Operator
Ladies and gentlemen, good day, and welcome to Aditya Birla Real Estate Q4 FY26 earnings conference call hosted by HDFC Securities. As a reminder, all participant lines will be in the listen-only mode, and there will be an opportunity for you to ask questions after the presentation concludes.
Should you need assistance during the conference call, please signal an operator by pressing star, then zero on your touchtone phone. Please note that this conference is being recorded.
I now hand the conference over to Mr. Jay Shah from HDFC Securities.
Thank you, and over to you, Mr. Shah.
Jay Shah
Hi. Good morning, everyone.
On behalf of HDFC Securities, I would like to welcome you all to the 4Q FY26 and full year FY26 earnings conference call of Aditya Birla Real Estate. Joining us today from the management are Mr.
R. K.
Dalmia, MD Aditya Birla Real Estate, Mr. K.
T. Jithendran, MD and CEO Birla Estates, and Mr.
Keyur Shah, CFO Birla Estates. We will begin the call with opening remarks from the management, following which we will open the floor for question-and-answers session.
I would like you to hand over the call to the management for opening remarks. Thank you, and over to you, sir.
R.K. Dalmia
Thank you, Jayesh. I am R.
K. Dalmia.
Good morning, everyone, and thank you for joining us for our Q4 FY26 earnings call. India's economy remained resilient in the quarter ended March 2026, Q4 FY26.
In FY26, GDP growth estimated at 7.6% and FY27 projections of 6.9%. It reinforces its position among the fastest-growing major economies globally, supported by strong domestic demand, a stable policy environment, and continued investment activity, despite of some global factors, including geopolitical tensions in West Asia and potential army and energy price pressures.
Inflation has remained under control at around 3.2 to 3.4% in early 2026, and projections of 4.6% for FY27. The real estate sector continues to benefit from this largely supportive conditions, strengthening sector's long-term growth trajectory.
In terms of industry performance, the residential demand remained stable in Q4 FY26. However, premium and luxury segments continued to outperform, while affordable and mid-income demand softened.
Tier 2 city supply showed a moderate dip, with a growth absorption for over the FY26. MMR remained resilient, with a modest growth in both absorption and supply over the year.
Market dynamics in Bengaluru remained strong and favorable as it witnessed growth in both absorption and supply while delivering a healthy increase in price growth YoY. NCR has witnessed decrease in supply YoY, but growth in absorption coupled with increase in price growth.
Pune has seen relatively sharper moderation in activity in terms of both supply and absorption. Further, pricing has shown a healthy growth across all the four regions: YoY growth MMR 7.4%, Bengaluru 13.9%, NCR 8.5%, and Pune 6%.
Overall, regional trends continue to reflect premiumization and more selective buying behavior. Industry players are responding to this evolving demand environment through calibrated launches, disciplined pricing strategy, and flexible payment plans to support absorption.
On commercial front, the market continues to witness strong leasing activity, supported by GCC and demand for Grade A assets, resulting in tightening vacancy levels and a continued rental upcycle across key markets. Overall, the Indian real sector is stable, with increasing emphasis on execution, brand strengthened, and product differentiation.
Now into our performance for the quarter, I am pleased to share that we have delivered exceptional close to FY26. Q4 FY26 has been one of our strongest quarters to date.
We achieved pre-sales of ₹4,288 crores, reflecting a robust 69% QoQ increase. Collections for Q4 FY26 remained healthy at ₹994 crores, and we recorded area sales of 3 million square feet, making an impressive 75% QoQ growth.
This momentum was fueled by the outstanding response to our new launches across regions. Birla Arnaa Phase 2 in NCR continued its strong trajectory, with 97% of launch inventory sold in the launch quarter itself, contributing ₹1,600 crore.
In MMR, Birla Taranya witnessed increasing demand, delivering ₹952 crores in sales. Our Bengaluru launch, Birla Trimaya Phase 4, continued to build on the success of earlier phases, generating ₹649 crores.
In Pune, Birla Punyam Phase 2 added ₹250 crore to the quarter, reinforcing our presence in Pune micro-market. For the full year FY26, we closed with a pre-sales of ₹8,136 crores, collections of ₹3,341 crores, and area sold to 5.5 million square feet, reflecting the depth, resilience, and scalability of our business.
On the redevelopment front, we announced our maiden redevelopment project in Khar with a GDV potential of ₹1,700 crores. Discussions with several more societies are progressing well, and we remain optimistic about concluding additional partnerships in the months ahead.
This segment will further contribute to our growth going forward. Operationally, our construction programs remained firmly on track across projects.
Safety and sustainability continue to be at the heart of our execution approach. Our rigorous safety practices were recognized by the British Safety Council, which conferred upon us the prestigious Sword of Honour along with a five golden star rating.
Our commitment to fostering an inclusive, diverse, and equitable workplace is stronger than ever. We are proud to share that Birla Estates was recognized as one of the Best Organizations for Women 2026 at the 6th edition of ET Now.
Our ESG leadership was further acknowledged by British World, which ranked ABREL among India's top 60 most sustainable companies and number two in the Real Estate and REITs category. As we look ahead, our commitment remain unwavering.
We continue to prioritize design excellence, customer-centricity, and the highest standards of safety and quality. We are building not just homes, but superior experience, creating long-term sustainable value for our shareholders.
Thank you so much.
Operator
Thank you, sir. Sir, should we open the floor for the Q&A?
R.K. Dalmia
Yes, please go ahead.
Operator
Thank you very much, sir. Ladies and gentlemen, we will now begin with a question-and-answer session.
