and winder upgrades to keep shafts serviceable, additional voluntary shifts in a high-price environment. Those shifts actually pay their keep.

At Kloof, ore reserve development and stay-in-business capital are now expensed because of the shorter remained life. At Driefontein, water pumping costs is higher on electricity and additional fissure water.

At Cooke, plant upgrades for future life, plus double handling and batch feeding of third-party ore to improve recovery. Third-party net cost is also higher, and we all appreciate that because if the gold price is high.

In gold, not a cost overrun story. It's planned work.

Uh we encounter these challenges, and these are actually around known constraints, and it leaves us with a far lower risk in their underground business. Gold sold was up 5%.

The average price was up 35%. Adjusted EBITDA was at a record 9 billion, up 87% at a 39% margin.

Notional free cash flow was 3.9 billion, and cash generation up 267%. The gold business in a nutshell, as noted, fewer underground ounces, but more surface ounces, spend we can explain shaft by shaft, and a price that converted that mix into record earnings and cash.

Delighted to announce that Burnstone is approved. A project of about 130,000 oz a year at steady state, a 25-year life, Kimberley reef at about 550 m below surface.

The board has approved 98 million for 2026. The existing shaft, decline, and surface infrastructure are already in the ground.

We are not buying a greenfield premium. This is reserve replacement in a shallower, lower-risk ounce to offset depletion from our deep, conventional mines.

Our surface gold business is already working: 105,000 oz, up 13%. That's DRDGOLD plus our own surface business, and reduces how much of the result depends on deep-level production.

The Kloof operation still has optionality. Remaining reserves are under assessment.

Nothing is committed. Any additional extraction has to clear returns and affordability.

We will not stretch the plan to chase ounces that do not earn their place, and at a price point of about 2.4 million rand a kilogram, we can look at that properly for life extension to about 2029, that adds three more years, and also looking at including whether a hedge book is the right way to underwrite a specific block of work. The value of the gold business to business today is the record EBITDA.

It's the cash and the growing surface share. It's the transition to Burnstone, DRDGOLD, and the Kloof assessment.

The future we are all aiming at is a shallower, lower-risk, higher-margin gold portfolio. Thank you very much.

I'll stop there, and I'll hand over to Charles.

Charles Carter

Thank you, Richard, and uh good day. Um, I'm going to talk to the international mining and recycling uh business.

I'm going to start with the US PGM operations. Certainly year-to-date, you've seen a resilient uh production in line with our guidance.

Uh we produced 138 kilo-ounces of uh palladium and platinum. This was 2% lower year-on-year, uh but within our plan.

Our ASIC margin came in at 12%, and our all-in sustaining cost, when you include the 45X credit, came in at uh $1,347 an ounce. That's 12% higher year-on-year, and that really reflects the planned development and the mechanization investment now underway.

Our adjusted EBITDA was 28% uh margin and uh an actual adjusted EBITDA of $66 million. That's 56% lower than the prior period last year, and Rich- Richard touched on this, which has to do with the fact that we booked a very high uh credit for foot- Section 45X in the first half of 2025.

Uh so what you've seen year-to-date in the Montana operations is a 52% reduction in cash outflow to negative $28 million notional free cash flow. Um that that that's an improving trend of cash conversion, and it's supported by higher um palladium and platinum prices, particularly in the first quarter of this year, um while we use proceeds to fund our uh mechanization process.

At the um Investor Day earlier in the year, Kevat Robinson and uh Matt O'Reilly spoke at length to the mechanization process now underway. Um if we look at our internal milestones on how we tracking, in the first half year-to-date, uh we've done a lot of work on mind development, spend on that to get get set up properly.

Um we we have successfully trialed mechanized bolting, a ZB21 bolter at Stillwater East, with very good uh results. We've done a lot of work on the operating model to set up properly for moving um to task mining and team-based uh mining, and incentivized in a different way going forward.

Year-to-date, our ASIC cost has come slightly below guidance. To Kevin and the team, it's been a lot of hard work, and it's been really good work.

I think if I look at the second half that lies ahead now, we we have a number of critical steps in front of us, and probably the the toughest one we navigating right now is to conclude our uh union labor agreements. We have two different agreements underway.

We have the Stillwater uh mine and the MET in one union bargaining unit, and we have the East Boulder mine in a second. We've been at this for the last two months.

It's work in progress. I'm hopeful we will get a landing soon, but it is complex work.

Uh and it's a a workforce that is having to look at changes to the way they do work, the equipment they use, the the the move to task mining and team-based incentives, and an incentive structure that is that is looking at safety, and it's looking at mining to plan, um and it's looking at ounces, and it's looking at the movement of rock and the processing of rock, and it's got multiple metrics about quality mining and and quality as against plan. That is a significant shift from the legacy incentive scheme, which is really focused on the miner and tons broken.

It's a very important step to us to get right, and it's a key underpin for the future of this mechanization drive. Um we've got work ongoing in the second half on infrastructure, uh upgrades to sand plant and control shoots, um and we've got a lot of work around capability of our management and our supervisory uh tier.

If I look forward and we're getting that right, and I ask, what does '27 look like? We we should be well on track with Stillwater East mine now now getting fully mechanized.

Um we we will have East Boulder's coming slightly behind, and that was detailed at length in the Analyst Day presentation by Matt, um with with readiness and setup next year, infrastructure setup, um ventilation upgrade, and the like. Um and then and then from the start of next year, we'll implement a new performance management system, and we'll focus very much on work execution.

If I roll that forward and and we we we track in according to our game plan, um we should be seeing by that point in 2028 a real step change towards the $1,000 an ounce. We should be um seeing significantly improved productivity, improved stope availability, and mechanized task mining now fully fledged.

That'll all be about team-based execu- execution and a pro- and associated reward. This really is about a a medium-term setup for world-class ore bodies that have uh significant long-term optionality.

We have to get this right. We have to move down the path we on.

I think there's excellent work underway. Um none of it is easy, but you'll see from the first six months, we had outstanding safety performance.

We had mining against plan while all of the change intervention was starting to land. Full credit to all the teams involved in that.

If I turn to the recycling business, um which is led by Grant Stuart, and Grant is here with us today, um this year-to-date is really about scale, integration, and margin expansion driving really strong cash generation. I think it's an outstanding performance by the team.

You will recall that this is a team that's just integrated two acquisitions in the last 12 and a 12 months to 2 to year and a half. Uh and what you've seen in these numbers for the first time is really the the wins that are now starting to come through.

So 13% adjusted EBITDA margin, $164 million uh adjusted EBITDA, and and significantly, strong cash generation that goes with that, $103 million. Um and that's a 63% adjusted EBITDA conversion.

Um what sits behind that is is a lot of work on on finding the synergies between the the the PA site, the North Carolina site, and the Columbus MET. Um you the the the Pennsylvania site really significantly increased volumes in the first six months, 2.2 million oz gold equivalent metal produced; North Carolina, 0.5 million oz gold equivalent metal; and Montana on the on the autocats, uh 100,000 uh ounces gold equivalent.

