Hello everyone. Thank you for joining us, and welcome to AECOM's third quarter 2026 earnings conference call.
After today's prepared remarks, we will host a question and answer session. If you would like to ask a question, please press star one to raise your hand.
To withdraw your question, press star one again. I will now hand the conference over to Will Gabrielski, Senior Vice President of Finance and Investor Relations.
You may begin.
Will Gabrielski
Thank you, operator. I would like to direct your attention to the safe harbor statement on page one of today's presentation.
Today's discussion contains forward-looking statements about future business and financial expectations. Actual results may differ significantly from those projected in today's forward-looking statements due to various risks and uncertainties, including the risks described in our periodic reports filed with the SEC.
Except as required by law, we undertake no obligation to update our forward-looking statements. We use certain non-GAAP financial measures in our presentation.
The appropriate GAAP reconciliations are incorporated into our materials, which are posted to our website. Growth rates are presented on a year-over-year basis, unless otherwise noted.
Any references to segment margins or segment adjusted operating margins will reflect the performance for the Americas and International segments. When discussing revenue and revenue growth, we will refer to net service revenue, or NSR, which is defined as revenue excluding pass-through revenue.
NSR growth rates are presented on a constant currency basis, unless otherwise noted. Today's remarks will focus on continuing operations.
On today's call, Troy Rudd, our Chief Executive Officer, will review key developments and accomplishments this quarter, as well as our outlook for the business. Lara Poloni, our President, will discuss key trends across our markets.
Gaurav Kapoor, our Chief Financial and Operations Officer, will review our financial performance and outlook in greater detail. We will conclude with a question and answer session.
With that, I will turn the call over to Troy. Troy?
Troy Rudd
Thank you, Will, and thank you all for joining us today. We had many accomplishments in the quarter, and I am proud of our teams and the positive impact we are having on our clients' critical infrastructure investments.
Before getting into the details of our results, I'd like to address the $337 million pretax charge included in the quarter. The charge is primarily the result of a delay in delivering a large construction management project due to several factors, the largest of which is overall productivity of subcontractors on the last phase of this project.
We had expected this project to be substantially completed in the first quarter of fiscal 2027 and now expect this near the end of the second quarter of fiscal 2027. In addition to the financial impacts in this period, we are pursuing sizable claims for this project, and our confidence in recovery has been validated by our success in the dispute resolution process to date.
We expect resolution of the remaining claims will take some time, and this will continue to burden our cash flow through the first half of 2027. We are disappointed with this outcome, but I want to add some context.
This project was bid in 2019. Since that time, we have changed leadership and tightened our risk controls.
We decided many years ago to no longer pursue design-build work for P3 clients in the construction management business due to the inherent challenges this structure can present. As a result, this project would not clear our risk hurdles today.
I also want to provide an update on the second design-build P3 project in construction management, which was bid around the same time. We are progressing towards the planned substantial completion date of phase one in the first quarter of fiscal 2027, and this remains consistent with our previous forecast.
The second CM project also has a significant claim position to [unclear] recoveries due to delays not caused by us. Finally, notwithstanding these two projects, the construction management business has produced strong cash flow and high returns on capital consistently over time.
Based on the composition of our backlog and pipeline today, I expect this trend will continue. Now turning to the details of our results.
Our teams are winning work at a record rate. Our backlog increased 13% to a new all-time high on record quarterly wins and a 1.6 book-to-burn across the business, including 1.8 times in the Americas.
Year-to-date, our book-to-burn is 1.4 times, providing extraordinary long-term visibility. Adjusted for one less working day in the quarter, NSR in the design business increased by 5%.
This was led by 6% growth in the Americas design business, as well as a return to growth in the international business, which increased 4%, led by the UK and Australia. Even so, overall NSR growth for the quarter was below our expectations.
The primary drivers are slower than anticipated new project starts in the construction management business and the continued impact from the conflict in the Middle East, which we see continuing through the fourth quarter. While both businesses have fallen short of our expectations in the second half of fiscal 2026, they have strong backlogs and are well-positioned for return to growth in 2027.
Excluding the financial impacts of the construction management project charge, adjusted EBITDA and EPS improved year-over-year by 5% and 11%, benefiting from the return to NSR growth, which resulted in margin expansion in the international segment. We also delivered positive free cash flow of $55 million despite the headwind from the construction management projects mentioned earlier, demonstrating the strength of our historically consistent free cash flow conversion.
Turning to financial guidance. Our updated financial guidance captures three main changes from last quarter: the impacts of the construction management project charge, lower than expected NSR growth, and continued margin outperformance.
As a result, we now expect full year NSR of approximately $7.3 billion and adjusted EBITDA and EPS of $950 million and $4.05 respectively at the midpoint of the ranges. Adjusted for the charge, and to help with comparability, we now expect full year NSR of $7.65 to $7.7 billion and adjusted EBITDA and EPS consistent with our prior guidance at $1.29 million and $6.00 at the midpoints.
