Express Powerr Solutions (M) Berhad

Express Powerr Solutions (M) Berhad

MMYX:XPB
0.18
MYR
+0.01
(+5.88%)
No data availableFinancial data will appear here once available

Capital Structure

FRC

•

in mil. unless spec.
No data availableFinancial data will appear here once available

Working Capital

FRC

•

in mil. unless spec.
No data availableFinancial data will appear here once available

Growth Rates

FRC

•

in mil. unless spec.
No data availableFinancial data will appear here once available

Quarterly Revenue

FRC

•

in mil. unless spec.
No data availableFinancial data will appear here once available

Quarterly Earnings Per Share

FRC

•

in mil. unless spec.
No data availableFinancial data will appear here once available

Quarterly Dividends Per Share

FRC

•

in mil. unless spec.
No data availableFinancial data will appear here once available

Company Description

CEO
Lim Cheng Ten
Full Time Employees
144
Sector
Miscellaneous
Industry
Miscellaneous
Address
Klang Malaysia
IPO Date
Sep 24, 2025
Business
Express Powerr Solutions (M) Berhad is a Malaysia-based power solutions provider primarily engaged in the provision of generator rental services and integrated electrical engineering solutions. Founded in 2005 and headquartered in Klang, Selangor, Malaysia, the company provides temporary, standby, and continuous power generation equipment alongside renewable energy systems to diverse industrial, commercial, and utility sectors across Malaysia. The company operates through two core business divisions: Generator Rental & Ancillary Power Solutions, and Solar Photovoltaic Solutions. Its comprehensive product and service portfolio includes temporary and emergency diesel generator rental services, featuring soundproof containerized generators, mobile truck-mounted generator units, and high-capacity units ranging up to and exceeding 500 kVA for unexpected power outages, planned facility shutdowns, testing and commissioning, and large-scale public events; ancillary electrical equipment rental and supply, including medium- to high-voltage step-up and step-down transformers ranging from 11 kV to 33 kV, switchgears, generator synchronisation and automatic transfer switch (ATS) panels, low-voltage main distribution boards, resistive and reactive load banks for load testing, and heavy-duty power cabling; end-to-end technical support and operational services, comprising electrical system engineering, logistical transport, on-site setup, cabling layout, load balancing, on-site technical manpower, 24/7 emergency response, fuel management, and routine equipment maintenance; and turnkey solar photovoltaic (PV) engineering, procurement, construction, and commissioning (EPCC) solutions, encompassing rooftop and ground-mounted solar system design, regulatory liaison and grid interconnection approvals, inverter and panel installation, and long-term asset performance monitoring for commercial, industrial, and residential applications. The company caters to mechanical and electrical contractors, manufacturing plants, infrastructure and construction developers, event management firms, and major power utility providers including Tenaga Nasional Berhad and Sabah Electricity Sdn Bhd. In recent corporate developments, Express Powerr Solutions (M) Berhad completed its initial public offering (IPO) and officially listed on the ACE Market of Bursa Malaysia in September 2025 under the stock code XPB (0370). The company has utilized its IPO proceeds to finance the strategic expansion of its power generation fleet, acquire larger-capacity generator units and advanced medium-to-high-voltage transformers, enhance depot facilities, and accelerate the commercial rollout of its turnkey solar PV solutions across Peninsular and East Malaysia.