Year-on-year, that's a 142% increase uh in precious metals and uh coming in on a combined basis at the equivalent of 2.8 million oz. A really sizable business.

You'll see on the slide the breakdown of the different metal components, but the I think for the two small acquisitions we did and the quick con- cash conversion and the limited capital we have to spend, it's a it's a fabulous platform that that we'll leverage going forward, all credit to the team on that. If I turn to Australia, uh the Century zinc operation, here again you've seen strong cash generation, importantly in in a near end-of-life process.

This is not easy to do, and and Barry Harris and the team, I think, have done fabulous work here. Um they're they're really working with the last year and a bit of a of a plan, and that is always complex work, and you have limited flexibility.

Um they produced 45 kilotons of payable zinc production, um 13% lower year-on-year. Um there And and that talks both to the limitations on the plan, it also talks to a very wet rainy season and the impacts on that, maintenance work and a and a and a couple of other things they had to navigate.

The production was in line with guidance. Um the all-in sustaining cost was at the lower end of the guidance range, uh $2,162 a ton.

Um and the all-in sustaining cost, given the limited flexibility and what they had to navigate, was 23% higher year-on-year with production down year-on-year. The adjusted EBITDA of $55 million, that's 54% higher year-on-year, and the average zinc concentrate price, 25% higher, but it's it's lower treatment charges and it's really good contracting that really made the difference on that on that delivery.

This is about operational resilience, maximizing higher zinc prices on a near end-of-life asset, and I think really good work underway. Um $41 million notional free cash flow, which is 86% higher year-on-year, really strong con- cash conversion there as well.

Lastly, if I turn to Keliber uh lithium project, I think as you're well aware from the from the Analyst Day we had, um we we now have mining fully underway. Um it's it was initiated in February.

Um we we starting to get the run rates we want there. We are navigating all of the usual complexities of a start-up open pit.

It's about the sequencing of ore, it's it's about dealing with um slightly higher sulfate content than we'd expected in certain parts of the pit, that that has impacts on how we look at our our uh rock dump placement and our water treatment processes and the like. We're hitting the run rates, and and I think that's all good work.

Um we we have exceeded our strategic stockpile build, 218 kilotons mined, 186 kilotons stockpile to date, and that provides really the security for a controlled concen- concentrator ramp-up. Um the concentrator commissioning is underway, what the team has been working on year-to-date is really trying to get steady-state volume and volume throughput to the right levels, and they're starting to hit the numbers there.

Now they're swinging into looking at grade improvement and quality improvement, so that's really the task in hand being worked as we speak. Um the capital spent to date is on plan, €719 million, and that's within a €783 million budget.

Lastly, um and again, we unpack this in detail at the Analyst Day, um so so we've hit our internal milestone on stage one, which is about the mining ramp-up, um and we've exceeded our our stockpile um tonnage. That that for us is is success.

Um we now busy on the concentrator ramp-up, as I noted, um and that's really about about now working on grade. Um and and then once we've got that right, looking at the potential for for for early sales, but we'll judge that once we've got the spec where it needs to get to.

Stage three is is really about the refinery start-up, this is a late-year decision. We we working on getting set up for that.

Um it it it's really late year. It's about all of the cold commissioning taking place, and then there'll be a judgment around what the market conditions are telling us about spodumene sales and about refinery start-up moving moving to battery grade over time.

Um so there's a market-related judgment down the track late year, and also a quality assessment of the ore that we have for processing in the refinery. Really what that does is it takes you into 2027 and early next year with with expected hot commissioning at the refinery and ramp-up, and um again, late later in the year really looking at the decision to to proceed to battery-grade uh product.

Thank you. With that, I'm going to hand off to Schalk um to take us through the finances.

Charl Keyter

Thanks, Charles, and good afternoon, ladies and gentlemen. What does everything mean that Charles and Richard have um explained?

Let's pull it all together in the numbers. I'm really pleased to uh report on a very strong set of financial results.

It's not often as a CFO that you can stand up and report on a strong set of results, but today I'm really pleased, thanks to solid operational delivery and supportive commodity prices um to report on the financial performance of the group. If we start out with the highlights, um importantly, the strong operational performance was supported by favorable commodity prices.

If we look at the PGM basket across South Africa and and in the US, that was up approximately 70% year-on-year. SA gold up 35%.

Then as Charles reported, in Australia, the zinc price was up 25%. Against that backdrop, we remain on target to meet our operational and financial guidance.

Adjusted EBITDA came in at a margin of 35%. On a absolute basis, it was 31.8 billion, and that was up 111% year-on-year.

Cash generated by the operations, and Richard Cox spoke about the power of gearing, cash generated by the operations increased by 531% to just under 21 billion rand, and that represents a 65% EBITDA-to-cash conversion. From a capital investment perspective, we spent 8.2 billion for the first six months of the year, and that was roughly split 60% on ore reserve development and sustaining capital, and then the balance 40% on projects.

If we look at the operational and and financial performance, it resulted in a 216% increase in headline earnings per share. We were up from 190 cents in the in the same period um in 2025 up to 601 cents per share.

Earnings to cash, the conversion was 45%. Then importantly, in line with our strategy that was announced in January, our gross debt reduced from 39.3 billion, which is the H2 reference point of 2025, to 32.1 billion at the end of H1 2026.

That's already an 18% reduction in six months. On a net basis, this translated into a 0.18 times gearing.

For those who have followed the story, this is a significant reduction, um from from the the tough periods of low commodity prices that we have managed to weather the storm. If we move to the financial summary, um I would like to highlight a few key points.

Revenue increased by 64% to just under 90 billion rand, um with almost 3/4 of that contribution coming from the South African portfolio. Importantly, this revenue growth of 64% translated into a 111% increase in adjusted EBITDA, and as I said, a 581% increase in profit.

The strong financial performance also benefited the fiscus, um with royalties, taxes, uh with royalties and taxes increasing to 9 billion rand. Uh and that was ma- that is mainly the result of higher commodity prices and the higher profitability of the group.

Total capital expenditure, as reported, came in at 8.2 billion, but that was down 14% from 9.4 billion in H1 2025. That follow- and and the reason for that is we've effectively completed the major capital expenditure at the Keliber project.

Pleasingly, um the board declared a dividend, a interim dividend of 5.7 billion rand, or 201 South African cents per share, and that is at the upper end of our dividend policy, which, just as a reminder, is between 25% and 35% of normalized earnings. The dividend yield implies the dividend implies a yield of 8% if we look at an annualized number, and that puts at puts us at the top end of our peer group.

If we look at a 12-month trailing yield, we still come in at 6.6%, which also places us at the top end of the peer group. I think importantly, a big strategic lever for us has been addressing our gross debt.

You can see that the debt maturity profile has improved significantly following the refinancing and the the reduction of our bonds. Uh that reduction was $250 million, and we got that bond away against a tough geopolitical backdrop.

I was very pleased with uh with our our internal, or um the internal people that worked on that, but also our advisors that managed to get us through that period of turmoil. As you can see, that the maturity profile remains very manageable, and liquidity is extremely strong with headroom at about 48 billion rand, and that's roughly equivalent to 4.5 times um of one month's operating and capital expenditure.