This includes a raised expectation for adjusted EBITDA margin to 17.4% versus the 17% previously. We also expect to deliver free cash flow of $300 million for the full 2026 fiscal year.
With that, I will turn our call over to Lara.
Lara Poloni
Thanks, Troy. The strength of our technical expertise and the success we are having in the market are a testament to our teams and the investments we are making to extend our advantages.
There are many marquee wins this quarter, but there are two in particular I want to highlight. Included within our record backlog, we won two of our largest recompetes ever.
Both are in the environment business, one public and one private. Despite the industry's vast amount of consolidation, our leadership position persists.
More importantly, our scope across these projects has expanded significantly. As I look across our markets, there are several additional positive developments that give us optimism.
Starting with the US, our state and local clients continue to prioritize infrastructure and water investment. In recent months, several of our largest state clients have announced major multi-year infrastructure plans focused on highways, bridges, transit, and rail, all areas where we have the number one ranked practice.
Additionally, growth opportunities are robust in our US water business, where our pipeline expanded by 30%. On the US federal front, rapidly growing investment in national defense remains a key theme, and our pipeline with the Department of War, our largest single client, increased by approximately 30% in the quarter.
Congress continues to advance fiscal 2027 defense budget legislation, and we expect healthy growth in the key areas we support. This includes significantly increased facilities work, where we are a leading provider to the Army and Navy.
Additionally, Congress is progressing the next 5-year surface transportation authorization. The House's initial $580 billion proposal includes key funding for all key areas to which we are exposed and gives us further conviction in the continued bipartisan commitment to infrastructure investment.
It is worth noting that unlike past reauthorization cycles, today's funding environment is incredibly healthy. Less than half of the IIJA funding in our core markets has been spent, which adds to our visibility and confidence.
US private sector investment is also accelerating. This is particularly true in data centers, which remains one of our fastest growing businesses and where we have been expanding our hyperscaler relationships.
In Canada, activity has been very strong and broad-based across all market sectors, driving continued double-digit NSR growth. Notably, after the quarter, we won a 10-year program management role for a highway and bus transit project that represents one of our largest wins in Canada to date.
Additionally, and underscoring the trend of increased global defense spending, Canadian defense spending reached its highest level in recent years, and the government has committed to more than doubling that share to 5% of GDP by 2035. In step with this, our pipeline is up significantly, tied to the government's efforts to upgrade military bases across its Arctic and northern regions.
Turning to the international segment. In the UK, NSR growth accelerated to high single digits with ongoing strength in water, environment, and energy.
Work on the Great Grid Upgrade project is progressing well and was a key contributor to growth this quarter. As a reminder, this is one of the most significant electricity infrastructure programs in UK history.
AMP8 is also accelerating with additional workloads and more opportunities from large frameworks coming through. Even so, while transportation continues to lag, growth is benefiting from our diverse positioning.
In Australia, growth accelerated in the quarter, up double digits, and our backlog reached a new multi-year high, up more than 40% year-over-year. Along with continued defense infrastructure wins during the quarter, transportation activity is accelerating, which bodes well for 2027 and beyond.
In the Middle East, the ongoing military conflict continues to create near-term uncertainty, specifically in the end markets exposed to tourism and hospitality. Nonetheless, wins remain strong, driven by the infrastructure demand, allowing us to deliver a double-digit growth in backlog during the quarter.
Further, after the quarter, we were awarded a large rail project in Saudi Arabia, which better positions us in an expanding rail market there. There is likely to be a significant amount of work needed to repair, fortify, and expand US military infrastructure in the region, which presents another long-term growth opportunity for us.
Asia remains soft, but backlog grew double digits year-over-year, driven by a large Northern Metropolis highway win, which is the first major transportation project tied to this initiative and a top priority development for the Hong Kong government. This positions us well, including on further opportunities as this mega project continues to advance.
To conclude, I am extremely proud of the dedication of our professionals and their unmatched technical expertise that drive our business performance. With that, I'll turn the call over to Gaur.
Gaurav Kapoor
Thanks, Lara. I want to start by highlighting several strengths that underpin our convictions in our strategy, the investments we are making to scale our strength, and the long-term value of the business.
First, winning. Our 1.6x book-to-burn and 13% backlog growth are tremendous accomplishments for a business that expanded.
We've spoken for several quarters about the value we are delivering to clients through our differentiated offering. Advisory, program management, and early AI wins are transforming client interactions and with it, our ability to bring unrivaled solutions.
Not only are we winning more with existing clients, opportunities are now emerging in new markets where our scale and technology are opening new avenues for growth. Second, margins.
The return to growth in international, delivering on our continuing improvement promise, and early benefits from AI across our cost base are apparent. While performance was masked this quarter by the construction management project, underlying profitability demonstrates the opportunity ahead as we advance towards our 20% margin exit target for FY '28.
Finally, our balance sheet and cash flow. We built a resilient balance sheet with no maturities for several years and cost certainty on majority of our debt.
We ended the third quarter with $2 billion of undrawn borrowing capacity. We've delivered positive free cash flow in the fiscal year-to-date period despite cash burn on the two construction management projects referenced earlier.
We expect continued cash burn on these projects through the first half of fiscal 2027. Turning to our segments.
In the Americas, NSR declined 29%, primarily reflecting the construction management charge. The design business increased 6% when adjusted for one less working day in the period.
Beyond the project-related revenue impacts in construction management, NSR lagged our expectations as new construction management wins ramped up slower than we expected. Nonetheless, backlog in the design and construction management businesses continue to be strong and growing high single digits, while the design pipeline has also grown over 20% for three straight quarters.
The Americas adjusted operating margin was -16.1%. Excluding the construction management impact, the margin was 18%, which reflects a few key items.
The first factor was slower than anticipated start-up of several construction management wins, which affected utilization of resources. Second, we had record business development activities in the period that impacted Americas margin by approximately 140 basis points.
Large pursuits in particular consume a lot of time and resources, but provide a high ROI as evidenced by the segment 1.8x book-to-burn we delivered in the quarter. It should be noted that in quarterly periods in prior years, we have experienced similar impact to segment margins due to elevated business development spend.
Consistent with those years, we will continue to deliver on the quarterly and annual enterprise margin targets. Accordingly, we expect Americas margins to normalize in the next quarter.
Turning to International. NSR increased 4%.
Australia and the UK in particular are driving better growth. Our backlog continues to be strong, up 28% versus prior year.
The international adjusted operating margin was 14.3%, reflecting much better growth in Australia, which is a higher-margin market, better margins in the UK from higher utilization, and the initial benefits we are realizing from our proprietary AI strategy while continuing to invest consistent with our earlier guidance. Turning to financial impacts of construction management projects.
NSR and EBITDA were impacted by $337 million. EPS was impacted by $1.99.
Cash flow included a $185 million use. Because of this expected use and higher average debt balances, we expect our interest expense to be higher in 2027.
We are currently estimating $30 to $35 million of year-on-year impact. With respect to capital allocation, our returns-based discipline remains intact.
There are no impacts to any ongoing or planned organic growth investments. With that, let's turn to Q&A.
Operator?
Operator
Thank you. We will now begin the question and answer session.
If you would like to ask a question, please press star one to raise your hand. To withdraw your question, press star one again.
We ask that you pick up your handset when asking a question to allow for optimum sound quality. If you are muted locally, please remember to unmute your device.
Please stand by while we compile the Q&A roster. Your first question comes from the line of Sabahat Khan with RBC Capital Markets.
Your line is open, please go ahead.
Sabahat Khan
Great, thanks, and good morning. Appreciate the color sort of you shared on the charges.
I think sort of between Troy and Gaur, I think you guys outlined the projects are on the way to getting completed. Maybe if you can just detail out looks like about $100 million draw down in the previous free cash guide for this year, and you mentioned more cash to sort of finish these.
Maybe if you can just detail out sort of the timeline from here to complete these projects and any metrics that you can maybe share around the cost to sort of complete these sort of through late this year and into next year? Thanks very much.
Troy Rudd
Sure. I can do that.
Thank you, Sabahat. Just in terms of the timeline on the two projects you're referring to, just to be clear, where our construction management business there are two P3 design-builds.
They are the only ones that exist in that business. The first project, which we did take the charge on during the quarter, we now expect to be complete in the second quarter of fiscal '27.
The second project, which we also went through the same forecasting process, and there is no change to its delivery date, that will be in the first quarter of fiscal '27. In terms of cash, the impact in the fourth quarter resulted in our overall free cash flow moving from $400 million for the full year down to $300 million for the full year.
As we go into '27, we actually see this having a significant cash impact for the first two quarters of fiscal '27, and the overall impact will be about a half a billion dollars.
Sabahat Khan
Great. Then maybe just on the sort of the base business guide, maybe if you can just detail out, I think you mentioned some delays sort of in getting some projects going.
Maybe if you can detail out the base business sort of guidance revision and what's impacted there and just sort of between this and the first item, just any early thoughts you can share on how maybe fiscal '27 is shaping up maybe on the base business with and without these projects? Thanks.
Troy Rudd
Yeah. Sure, let me sort of cover this at a high level, and then for some of the detail, I'll pass it over to Gaur.
With respect to sort of the base business, which is our design business and, of course, our construction management business, we've actually had a very good year in terms of winning work and building visibility into the future. As we've said in our results that our book-to-burn for the quarter was 1.6 times, and that was across the entire business, and year-to-date, that's 1.4 times.
That does give us good visibility. Within that backlog, we've focused on very large awards and programs.