Our financial policy is to also to always have about two months of available liquidity, you can see that we're in a very, very strong position. I think the the the message I want to leave you with today is that overall, we remain very, very um well-placed to achieve our strategy of reducing gross debt by 50% over a two to three-year period.

Um I will now hand over to Ralph to take us through the organic growth and the project portfolio. Thank you, Ralph.

Ralph Lombard

Thank you, Schalk. Hi, everyone.

I have the pleasure to provide update on our group projects profile. Our equivalent ounce production profile continues to provide a strong platform for future growth.

Um while production would naturally moderate over time without further investments, which will drop to around 1.5 million oz over 10 years, our value accretive project pipeline is positioned to support production, resilience, and improve the quality of the portfolio over the medium and long term. Contributions of Keliber and K4, which is in this profile, already provide an important foundation for this trajectory.

As you can see as this the solid portion of the graph has grown, which now includes our approved projects, which is Thembelani, Siphumulele, Western Limb Tailings Retreatment, and now more recently, Burnstone and Mount Lyell. It materially supports our production outlook over the next five years, and also creates a solid foundation for our future projects, which is in that hatched uh that hatched area on top.

All of those are mechanized PGM projects of relatively low capital intensity. The projects which are still in study phase will continue to be evaluated and sequenced through our disciplined capital allocation framework with a clear focus on returns, affordability, readiness, and strategic fit when ready.

If we look how our projects stack up, on the left-hand side is IRR, and at the bottom is the project capital, all of you can see all of our approved projects demonstrate a robust return, and also our studies in future. We will follow the same principle before we approve those.

We have shared basically all of the approved projects, uh which is in execution in our capital markets day, I will spend a bit more time today on Burnstone and Mount Lyell, which has just been approved by our board. Starting with Burnstone, uh as Richard already indicated, it is a shallow mine for South African gold mining standards, between 550 and 1 km depth.

Our guidance for this year is we will spend about 98 million rand of capital for project setup and start of recruitment. Capital guidance for the total project is around 6.2 billion rand, and of which 3.5 billion is for uh infrastructure development.

Just a reminder, Burnstone will create around 2,500 jobs uh by the time it hits steady state, um quite a healthy net present value of 19.2 billion, and an internal rate of return of 36%. At spot prices, our net present value is around 29 billion and internal rate of return of 45%.

Looking at our build-up, our expected all-in sustaining cost would be around 872,000 rand per kilogram, and we expect to produce around 4 tons of gold per annum when Burnstone is in steady state. On the right-hand side, you will see our capital profile with obviously the bulk of the capital to be spent of the next couple of years.

What makes Burnstone attractive? I think if we look at this, Burnstone sits with a substantial amount of infrastructure already developed.

Think most important is a vertical shaft and our decline shaft in place. Over and above that is we have our TMM fleet available.

When we start mining next year, we can start that quite quickly. We will build up up to 2029 and create a stockpile for our processing facility to start in quarter one, 2029.

Obviously after that, we will have continuous operations steadily building up to steady state. At this stage, we are targeting 2.7 million oz, which form part of our reserve.

With successful execution of Burnstone, that will open up additional 8.9 million oz in future. When we talk about a 25-year life, that's the 2.7 million oz uh you see here.

It's also my pleasure, which we have not shared a lot of information yet in our Capital Markets Day, it's it's Mount Lyell. Like Burnstone, Mount Lyell also sits with a substantial amount of infrastructure.

It's a copper-gold mine in Tasmania. It's uh around the town of Queenstown.

I just want to let you focus on that picture. In that yellow areas, the top north-eastern portion, you see Prince Lyell, Western Tharsis, Cape Horn, and Copper Chert.

Those are the ore bodies we are currently targeting as part of the Mount Lyell project. Think more important if you look in on the south-western side is a staying storage fully permitted tailings storage facility.

Like Burnstone again, we sit with a significant amount of infrastructure already in place, and obviously reduces the capital bill which we need to pay for Mount Lyell. Our guidance for this year, we would spend around $7.5 million for Mount Lyell, and that again will go for project setup, start of recruitment, and mobilization.

Our total project capital to get to uh uh to production is around $340 million. That attracts a net present value in the region of $550 million and internal rate of return of 20%.

If we look at today's spot prices, uh that net present value is uh above a million a billion US dollars and a net present value of the region of 28%. Mount Lyell will also contribute about 300 jobs when it's in steady state.

If we look at Mount Lyell, I think this is quite a nice picture. You can see the old vertical shaft and hoist room uh there in the center.

You'll see some disturbed ground right next to it. That's where our future processing facility will be.

We will start with the decline operations, and then in about three years' time, we will bring in the vertical shaft, which then will allow hoisting to a concentrator, which will be right next to that uh where you see that hoisting area. We spent a lot of time over the last three years to do the feasibility, and a lot of it was focused to engineer out the the safety-related issues which was uh identified with the previous owner when that mine was stopped in 2014.

I think very important is, I showed you those four different uh ore bodies. Instead of focusing just on Prince Lyell, ultimately we will also have Western Tharsis and the other two.

That allows us to to create multiple attacking points, still relatively shallow before going deeper. Life of Mount Lyell is around 23 years.

Another important point is, what liabilities will we carry? Sibanye-Stillwater will manage all obligations arising post-1999.

Anything prior to that will be carried by the Tasmanian government. We also at this stage, our footprint is basically all on disturbed areas for Mount Lyell, and we will maintain it like that.

If we look at the production profile, we expect around 26,000 kilotons of copper, which will come out of that. In addition, around 16,000 oz of gold, and another about 116,000 oz of silver, which will come out when this mine is in steady state production.

All-in sustaining cost is expected around $2.56 per pound. Like Burnstone, obviously initial capital will carry the largest bill.

After that, we should stabilize in terms of capital expenditure. As already mentioned, Mount Lyell sits with substantial infrastructure.

Uh our decline is already connected to our where the mining workings will happen. We sit with the ventilation infrastructure.

We sit with the uh water pumping infrastructure, which is important in this part of Tasmania, which is highest rainfall. Um and established materials handling and logistics areas.

Our biggest focus is to get the concentrator built so that we can uh start to produce uh some product. 78.8 million uh tons of resource and 54.6 million tons of reserve.

That excludes work we're doing currently at this stage on future exploration. What's also important for Tasmania, it will be a relatively clean mine, we will use uh renewable hydro power.

Uh as already discussed, we will stick uh into our disturbed ground area. Also, it will allow us to actually contribute to the future environmental cleanup uh for Burnstone.

Apologies, Mount Lyell. In closing, Burnstone and Mount Lyell demonstrates the strength, depth, and quality of our project pipeline as well as a disciplined approach we're taking to capital allocation.

Thanks. With that, I hand over to you, Richard.

Richard Stewart

Awesome. Thank you very much, Ralph.

Uh just into the last section for the day. Thank you very much.

I've got the pleasure today of wrapping up, just talking a little bit about sustainability. I do this on behalf of Melanie, uh who is our chief sustainability officer.

Unfortunately couldn't be with us today in person, but will be online. I dare say as soon as we mention the word sustainability, we all think soft ESG.

In fact, that's something you don't talk about in parts of the world anymore. I hope I'm going to show you that actually sustainability for us is very hard.

It in fact is what I would argue Sibanye has been built on. We started a company with five gold assets that were supposed to close in six years.

14 years later, they've produced their best-ever cash profit that we have seen out of those businesses. We started our PGM business with mines that were due to close and retrench 12,500 people.

Today we're investing in three projects that'll extend those for another few decades. I dare say it's the same approach we're taking to our US operations.

We've been asked on many occasions, why are these operations still going? It's because we can see a different way of achieving value out of a world-class ore body for decades to come.

That's who we are as a business. That's sustainability.

To be sustainable, we look at it in three aspects: business resilience, and I dare say that's what you've been hearing about today. Where are our margins?

What does our balance sheet look like? How are we operating on a day-to-day basis?

Portfolio resilience, what are we investing in? What is the business going to look like going forward?

How are we optimizing our returns on capital employed? Again, I dare say I think you've heard about some of that today as well as how we optimizing our resource extraction at places like Stillwater.

Then the third aspect is value creation that we call people, planet, and prosperity. All of that comes together in the ethos of our tree.

This is not soft. Let's go on to what this means from a hard business perspective.

In January, we shared with you how we were thinking about capital allocation. We said we've got a capital allocation model that first looks after the resilience of the business.

That's the part on the top, sustaining our ore reserves and making sure the business has sufficient liquidity. What's left over, we'd put into three buckets: shareholder returns, debt reduction with a target of 50% reduction in gross debt, and then life extension or growth where we were focusing on organic growth.

At the first milestone, our first half years, how have we done against that? I think as Schalk shared, very pleasing, the numbers that we've produced, which has allowed us to progress the strategy a lot quicker than I think any of us thought we would, but we are tracking the promises we made.

Dividend at the upper end of the dividend policy that we have comes in at roughly 30% of the cash that we had after operations. We paid just over 36% towards reducing our gross debt, and made a substantial dent in our gross debt, enhancing the resilience of the business.

Investing in our own projects, that is lagging a little bit. That of course has to do with the timing of the projects.

This is why we remain confident that the projects we've announced today, we can comfortably fund over the next few years. With projects like that, there always opportunities to look at some neat funding solutions, at streaming options, at various offtake options.

These of course will be things we would explore. Again, is there risk mitigation there?

Even without any of those, we are comfortable that we have the ability to fund the future growth of the company. I think when we look at the environmental side, two points I'd really like to just discuss today.

Energy, of course, a key aspect across the world and South Africa as well. Today we do have the biggest portfolio of renewable energies of most private companies in the country, but certainly of any mining company.

We've got over 165 MW currently producing today. We see that going up to over 835 MW by 2028.

What's that in numbers for the business? It's more than a billion rand of saving in energy costs for us by 2028.

It's a huge impact in terms of carbon taxes, these are real numbers on the bottom line, and ultimately 50% of our power supply will be within our control. For anybody who's trying to survive as a high energy user five years ago, trying to survive in South Africa, this is a significant relief for us as a business, and I dare say a relief for the country in terms of where excess generation can go.

The next one I just want to touch on is water. I dare say again as a country, it's probably the thing being discussed most I hear today.

Wherever I hear crisis, water's on the list. There are lots of people discussing the water crisis.

I'm not sure how many of us are actually doing much about it. The country needs to be aware, we have a crisis coming.

I dare say El Niño is just going to shine a big spotlight on that. From our perspective at the moment, we are lucky in that we've got our gold operations which are very water-positive.

Today our gold operations are 90% independent, water-independent, 95% in fact at golf. Our PGM operations, today they're in a water-scarce environment, are already 42% water-independent with a very clear plan to get to 90% by 2028.

This is going to be hugely important for mining companies going forward, to be water-independent. This is business resilience.

I think on the social side, again, not going to go into huge detail today. We discuss this a lot, but the point I just wanted to leave us with today is, we hear about social with SLPs.

There's a lot more that many mining companies are doing, and we really need to be sharing our story better. From a Sibanye perspective, we have our foundation.

Uh of all the dividends we pay, 1.5% goes into our foundation. We've invested hundreds of millions within our communities, largely in infrastructure.

We have our own community trust where during times like this, our communities benefit significantly, as do other stakeholders from what we make. Of course, multiple CSI uh funds, most of which go towards developing economies beyond our mining, entrepreneurs, and supply chain development.

What does this practically mean? To give you one example, I was very fortunate, I think privileged, to spend a day two weeks ago with the families of the survivors of the tragedy of the Marikana event in August 2012.

Out of that, what a day where you sit and on the one hand, there's loss and grieving for what happened 12 years ago, but on the other hand, some of the good that has come out of that, one of which was we celebrated five new graduates that came out of our 1608 trust. Out of a trust fund where 138 beneficiaries have gone through school, many of whom have gone through tertiary education, today we have 29 graduates: doctors, lawyers, farmers, geologists, 13 of whom are employed at Sibanye.

This is what we can do when we acknowledge our past, when we work together for a new future. This is sustainability.

When we hear about EMPs, when we hear about Urmas, etcetera, that's compliance. This is sustainability.

This is the purpose of our company. Just in conclusion, ladies and gentlemen, very briefly, I think in terms of the guidance for the year, it remains largely unchanged.

We have made one update to the gold operating unit costs. I think as you heard from Richard, we have had a few real drivers on that cost, much of which has been almost investment into sustaining that business for a few years longer, but we have slightly increased that guidance.

The only other two small changes is included roughly 100 million rand for each of Burnstone and Mount Lyell for the second half of this year as we kick those projects off. In conclusion, I think just going back to my first slide, we set out a strategy the beginning of the year.

I think we were very clear in terms of how we were looking at capital. That was about both creating value for our shareholders, improving our business resilience, and investing in our future.

I dare say the environment that we've had over the last six months, and once again, I think full credit to our teams for their delivery, we've been able to really fast-track this and fundamentally strengthen the business significantly from where we were just 12 and 6 months ago. I think we've demonstrated the portfolio that we have.

Our Capital Markets Day took you through the details, and I said it then, I'll say it again. I still firmly believe we have the best PGM portfolio in the industry and one I wouldn't swap.

The flexibility, the opportunity to develop that in multiple phases gives us huge optionality to the PGM markets going forward. I dare say you've now seen us committing to investing in those as well as our Burnstone and Mount Lyell operations.

Ultimately, we've been able to create the shared value that is why we are here as a business, both in terms of our dividends today as well as investing into our communities around us going forward. Ladies and gentlemen, thank you very much.

I think with that, we'll uh happy to take any questions. Henrika, I guess from the floor first and then online, but uh over to you.

Thank you.

Oh, thanks. Thank you very much, Richard, and other presenters.