They actually extend and provide us good visibility for multi-years. As we look forward, maybe the best way to describe it is we have confidence because of that visibility in our long-term growth algorithm, which we said is organic growth for the business between 5% and 8%.
Maybe that's the best way to sort of think about the entire business moving forward. Now I'll pass it over to Gaur to give you some of the detail.
Gaurav Kapoor
Morning, Sabahat. In terms of the base business, echo Troy's point, the base business continues to be very healthy, excluding the project charges we reported.
That is evidenced by, if you exclude the project charge, there's no change in our earnings metrics, EPS and EBITDA for the year. We continue to expect to deliver what we had raised our guidance to previous quarter.
When we look at from a NSR standpoint looking forward, there is an impact on NSR that is coming from our CM business and our international business compared to plan. Specifically, what we mean by that is we had expected our CM business to contract because there were large projects, as we've talked about in previous quarters in prior year, that were coming down.
Our backlog was building up, but there is a cadence when large projects drop off and new projects come on line, there's a little time lag coming through. For one of those projects, specifically a convention center in Texas, that has been delayed for a few months.
That impacted us in the current quarter for the CM business and will impact us in next quarter as well. As importantly, as you can imagine, a lot of our resources in that business are right now focused on delivering these two projects.
That's taking them away from the normal backlog that exists, which is quite healthy, including 1.9 book-to-burn in the current quarter. Moving to the design business, Americas design continues to be strong.
Year-to-date, almost 7% organic growth adjusted for work days. We expect that to continue into Q4 at that healthy run rate.
When you step back and look at the backlog that we have and the visibility, it continues to provide that tailwind, including a very strong and healthy pipeline in our Americas business that will continue to capture and monetize. On the international side, in the Middle East, where it has gotten better compared to the second quarter, one of the things that has become very clear to us is hospitality, tourism, any developer-related end markets, those are very tough right now for obvious reasons.
At the same time, the wins we've had over the last 9 months in Middle East are very focused on transportation, infrastructure, and rail, so that portends really well for us in FY '27 going forward. Some of the other guidance impacts that we've already shared in our released comments include interest expense will be impacted due to the cash burn on the terminal projects, as Troy highlighted, and share count will also be impacted because our focus is going to be on delivering these projects as we move forward.
We're still in the early phases of the overall planning for FY '27, and I think that's about the right color we have as of this point in time.
Sabahat Khan
Great, great. If I could just squeeze in a quick one, I guess just sort of on the earlier question around the projects and the cadence to wrap these up, assuming you've done some level of sensitivity analysis on getting these done, just maybe if you can share the level of confidence in getting these projects that have caused the charges wrapped up in the next fiscal year and sort of your sensitivity analysis around sort of the timeline?
Thanks, and I'll pass the line.
Troy Rudd
Sure, Sabahat. Let me start with the first project and where we took a charge.
Again, that project is in the phase where I'm going to call it the physical completion of the building is on track to our original deadline. Really what's impacting this is it's basically systems testing, integration, and commissioning work is what's drawing that out.
As we look at completing that project, at this point in time, we have reforecasted, and based on the last 6 weeks of work, we do have that project being a little bit ahead of the schedule that we had anticipated, think about that as 20% of the completion. We forecasted it out based on the existing production rates that we have been experiencing in a few months prior to that, so that does give us confidence.
Of course, in that schedule, we've also built some slack into that. In terms of our scenario planning, we're comfortable that we've included the reasonable scenarios in that timeline to complete in the second quarter.
On the other project, again, we have reforecasted that, and it has held. The difference in that project is it is further along, effectively 2 months from completion, and so we're almost at the physical completion of the work, and the systems testing has been going underway, and so we forecasted out based on our historical subcontractor productivity rates.
Again, on both of those, at this point in time, we have a degree of confidence in delivering within those time frames.
Sabahat Khan
Thanks very much.
Troy Rudd
Thanks, Sabahat.
Operator
Your next question comes from the line of Andy Kaplowitz with Citi. Your line is open, please go ahead.
Andy Kaplowitz
Good morning, everyone.
Troy Rudd
Morning, Andy. Good
Gaurav Kapoor
morning. Troy
Andy Kaplowitz
or Gaur, margin was down year-over-year in the Americas in Q3 ex the CM charge, which you said was a result of the higher BD costs and timing of CM. Yet, you raised your overall margin forecast for '26.
Obviously, it looks like you raised your forecast because of the strong international margin, but how should we think about Americas margin moving forward? I think you mentioned Americas margin will normalize in Q4, Gaur.
Does that mean up year-over-year? Do we still expect to see a bigger increase in margin FY '27?
Gaurav Kapoor
Hey, Andy, this is Gaur. I'll take that question.
You're right. The margin costs in the current quarter were impacted by business development efforts.
Every few years we seem to have this quarter where large pursuits seem to converge. If you would recall, we kind of experienced the similar type trend in FY '22, as well in FY '24 as well.