Any questions from the room? Thank you, Arnold.

Thora is on his way to you.

Arnold van Graan

Yes, good afternoon. It's Arnold van Graan from Nedbank.

Three questions, if I may. Richard, the first one is for you.

When you took over this role, um it's a few months ago or a year ago, you obviously would have had clear plans of where you wanted to be here today at, 1H. You've given a lot of detail around that progress, but I guess in your own words, where do you think you you are ahead, where are you on plan, and and where are you behind?

That's that's the first one for you. Uh one for Charles on Stillwater.

You're looking at the incentive plan going through that. Two questions: the one is, how confident are you that you would get that through?

Then secondly, and I think more importantly from my perspective, how confident are you that that would actually drive the productivity and cost numbers to to get it sustainable? Because because we see these incentives constantly changing and and that's that's the nature of mining, but yeah, how do or can you give us some conf- comfort that this is actually what you need to make that work?

Then a short one for Schalk, and very important one, when are you going to get the Section 40- 45 cash in the bank? I'm assuming that will help bring down that cash balance that you're pushing down, which uh well done, by the way.

That's it from me. Thanks.

Richard Stewart

Arnold, thanks very much. Good afternoon.

Um okay, let me take your first one. Listen, I think where we are ahead without a doubt overall has been the cash generation.

Listen, and I think, of course, we've had very supportive markets. Overall, what that's impacted positively is the balance sheet.

Um so I think we set ourselves a goal of getting that debt down by 50%, the gross debt. That remains the goal.

We thought two to three years to really get there. In the current market, that could be that could be quicker.

That would certainly be, I think, the areas where where we're most ahead. I think where we are tracking well is in terms of our our plan on optimizing margins.

This has been around business business excellence, around operational performance. I think overall across the business, we're seeing a lot of stability coming in.

We're hitting the numbers we want, and of course, once you get stability, you can really start driving those margins. I'd say that's where we where we're on track.

The areas that I think take longer than that I originally anticipated to to be honest, I think, is essentially changing the efficiency and the operating model of the business. This is something we got a big business, it's something we've got to do cautiously.

Ultimately, it's about being far more efficient, the systems that we put in place to be sustainable. We are a company that's grown from the acquisition and amalgamation of four, five, six different companies.

Getting that standardized across the business is something you need to do carefully in order to not disrupt the business. I think we are making the progress we want.

The other one we haven't touched on today, but I should mention, is simplification of the portfolio. I think the reason it's difficult to discuss that in an event like this until there's a decision made on something, we can obviously announce that and share it.

Um but we are getting quite close on a few, and I think the team has done great work in how we can simplify and realize value for for some parts of the portfolio that are that are non-core, but certainly look forward to to sharing more of that with you as and when we can, when they're hard numbers. Thank you.

Charles, you want to?

Charles Carter

Sure. Um is my mic on?

Yeah.

Richard Stewart

Um so

Charles Carter

Arnold, I think the the the key thing to understand is this is an integrated approach with mul- multiple components at work at once. I'll I'll quickly sketch them and go to your question.

Interestingly, your observation that uh incentive schemes come and go, what what we find at Stillwater is a legacy scheme that's been there for 20 years. It is it is focused on miners.

As you're probably familiar with that technology in narrow narrow seams, it's two miners to a stope. They do everything from drill, blast, muck, and haul.

Um they are heavily incentivized on volumetric uh numbers. It's not about the quality of the break, it's not about the cycle time of blasting, it's about the volume.

That's an agreement that has been layered up through negotiation over 20 years. We are busy changing that, which is complex work, not easy or quick work.

Now, I think importantly when when you look at our miners in that mode of of activity and incentive, they they are exceptional miners. They they are high-capable individuals.

They're incredibly well-trained, and they've done this their whole life. From their perspective, why change anything?

Right? That that is the fundamental issue you have to navigate in a negotiation.

They they are working to plan and slightly ahead of plan, as we've shown. That plan is producing, as you as you know well, uh without 45X credits at at in and around $1,500 a 2E oz.

Um and and that's when they're going full bore, right? That's the best we can do.

You have to fundamentally change a number of things to move that dial towards 1,000. One one is to really look at your planning and and and have a very integrated planning approach, but it goes and and you would have seen this in the Analyst Day, really the the the stope configuration.

You've got a vertical ore body, you've got different dips between Stillwater and East Boulder. Um Stillwater allows us to use slightly bigger equipment on bolting, mechanized bolting, which which is bespoke to us as well with Komatsu.

Um East Boulder has a has a a different dip, you you have to use smaller equipment, otherwise you get sizable dilution. In both in both setups now, you're going to get dilution, but you're going to get very much enhanced productivity and cycle time.

Your ounce return is significant, but what underpins that is task mining, not two miners doing everything and getting highly rewarded for that. It's an integrated approach between the planners, the the drill and blast, the mucking, the haul, um all the way through to the plant.

Right? That full-team incentivized approach is new for that operation.

It's not new anywhere else in the world. It's not even new in the US in Nevada, for example, but it's very new to that operation.

You still want to favor the miners because that's where your core skill sets are, that's where the the the history is, um but but you want a fully incentivized team. Then with that with that, you want, we're not just changing mechanized bolters, we we going from 2-yd to 4-yd uh muckers.

We we we've got a number of equipment shifts which which all enable much higher productivity. We we are confident on our plan to get towards 1,000 over a two to three-year step-change program.

It is being introduced incrementally between the two sites. There's a lot of training that goes with it.

The fundamental first cab off the ramp, now that we've done the trial mining, which we did collaboratively with with miners, um and we and we've done the work management, is both to to land the incentive scheme in the agreement. Once it's there, we we we can work with that going forward.

I I sketched that it has multiple components, not just volume and break. Um that that to be blunt, the the the miners don't like because they're doing very well with how they do things right now.

There's a there's a there's a lot of convincing to do, but ultimately, this without that anchor incentive in a done in a structurally different way, without the enabling equipment, without the changes to work management, without upskilling our supervisors, you don't get towards 1,000. You have only incremental gains on the current mine plan.

This this, for these operations, is make or break for the future. It's not a one-hit wonder, it's not a one it's not a silver bullet.

It's an integrated program that gets layered in over several years of change management, um and we we have to take our workforce with us. Right now, to be blunt, they don't like change.

A lot of work going into that. I think I I have a very high regard for the steelworkers as a as a union in the US.

I've I've spent quite a bit of time with their national leadership, giving them the why, giving them the how, appealing to them to back us to make the change. I think at a national executive level, they get it.

I think we still have work to do with our workforce. These are two different contracts still in negotiation that we we can have bumps in the road.

I don't doubt this for a minute. The direction of travel, where we have to get to and how quickly we have to get there, either makes this 40-year options on these ore bodies, or four years, because we're not going to devote sizable capital if we can't make these changes.

You've got capital down the road on on tailings expansion, rock dumps, and so on. In the US, that's expensive spend.

We got to get this right. We got to take our workforce with us.

I think there's a core that gets it. They they are totally up for this.

Any anyone of those miners who's worked in Nevada and elsewhere, this is this is well known to them. It's a it's a change from a way of doing things, and that way was not broken.

It it's a proud way of doing things in in Montana. You don't get towards 1,000 without the systemic integration of multiple pieces now shifting.

Does does this keep me awake at night right now? Absolutely.

The road map is clear. The plan is really good.

The the the leadership team is fully on it. Um now it's about change management and getting people to to go with it.

We've we've put a lot of change on the table in the in the negotiations, it's not an easy one. The legacy negotiations have always been incremental additive items to a legacy agreement, and we're changing that whole model.

Not easy, but work in progress.

Charl Keyter

Thanks, Charles. Is my mic on?

Yeah. In terms of 45X, about 10 days ago, we had our first interaction with the IRS.

It was a team of five, of which two were engineers. Um they confirmed that they are looking at the '23 tax return, which is the first year of the 45X credit.

Um that it was more a process kick-off, um but the two engineers on the call already started asking some questions around process, um our relationship with our refiner, and uh they also asked if they can do a site visit. Arnold, I don't have a timeline.

No timeline was agreed at that meeting, but I think it's safe to say that it's now in process. Uh we will we will update you as and when we get more information.

Um we've also asked the team to look at, are there other companies that have received the 45X, and they are. Um through the direct pay method, we know of a company called Corning that's already received $83 million back in the direct pay method.

I think it's really it's just a process issue now, um but unfortunately, there's no specific timeline.

Arnold van Graan

Gentlemen, thank you very much for the comprehensive answers. Appreciate it.

Charles Carter

Hi,

Brian Morgan

thanks very much. It's uh Brian Morgan, RMB Morgan Stanley.

Um just a couple of questions. Um should I just do them all in one go?

Cool. Um just um Charles, Stillwater West, um it's now out of the five-year plan.

Um is it out even if we get to $1,000 in the next two to three years? Is that um is that, is that the right way to read it?

Maybe another question is um since we last spoke at April, um how have you seen the the spent catalysts feedstocks into your recycling business? Um how's that how's that moved?

Have you seen any improvements in that regard? Um Schalk, maybe a question for you just on um just on that specifically is is the advances now 7 and 1/2 7 and 1/2 7.4 billion rand of advances um coming out of that now?

It's quite a big number. Um how should we be thinking about the accounting of that?

Um because it's it's it's a it's a lot of cash. Just um just some thoughts around that one.

Um and I had a fourth one and I've forgotten what it was. Um but I'll just leave it to that if you don't mind.

Charles Carter

Great. Thanks.

I think, Grant, you want to pick up the recycling one there if that's okay?

Richard Stewart

How's it, Brian? Good to see you.

Um from a from an autocat recycling perspective, I don't think we've seen much incremental move or the market size getting bigger. It's really just been moving the pieces of the puzzle left and right.

Um there has been some slight incremental move in the market in terms of the pricing, but nothing that's going to significantly move the needle.

Charles Carter

On uh Stillwater West, so, the the the track we pursuing is is we've got to get towards the $1,000 at Stillwater East uh before we go anywhere near Stillwater West. Um so it's going to take us two to three years to to really show that we are hitting bull's-eye on that that that objective.

Once we know we can do it, and we can do it well, then we will have a run at at at looking at Stillwater West. We'll we'll look at it in the way you look at a new project, although we've got a lot of fixed infrastructure.

We've got multiple different uh setups for mining. You you want to know that you can go back there with with a fundamentally different productivity structure and a different cost structure, and then you've got to look very carefully at how you sequence that on the on that legacy set of operations, um because it because it requires infrastructure upgrades, and it can be very expensive if you do it wrong.

I don't see it as a as as as a full mine standing up immediately. I see it as probably incremental.

I see I see the planning phase getting stood up once we know we well on track elsewhere, so that takes you year two into year three, and then and then it'll be, going back to the capital allocation discussion, it'll be stacked in a rank of multiple cabs in the company looking looking to get capital, and only the fittest will survive. It it's in the frame, but it's not near-term, and and you don't want it to go away.

You don't rush back there, because then your whole cost stru- change cost structure changes, your CapEx changes, and you back treading water. The whole objective to a 1,000 is, long-term palladium pricing is around 1,100, that might improve, but, there's no there's no radically bullish case on palladium long-term.

It might be a conservative case we dealing with, but you you've got to manage to 1,100 and show a margin on that and that's how we think about it. Um so you don't chase volume for volume's sake because you on the mechanization plan, we can unlock real cash flow.

Um we step up ounces incrementally year-by-year, but we get very good returns once we get those productivities up. That's the objective.

Yeah.

Charl Keyter

Thanks, Brian. As you say, it is a big number.

Um but I think importantly is that, and you would know, that I mean that number moves up and down as commodity prices moves up and down. I think um well, I know that the team has done some really good work around that.

There's no there's no risk in it for us um because we we either lock in the price. We we deal with reputable collectors.

Uh the team has a very good handle on that. Then I think, from a from a pricing movement perspective, um that is that risk is is ameliorated through either um locking it in through hedges or more recently we've put that metal consignment line in place.

That will continue to show up as working capital. Um there's unfortunately nothing we can do, that's the nature of that business.

Um but but I guess, with a 14% margin, um and and the and and the the manner in which we turn that working capital, it's really it remains a very, very good business for us. On

Richard Stewart

the 45X accounting? You were asking the 45X accounting?

Brian Morgan

No.

Charl Keyter

No.

Charles Carter

That was Arnold. Um, and then uh

Brian Morgan

sorry, just one more question if I may actually, Richard. Um just on on Mount Lyell to you.

Um you're talking about simplification. Everybody's clamoring for, projects at $6 copper.

Um it's not big. Um you've got a lot of other stuff to do in your portfolio.

Is this not is this a core asset really?

Richard Stewart

Yeah. Let me explain.

Brian, thanks for the question, because listen, that's a good one. Um and I think that I think the way we got to the way we look at it is, where can we create value?

That that that's the critical question. Exactly as you say, would we be copper miners competing in bulk mining in in Argentina?

No. That's not our business.

I don't think we can add any value there. An underground mining operation uh in Tasmania right now, that's exactly where where our sweet spot is.

That's what we understand. I think a couple of points points to it.

If we just look at Mount Lyell alone, the numbers you've seen, the valuations that we've done it on, the decision we've made it on is, of course, on the on the resource we know now. Um I've got to say when you when you go and look at an asset like that, um I used to have a pro- professor who said to me, "When you're looking for exploration, you look for juicy plumbing systems."

This is juicy. The opportunity to expand that resource and make that into a much bigger project is significant.

That really is very interesting country. In terms of a a project like that today, I guess the question we ask ourselves is, we did look at alternatives.

Could we have sold it? Could we have brought in a partner?

Uh could we have done some sort of fancy offtake financing? The answer to all of that is yes.

Absolutely we could in this market. When you look at the value that we could generate from that asset by building it ourselves, it's significantly higher.