Similar to those trends, our full expectation is we'll have the normal cadence of margin consistent with what we have delivered, including the great tailwind we're seeing on all the efforts. Absolutely Americas margin, you should expect it to normalize and be consistent or a little bit better than last year.
The international margins have been a very good story in the current quarter, and I expect those to continue in Q4 as well. That international margins is a large step-up due to a few key factors.
One is the international business has now pivoted to growth. That's consistent with the backlog that we had been winning in that business over the last four quarters.
Our biggest growth market was Australia. Australia also is our biggest margin business.
Our second biggest margin business in international segment is UK. Combined with those efforts and you put forth the technology efficiency tools that we've been rolling out across the globe that are a great multiplier, while at the same time investing consistent with our plan, it's driven really healthy margins.
That also gives us a lot of confidence that the margins will continue to grow consistent with the expectations we had laid out, where we will be exiting FY '28 at 20
Andy Kaplowitz
plus percent, 20% plus. Helpful, Gaur.
Then Troy, maybe you can give us more color into how or what changes you've made or will make to construction management to make sure that what you're facing now doesn't happen again? Then you talked about the double-digit backlog growth in CM and the record pipeline, but you also mentioned the delays you're seeing.
Do you think CM can grow in line with your algorithm, that 5% to 8% next year in '27, or could it be a drag?
Troy Rudd
Yeah. Let me take those in reverse order.
With respect to CM, when I refer to the 5% to 8% growth algorithm, I'm referring to the entire business, which includes construction management. If we were to look at that separately, I would say that the growth in construction management will come in the second half of next year, not in the first half of next year.
Again, that gets to as you build backlog in that business, it does take a while for that business or that backlog to ramp up. It usually takes 12 to 18 months.
The things we're seeing that impact the business this year in terms of awards and wins, we will start to see that next year. Then the other thing will happen is, as we complete these projects in the second quarter, that we will have people that will be also available to be redeployed onto these other projects as they ramp up.
Gaurav Kapoor
Andy, the other part of your question related to the CM changes. The first project where we've taken the charge, this was bid in December of 2018.
The second project Troy highlighted earlier, which is on schedule as we had previously communicated, that was bid in March 2020. Since that time, over the last 5.5 to 6 years, call it, we have not only revised our risk matrices, changed leadership in that business, simply put, these type of projects would never even qualify to be approved in our current structure, commercial structure, what we're willing to do for our clients.
Outside of these projects, we don't have any design-build P3 in our portfolio, in our CM business. It just doesn't exist.
There's something we just have to deliver in a current projected timeline.
Andy Kaplowitz
Helpful, guys. Thank you.
Troy Rudd
Thanks, Andy.
Operator
Your next question comes from the line of Andy Wittmann with Baird. Your line is open, please go ahead.
Andy Wittmann
Oh, great. Thanks, guys.
I wanted to just get, I guess, an accounting on kind of where the claims stand here. I think in the 10-Q last quarter, we don't have it for this quarter yet, but was $650.
Where does it stand at the end of the quarter? Then, Gaur, is it kind of the way of thinking about it by the time you're done here with, I guess, you talked about fourth quarter cash burn and $500 million cash.
Should we be thinking of the total claim is whatever it is here at the quarter plus $500 and change to get the total size of the claim? Is that the right way of thinking about it?
If you could just talk about kind of how you're going to approach that and try to recover as much of that as you can? I know you said it's going to take a while.
It's obviously a complicated project, but any detail I think that would be helpful.
Gaurav Kapoor
No, absolutely, Andy. In terms of claims, if you baseline to prior quarter, you shouldn't expect a material change in the current quarter.
It'll be within that $600 million range. Also, by the time these projects are both completed in the timeline Troy articulated earlier, there's not going to be a material change.
It'll be somewhere in that $600 to $650 million just based on percentage of completion because these complete at very high percentages. In terms of the second part of your question as to how we will go about it, as you can imagine, we're going to keep that quite confidential because we want to be very tactical.
There have been significant scope changes that we've had to fund the working capital for. That working capital is far in excess of the claims on our books.
We believe we've been very prudent in reviewing all different aspects of the claims from operational, financial, legal rights and responsibilities, obligations to put a number that we feel pretty confident in recovering. What we have for these two projects is a fraction of the total amounts that we're claiming against third parties.
Andy Wittmann
Okay. The the next thing I wanted to ask about was your planned kind of restructuring here for fiscal '26.
I think earlier in the year, and I guess your guidance reiterated today, that you're expecting, $2 150 to $200 million of restructuring costs. You've only had $54 booked year for through the first three quarters.
I was just wondering if you if if that if that guidance range still holds, or or what how how the rest of the year unfolds on that. Is this one of the reasons why the the fourth quarter margin is getting some focus here today by being up a lot sequentially and maybe year-over-year?
Gaurav Kapoor
Sure. Andy, in terms of our overall guidance, there is no change, as you've noted.
There's no change in our strategy as well. If you recall, what's really underlying driving it is how we approach our clients, how we operate internally to create value for our clients.
The demand adoption for that change has been very high, and we're very thoughtful about how we go about change management impacts internally and making sure our clients are seeing the value proposition. Some of this we're seeing in our backlog growth.
Not only in the current quarter, but like we said, you go year-to-date, you go trailing 12 months, our backlog growth has been very strong, which provides us a lot of good, strong visibility into the long term for our growth algorithm to be supported. We're going to continue to be very very thoughtful on how we roll out and deliver that value for our clients, how we revise our processes, and so nothing has changed from that standpoint.
In terms of the margin impact, the margin impact is going to be very consistent with some of the previous restructuring programs we've taken. We review it and underwrite everything, implement everything depending on the ROI.
It has to clear our ROI hurdles, and it has to be sustainable. The margin impacts that you will see coming through for the restructuring are not really reflected in Q4 because that's when most of the restructuring will take place.
It'll really be going forward as we have pivoted as an organization to how we approach differentiated offerings in the marketplace to our clients.
Andy Wittmann
Okay. All right, thank you very much.
Gaurav Kapoor
Thanks, Andy.
Operator
Your next question comes from the line of Steven Fisher with UBS. Your line is open, please go ahead.
Steven Fisher
Thanks, good morning. Wondering if you could give us a sense of the timing of when those extra business development costs could translate into bookings and revenues.
What's the competitive environment looking like for these large pursuits at the moment?
Troy Rudd
I'll let Lara take that question.
Lara Poloni
The competitive environment remains consistent, but we've got a lot of confidence, particularly based on the tremendous amount of work that we've been winning and the growing pipeline of opportunities ahead of us. Those win rates, particularly for our most substantial projects in excess of $50 million, we're maintaining a healthy win rate there with those.
This quarter in particular, what was most pleasing were the record wins over $4 billion included a couple of marquee wins in the environment business that we mentioned in our earlier remarks. In particular, the federal program, which was a recompete, which gives us a lot of visibility and confidence over multiple years, and also a significant private client environment win as well.
Just to give a bit more color on that, Steve, they were bid and won against the usual competitor set. The other thing that stood out was we weren't in a joint venture for any of those.
We won those in our own right, and the competitive landscape included several multi-header sort of combinations from some of our peers. I'll hand over to Gaur to sort of provide some additional color on that.
Gaurav Kapoor
Steve, thank you for that question and noticing the great book-to-burn. Similar to your question, I guess the answer is ROI is immediate, as you saw in the quarter.
We invested the margins, the incremental BD time, and we continue to do it every chance we get because the BD on it is immediate. 1.8% for our Americas design business, 1.9 for our CM business, and 1.4 in the quarter for our international business.
In terms of contracting and revenue flow-through, the good news is these are with high quality clients of ours that we have a longstanding history, and the revenue stream has been very consistent, solid, irregardless of what the political gyrations may be, it gives us a lot of confidence in that long-term algorithm, even more visibility with these longstanding wins that we have. On top of that, another data point we've shared with the analyst and investor community on our ROI or cadence is looking at our ECP, which our win rates continue to be at 80% plus, including the results from a book-to-burn and backlog growth we've posted in the current quarter.
Steven Fisher
That's helpful. Then, would love to get a sense of the outlook for the international growth from here or maybe how to model it.
Should we be assuming some acceleration from here, or is the mid single digits kind of a steady pace? If you could, as long as we're talking about modeling things, just fourth quarter on the Americas design, I thought I heard you say, Gaur, that you thought we could continue something like a 7% adjusted for days.
Is that what you have embedded in the model for the fourth quarter there? Thank you.
Lara Poloni
Steve, I'll start, and then I'll hand to Gaur just in terms of the overall color in terms of the outlook. Starting with International, the design business, as we noted earlier, has got a healthy book-to-burn of 1.8 times.
The outlook is broad in terms of the healthy pipeline and the win rate across all of the key dimensions of the business. We mentioned environment.
There's a very strong federal outlook tied to the defense sector. Our data center work and outlook continues to be very strong and fast-growing.
Then when we look to the other parts of the business, as Troy noted, the international outlook is strong. We've seen that rebound, the ANZ business returning to double-digit revenue growth, the backlogs up more than 40% year-on-year, UK and Europe.
Obviously, we have long-term visibility and work continuing on projects like Great Grid Upgrade. We're seeing now some real momentum in our wins and outlook associated with the AMP8 program.
We've got some good wins and visibility in the advisory business, which is growing in line with expectations. Even in the Middle East, as we said, there's a strong infrastructure outlook, and we are winning at that more than 80% capture rate on the most significant elements of that pipeline.
Gaur will touch on some of the more detail.
Gaurav Kapoor
I'll take the Q4 first. You're right, Steve.
You heard me on design for Americas. We do expect 7% adjusted for workdays, 7% plus in Q4.