If you flip that and said, if we had an opportunity to acquire an asset like that in a jurisdiction where we've got a well-established team on a mine that we understand that is our bread and butter underground mining, would we have moved on it? The answer is yeah, we probably would have.

Um and here we have it within our portfolio, ready to go. Absolutely, it is.

I do think the one thing that we will still look at carefully with Mount Lyell is, as you saw, it's got some interesting byproducts on gold and silver. Of course, copper there is some a lot of interest in terms of offtake.

Could there be ways to to help finance this in a smart method with some of those those byproducts? That's certainly something we will continue continue to explore in a bit more detail.

For now, absolutely happy with it. It's uh it could be a real value addition to to the company.

Thank you. If no further questions from the room, um we've got a question from Nkateko uh from Investec.

"Please comment on cost in SA Gold, excluding DRD. All-in sustaining cost now at about $3,500 an oz.

Is this the new cost base for these operations before Burnstone?" Um,

Richard Cox

thanks for that question. Including DRD, we're at 1.6 million rand a kilo.

Excluding DRD, we're at 1.8 million rand a kilo. DRD is doing 1 million rand a kilo.

That does trajectorally tell us, where we also want to follow in terms of the surface business. What is the surface uh what is the future cost of the SA business?

I think what's the trajectory? Then when we look at the mix, it's also quite difficult to aggregate.

Take for example our most expensive business. That's Kloof.

Kloof's 15% of gold production. Currently, Kloof's producing at 2.4.

Can we keep it at 2.4? If we think we can keep it at 2.4, there's a business for the next three years.

If Kloof's with us, it's going to to increase cost. Our best business is Driefontein, 1.6 million rand a kilo.

That's 50% of the production. Um but what we see at Driefontein, of the working cost, 25% of the working cost is electricity, and electricity did go up by 13% with the with the regulator.

Driefontein does pump a lot of water, so, it's a big question. What what's happening with the Driefontein water?

Is it is it stagnant? Is it increasing?

I think in the Vits basin, we are seeing water increase annually. I do think in in Driefontein, they manage their production, which they are, um we might see, a slight uptick in cost.

Um but that will obviously anchor the cost towards the lower level. Beatrix, 1.8 million rand a kilogram at the moment.

Um it's not mean not really a cost issue as much as a production issue. We are chopping through some difficulty extending life of mine below deepest level, but I think we'll we'll do learning then we will get better.

Managing the cost into the future, we what have we signaled? We've signaled costs for gold the back end of this year, within the range of 1.75 to 1.84.

I think that does take into account some of the significant infrastructure spends we we at the moment. Will that continue into the future?

Likely not. We are responding to some of the infrastructure vulnerabilities.

Um 10% of our business is is surface, and you know Cooke at the moment is producing at at 1.9 million rand a kilo. We see opportunity to grow that.

Um but within those numbers is quite a big maintenance spend to to prep that business for the long term. Cooke on the third party, three years ago, there wasn't a lot of near-surface, 0.5 g/t material around, and it certainly wouldn't have sustained 1.9 million rand a kilo.

At a 2.4 million rand a kilo price environment, there's a lot of this resources around, and we are investing in that business. Uh it's quite significant.

In the first half, we put 50 million into into Cooke, who's a we see an opportunity for the long run. Um So it's quite a difficult one to to to pitch, what what happens long term.

There is a lot of infrastructure spend, I think that'll go away. Um so I do think, the cost pressure that we are signaling, 1.75 to 1.84, has got a lot of investment in there.

Um a lot of our businesses are, like Kloof, for example, it's it's got a one-year life. A lot of that that capital is expensed.

That's in the number, you know. You you all of a sudden have a longer life, assets no longer impaired, that that drops out of that out of that number.

I do think it's a it's a good number for the near term, um but as as we see future potential of our Driefontein operation and the surface operations, I I do think that that cost inflation on that number certainly will will come down. Rich, I'll leave it there.

Richard Stewart

Thanks.

Thank you very much, Rich. Um then we also have profiles from our SA Capital Market Day um that um one can have a look at um looking into the future for cost.

The next one um also from Nkateko, "You are lagging your peers on dividend payout. At what point do you think you will consider adjusting dividends higher to higher to align with peers?"

Richard Stewart

Thanks, Nkateko. Listen, I think uh so firstly, just yeah, our dividend payout is obviously 25% to 35% of normalized earnings.

I think if I compare that to peers, most are between 30% and 40%. We we possibly slightly lower on that front, yeah.

Um but listen, I think we've been clear in our capital allocation model. In that model at the moment, we're looking at that roughly third, third, third model, uh and that is until such time as we can get our our gross debt down by at least 50%.

Um and until then, I don't don't materially see that that model changing. I think it is about resilience of the business.

Commodity prices have been high, but we also living in very volatile times. Uh volatility, we know often precede shock.

Listen, we are certainly getting ourselves resilient for what may come. Um but once that is done, that would be a logical point to to revisit the uh the capital allocation model, and that would be a discussion with the board.

As it stands at the moment, I think we we sticking to what we said uh in terms of consistent dividend payouts, uh in terms of reducing our debt, and investing in our our business for the future.

Thank you. Um from Yinuo um from Shanghai Metals Market also asked, "What were the average PGM prices during the period?

Um did you produce osmium? How much mechanization are you doing in Southern Africa?"

Richard Stewart

I think there's some quick answers to that one. We we don't produce any osmium, no.

We do not extract that. The average metal prices, I am sure were in the booklet, I'm not sure if anybody's got them on hand.

Uh there was around 40

Yes,

Richard Cox

that's just under 44,000 rand per 4E oz. 44,000 per 4E oz

Richard Stewart

in in South Africa. Uh and in terms of mechanization, I think, Rich, do you want to?

Richard Cox

Of the 776,000 oz we we did, conventional is about 60%, trackless about 30%, our surface contributes 5%, and purchase of concentrate about 5%. Yeah.

Richard Stewart

Thank you.

Thank you. Um Singiwe from the Dow Jones asks, "How much chrome was produced in H1, and that compared to the previous year?"

I don't know if, Rich?

Richard Cox

Thank you very much for that question. Chrome was lower.

Last year, we produced about 1,160,000 tons, and this year, 950,000 tons for the same period. Quite a significant 211 tons lower, 18% year-on-year.

A big chunk of that, 175,000 tons, was because we closed the BTT concentrator. That is because, as we planned, the resource feeding the BTT concentrator completed, and that contract completed.

Um the balance is, when when we closed the BTT concentrator, because uh the tailings facility closed, it's got a neighboring tailings facility. That neighboring tailings facility is a younger tailings facility, less chrome in the mix.

Um still profitable, and that was fed through remainder concentrators that that also lowered the the chrome output. We see going forward with the um the agreement we have with with with Glencore, the technology we're we're implementing, the workarounds on the on the Rowland chrome, uh we'll we'll get back to to better numbers um in the spec end of this this half and then into next year.

Thank you. Um Nkateko asks, "Uh please comment on the integrity of the infrastructure at Mount Lyell, and any potential risks."

Ralph Lombard

I'll I'll take it.