Specific to looking at FY '27, it's, as Troy has already discussed, we think our long-term growth algorithm will continue to hold for the overall business. As to the different pieces of it, international versus other segments, right now we're in the throes of our planning process, we'll provide more details next time around.
Steven Fisher
Thank you very much.
Troy Rudd
Thanks, Steve.
Operator
Your next question comes from the line of Sangita Jain with KeyBanc. Your line is open, please go ahead.
Sangita Jain
Great, thank you for taking my question. If I can go back to the NSR growth algorithm.
I appreciate the discussion on fiscal '27, but I kind of just want to understand the long-term growth algorithm since I think during the Analyst Day, the targets excluded construction management from this equation. Just want to know on an apples-to-apples basis, if we do keep CM in the model the whole time, how should we think about that revenue algorithm?
Troy Rudd
Sangita, I would think about it as applying to the entire business. I think, again, not revisiting what we said in our Investor Day last year.
Where we sit today, the entire business, including construction management, we capture that in our growth algorithm in our long-term guidance of 5% to 8%.
Sangita Jain
Got it. Thank you.
Then on free cash flow and uses of free cash flow, once the cash outflow on the legacy PM projects conclude, with leverage having picked up a little bit, I just want to understand how you're thinking about the use of free cash flow between, let's say, deleveraging and buybacks?
Troy Rudd
I would think about it this way is, first of all, as we said, we're always going to be focused on what's the highest returning opportunity, and for us, that is organic growth. We will continue to invest at the same pace in organic growth.
We obviously are going to continue to return capital to shareholders certainly through the dividend. As we move forward and we get past the second quarter of next year, I think that you'll see our leverage ratio on a net and gross basis return to a very low number, and we would then I think be back to returning capital to shareholders certainly at our stock price where it is today.
Sangita Jain
Appreciate that. Thank you.
Troy Rudd
Thank you.
Operator
Your next question comes from the line of Jamie Cook with Truist Securities. Your line is open, please go ahead.
Jamie Cook
Hi, good morning. I guess two questions.
One, I appreciate the color that you guys have given on 2027, early on. Just on the organic growth of 5% to 8%, I know you said CM will grow at that rate in the second half of 2027.
I'm just wondering as we think about 2027, do these problem projects, the ramp of the CM business, does that weigh on the first half 2027 organic growth, maybe we return to normalized organic growth of 5% to 8% in the second half of the year versus the first half? Then I guess, Troy, separate question for you.
Understanding the problems are related to two projects, but CM was up for strategic review just 6 months ago. Just have you scrubbed the other CM projects that you have within your backlog?
Why is this a good business to be in? Thank you.
Troy Rudd
Sure. If you think about '27, it's a little premature for us to sort of give guidance for the year, but I think that your comment is fair, is that if we see CM contributing to growth in the second half of the year, that you would see a ramp-up in growth during the course of the year.
I will say that again, remembering that that business in terms of representation of NSR represents about 6% or 7% of the NSR of the business in a given year. Again, I think that it's premature for us to give guidance, but I would suggest that's the way to sort of think about it for models.
In terms of the construction management business, the answer is yes, we obviously have scrubbed the backlog in the pipeline to make sure that we make the statement that these are the two projects that have this profile, the design-build for P3. The rest of that backlog in that business is of a very different risk profile.
Think about it is predominantly a for fee or as we see guaranteed max price backlog. As we move forward, again, we made changes many years ago to the projects we take on in that business, and so I think that is already culturally ingrained in the business in terms of what we accept.
We feel rather good about that business going forward. If you take out those two projects and you look at the margins and the return that we see in that construction management work in the past, it is very high returning ROI, and it has margins that are consistent with the margins of our entire Americas business.
We do view that construction management business as having healthy backlog and a healthy pipeline and a very high returning return on investment profile absent these two projects as we put them behind us.
Jamie Cook
Thank you.
Troy Rudd
Thank you, Jamie.
Operator
Your next question comes from the line of Adam Bubes with Goldman Sachs. Your line is open, please go ahead.
Adam Bubes
Hi, good morning. Just as we think about the $500 million of costs in 2027 related to the two projects that you outlined, how much of those costs do you have visibility on being reimbursed for?
I guess specifically, what I'm asking is are you pursuing revenue on the costs or the actual costs as well? Just maybe help us a little bit with the accounting on those projects from here.
I think costs flow through with zero margin, should we expect a margin headwind next year from construction management? What's sort of the net revenue associated with those projects?
Gaurav Kapoor
Hey Adam, this is Gaur. I'll take that question.
In terms of the margin impact, you're right, especially the one that we've taken the project head-on, it comes with no margin at all. The second project, it has very little margin related to it, not by any measure, I would even forget material, I wouldn't even call it significant.
When you look at at our go-forward NSR related to these two projects, the cash is not consistent with the NSR to be booked. There's very little NSR remaining on these projects.
Just to put it into context, in our construction management business, when you look at the total project value, our share, our NSR is generally less than 5%, and we're on both of the projects more than 80% to 85% complete as we sit right now, there's very little NSR that's related to them. What's really impacting it is the for- the focus we have on completing these projects and putting it behind us is taking up a lot of our resources and tying them up that normally would be used on other projects and backlog that exist.
Troy Rudd
Adam, maybe I'll just sort of think about this as for the accounting as a result of recording the impairment in the quarter. That is the impact that we expect on the financial statements through the delivery of those projects.
Think about that differently with cash flow because as a result of impairing that project, we still have to fund the delivery of those projects through the next three quarters. Then the $500 million relates to the first two quarters of fiscal '27.
The financial statements reflect the impact of those projects to their completion, and then the cash flow is just what we're going to need to spend to fund those through completion.
Adam Bubes
Great. Appreciate all the color there.
Then you've talked about some of the risk evaluation changes and leadership changes in construction management, the absence of design-build projects, P3 projects, beyond these two. Can you just help us understand exactly how your bidding procedures and risk controls work at another layer of detail in construction management?
I'm just trying to understand what level of risk you still underwrite in the portfolio today.
Gaurav Kapoor
Sure.
Troy Rudd
Gaur, I'll take that.
Gaurav Kapoor
Predominantly in that portfolio, we take on what's called GMP, guaranteed max price, commercial terms. The big difference on this is when we go enter into a contract, for the first 12 to 18 months, we work on a T&M agency basis with the client, with the developer to ensure their designs are essentially complete, 70% to 95% complete.
All the sub cost have been forecasted out, scheduled out, subbed out in support with the client. Once all that risk has flowed out of the design, the build-out, construction documents are complete, at that point, we enter into the GMP commercial terms.
The biggest difference is not only we have the client and us, we have flowed the risk down to the subcontractors and other parties that perform the construction work. Our risk is generally limited to our fee on those jobs.
Troy Rudd
I'll just add two points to that. One is, if you sort of think about the work that we take on in that business is a similar risk profile to the rest of our design business, the way it sits today.
In terms of the decision-making, we changed that years ago so that, effectively, material projects in that business, they come through a process of review, a very detailed review to make decisions on whether to bid them or not. As part of that process, we have a prohibition on taking on any design-build for P3, and that was put in place many years ago.
Adam Bubes
Great, thanks so much.
Troy Rudd
Thank you.
Operator
A reminder, if you would like to ask a question, please press star one to raise your hand. To withdraw your question, press star one again.
Your next question comes from the line of Michael Dudas with Vertical Research. Your line is open, please go ahead.
Michael Dudas
Good morning, gentlemen. Lara.
Lara Poloni
Good
Troy Rudd
morning, Mike. Good
Gaurav Kapoor
morning, Mike.
Michael Dudas
Troy, maybe you can characterize, the new business growth over the first three quarters of, I guess, 29%, 30%. Can you characterize on existing versus new clients, scope expansion versus new projects, what areas benefited you, where you saw the most activity on?
Gaur mentioned in his prepared remarks about new avenues, new markets. Are there some areas that some of the investment organically is going to be placed to drive added growth in either existing or different areas of your practice?
Thanks.
Troy Rudd
Sure. In terms of the work that we've won across the business in the first three quarters of the year, and of course in the third quarter, it has been distributed across the entire business.
We have been successful in all of our major markets. I will highlight that in the Americas, we were particularly successful.
The other thing that I think we've been acknowledging is that we have been pursuing, and for years been pursuing, very large programs and projects because frankly that's a place where we think we're very well-suited to differentiate ourselves because of the depth and breadth of the experience that we have and the global teams that we bring to those projects. Our win rates are very high on those programs.
Again, Gaur referred to that, that our win rate has been on those programs for a while over 80%. That also brings very good visibility to long-term growth to the business.
In terms of Gaur's comments on, kind of new markets and new activity, what we are finding is a number of the investments that we have been making in change the way that we deliver outcomes for our customers, it is actually opening up new markets for us, which we had not previously had a strong or dominant position. Those investments are giving us the opportunity to have very different conversations with new customers and groups of customers that we haven't had in the past, which is also very encouraging as we look forward.
Michael Dudas
What type of new customers, or what type of areas?
Troy Rudd
We're looking at, really I'll call it in the buildings and places market within our business and within program management. It's enabling us to move into more commercial markets, more hospital healthcare markets, and into data centers in a more robust way.
Michael Dudas
Excellent. Thanks, Troy.
Troy Rudd
Okay. Thanks, Mike.
Operator
There are no further questions at this time. I will now turn the call back to Troy Rudd for closing remarks.
Troy Rudd
Again, thank you, everybody, for joining us today. Again, I want to thank our employees and our folks here at AECOM for their diligence in delivering projects and infrastructure for the customers.
Thank you.
Operator
This concludes today's call. Thank you for attending.