Um

Ralph Lombard

Nkateko, thank you. I'll start with we're extremely fortunate that we had a care and maintenance team at Mount Lyell since the mine closed in 2014.

The decline is in extremely good shape, and that also allows us to actually have a relatively quick ramp-up. Part of our feasibility study, which we started already in 2023, was actually looking at the rest of the infrastructure.

Anything which were not deemed fit will be rebuilt, and that's part of the capital expenditure you see. For example, the concentrator is totally new.

Then you also see that post-capital implementation, we also will do shaft refurbishment of the vertical shaft, and we allowed around $74 million for that. Uh I think importantly is where we want to start mining, where we want to get going, that infrastructure is actually in quite a good shape thanks to that care and maintenance team.

Thank you.

Thank you, Ralph. Um Steve Shepherd um says congratulations on the operating and financial results.

Um also um commenting that Stillwater has been problematic. Um apart from a few years, it has been either loss-making or marginal.

On this basis, is the risk, management time, and effort really worth it? Is it core to Sibanye um uh the Sibanye assets um is the question he's asking.

Thank you.

Richard Stewart

Let me take that. Steve, thank you and good afternoon.

Um yes, listen, I think it is, and that's uh I guess that's almost the point that I was trying to make by saying we're looking at this asset differently. You you're exactly right.

Listen, Stillwater historically has done exceptionally well in high-price environments. It did for us.

It paid itself back. In low in low-price environments, it struggled.

That's a little bit ironical given that it's by far the highest-grade PGM deposit in the world by five times. Um but it is due to the higher costs in mining in the US.

Um that's that's simply the maths around it. I I think the the critical aspect is if you are going to be in the PGM industry, you have to recognize that all PGMs come from three areas at the moment: South Africa, Zimbabwe, Russia, and Stillwater.

Um so having that flexibility of an operation that sits in a geographically different area, I still think is critically important and very strategic. Now, does that mean we will continue to try and make an operation work at a loss-making level forever?

No. Of course, there's a limit and there's a line that has to be drawn, and I I dare say if we listen to Charles, that's part of the line we drawing with stakeholders.

We have a plan. We know how to get there.

If that plan doesn't deliver, then at a point, we've got to call it. We do have a plan that we think will deliver at 1,000, uh and I think we have a real responsibility to to try and make it get there.

If we cannot, there will be a a point to call it. If we can get there, that is absolutely the one of the best PGM deposits in the world with still 40 to 60 years' worth 40 to 100 years' worth of mining if you look at the whole ore body.

I think we have a responsibility to try and make it work. Steve, yeah, I think it does remain core to the portfolio as long as we we're in the PGM business, which we certainly plan to be for the foreseeable future.

Thanks, Steve.

Thank you very much. Sashi Shekar of Citi ask, "Um could you please elaborate more on the increase in trade and other payables of 9.2 billion that impacted your free cash flow, and will it reverse in future?"

Charl Keyter

Yeah. I think importantly, the 9.2 billion was a release of working capital, so that was a positive impact on on the free cash flow.

Um In terms of of the overall level of of um of trade and other payables, um it's a number that goes up as commodity prices go up. If you look at at the at the same period for the previous year, um there's there's one thing to mention is that we included the North Carolina site from about September last year, um which brings across its own um trade and other payables, so that would not have been in the in the same period in 2025.

Then as I said, as prices move up, the these numbers also move up uh because of the way that we lock in the prices. Your question on whether it will reverse, if prices do come down, which is not a positive for us, um you will see a release after a period of time.

Um but if you ask me, I hope this this number grows, um which does then suggest that we get higher commodity prices. Thank you.

Perfect. Thank you.

There was a second question um on dividends, but it was similar, already answered. Thanks, Sashi.

Um if uh if we don't have any hands in the room, there's more I think there's a caller on the line. Um Operator Judith, if uh if we can queue that?

Thank you.

Operator

Thank you. The next question comes from Ephrem Ravi of Citigroup.

Please go ahead. Uh

Ephrem Ravi

thank you for taking my question. Um I think there's a bit of an echo here, but I'll push through uh nonetheless.

Uh so firstly on Century, um you're clearly kind of uh reaching the end of the life for tailings. From memory, there is a silver deposit nearby.

Given where silver prices are and your balance sheet uh now having, pretty much de-geared, um are you kind of putting that project into the pipeline? Um and would that be a consideration at all uh going forward uh and diversifying your metals suit uh in precious from gold and PGMs into silver as well?

Um the next question uh you know was on uh Calibre. Obviously, there is also a uh the the gating of the uh uh lithium hydroxide project uh, from uh spodumene to uh technical-grade to battery-grade.

Um is prices a factor at all uh that you're considering, or is it more kind of uh you know customer availability um and and long-term contracts uh that are driving that decision? Thank you.

Richard Stewart

Let me give that a try. Just want to make sure I got you correctly on the first question, Ephrem.

Was that with regards to the phosphate project or

Ephrem Ravi

Yeah,

Richard Stewart

perfect. Um, Ephrem, no.

Listen, I think uh I think we've been quite clear that phosphate at the moment would not be part of our strategy. That doesn't fit in with what uh with what we're looking at.

Um, so as you quite rightly mentioned, at the moment, Century's got about 12 to 18 months' worth of of mining left. Um, and there again, we are in quite quite advanced discussions with our partner in that regard as to how that infrastructure could best be used um towards developing that phosphate project, uh but it's not a it's not a project that we would be looking to to put any capital into, uh and from our side, that is how best we could we could realize any value from the existing infrastructure we've got.

That is one of those examples I referred to uh regarding progress on simplifying our portfolio. No, that would not be one that we would uh be looking into going forward.

Um, I think with regards to the Keliber question, uh let me give that a first crack, but please Ralph or Charles, feel free to add. I think at the moment or or the decision regarding turning on the refinery uh really hinges around three big things.

Today, we we commissioning the concentrator. Uh as Charles mentioned, we've we've commissioned the the throughput portion of that.

We now looking at how we can optimize the grade. Uh once we have that uh up and running and grade being at the right levels, then we can contemplate that's one of the first uh parts to turning on the refinery.

The second part to turning it on will be what commodity markets are doing, what lithium markets are doing. The reason why that is important to us uh is if you do get a collapse in lithium prices and essentially if China wanted to manipulate prices by bringing a lot of supply online, you can put a mine and a concentrator on care and maintenance quite safely and at a relative relatively acceptable cost.

You do do not want to put a refinery onto care and maintenance. Those are big chemistry sets.

Once we turn that on, that's one you want to run consistently for an extended period of time. We will assess the market uh and assess the concentrate.

If we do not turn on the refinery, then we have the option of of selling the spodumene spodumene concentrate. I hope that that addressed the question.

Thanks, Ephrem.

Think that's uh that concludes it if you want to.

Richard Stewart

Wonderful. Listen, thank you very much everybody again for joining us today.

I think a pleasure to have you all here today. Uh we look forward to to seeing you soon.

Please please enjoy the rest of the afternoon. Thank you very much.