Anyone who wishes to ask questions may please press star and one on their touchtone phone. If you wish to withdraw yourself from the question queue, you may press star and two.
Participants are requested to use only handsets while asking a question. Ladies and gentlemen, we will wait for a moment while the question queue assembles.
The first question is from the line of Karan Khanna from Ambit Capital. Please go ahead.
Karan Khanna
Hi. Good morning, and thanks for the
Operator
Mr. Karan?
Sir, the participant has left the queue. I'll request the participant to kindly rejoin the queue.
In the meanwhile, we'll take the next question. Karan Khanna is in the queue, sir.
I'll just promote him. Thank you.
Karan Khanna, please proceed.
Karan Khanna
Hi. Am I audible?
Operator
Yes, you are audible now.
Karan Khanna
Hi. Good morning, and thanks for the opportunity.
Just a couple of questions from my side. Firstly, KT, sustenance sales seem quite healthy for the fourth quarter, almost at 20%.
For the 7,300 crores of inventory that you have remaining, what kind of sustenance sales do you foresee going into FY27?
K.T. Jithendran
Hi, Karan. Can you hear me?
Karan Khanna
Yes, KT, we can hear you now.
K.T. Jithendran
We had a very good traction in our Bangalore project, which is largely sustenance-led, and also Niyaara. Otherwise, the bulk of it was from new launches.
We're not giving a clear guidance for the next year. All I want to tell you that for the current year, we have got about 9,000-plus crores of new launches and 7,000 crores of sustenance sales coming up.
We're refraining from giving any guidance because it's very difficult to actually predict what kind of sales we can estimate. That's why I'm not giving an explicit guidance.
Yeah.
Karan Khanna
No, that's fine. Just following up on the Mumbai market, if you could just talk a bit about the overall market given that you've seen 1% growth in absorption and 2% growth in supply.
Yet your existing inventory in Mumbai is at about 4,000 crores, and the pipeline inventory for FY27 is also very much concentrated in Mumbai, especially Worli. How are you looking at the luxury market in MMR overall?
How do you plan to manage launch timelines to allow for ample response to the launches? Also on the launch pipeline, if you can talk a bit about at what stages of approval are all these projects currently at?
I'm just trying to understand the downside risk in terms of launch delays that one can build in these projects.
K.T. Jithendran
I think we have had a fairly good year last year with respect to Mumbai. Yes, the launches came at the very fag end of Q4.
Thane Birla Taranya did extremely well. We did about 9,000 ₹960 crores or so of bookings in the few days that was left for us in Q4, and the momentum continues.
Niyaara also, with whatever left-out inventory was there, I think we have had a healthy, strike rate of at least two to three flats per month last year last year. With the new launch, I think it will really pick up.
That's a different product, and we expect a very strong response from the market. Already we have a, reasonably strong queue lined up for this project.
We have also signed a new project in Khar, which we are really working overtime to make it launch-ready. I'm quite hopeful that we'll be able to make it, and it's a very exciting market, very strong demand, coming up with a unique product, pretty excited about that.
Our launch in Boisar also again, it was at very far end, but we did clock about 80-90 crores there. We're expecting to sell it out completely this year.
I think from the micromarkets where we are in, especially, the Thane, Navi Mumbai junction market, Worli with with especially with our brand and the Niyaara, which has been created very strongly, and the new micromarket in western suburbs, we are pretty excited and I expect a very strong response for us in this coming this year. As far as the launch for Birla Niyaara Tower C is concerned, it's really touch and go.
We are pursuing very hard to get the approvals. It could be touch and go.
We're expecting first half of H1, but it's quite possible that by the time we take the launch, it may spill over to Q3 also. Fingers crossed about that.
Overall, I think we have, enough time for us to, do very strong numbers in Bombay this year.
Karan Khanna
Sure. Just lastly on Bangalore, given that this has been the strongest market for you and also the strongest response and yet you don't have any major launches slated for FY27, how should we think about the BD that you're targeting in this market going into FY27?
K.T. Jithendran
Yes, good question. I think we have had a wonderful response in all of our five projects.
We have handed over one, and we are in the process of handing over another one this year. We'll be left with Trimaya, Ojasvi, and Tisya.
We are expecting very strong sustenance sales from both Trimaya and Tisya. We are also very aggressively looking at BDs.
We have quite a good sort of medium-sized proposals which we are working very hard. Our total focus this year will be concentrated on building our BD portfolio.
We are quite optimistic about that.
Karan Khanna
Great. Thank you, and all the best, KT.
Operator
Thank you. Thank you, sir.
We'll take the next question from the line of Jay Shah from HDFC Securities. Please go ahead.
Mr. Shah, I have unmuted your line.
Please proceed.
Jay Shah
Hi. Can you hear me now?
Operator
Yes.
K.T. Jithendran
Jayesh.
Jay Shah
Yes. Hi, sir.
Can you quantify the launch timing in terms of H1 and H2 FY27, which approvals remain key dependencies? Also we are seeing that in Worli there is quite a good supply now, do you see any slow down in luxury absorption or pricing resistance given the increase in South Mumbai supply amongst the peers?
K.T. Jithendran
Okay. Thank you, Jayesh, for your question.
First, in terms of timeline, as I mentioned about Tower C Birla Niyaara, the brand has come very strongly in that micromarket and we are still commanding a good premium and demand. We expect Tower C to really accelerate that demand considering the initial response that sort of we are building up.
Of course, we haven't launched it, but discussions with channel partners, etc. The only challenge is that we're working very hard to get the approval, it may be we may just get RERA at the end of Q2 and we may launch it either in Q2 or maybe early Q3.
We want to make sure that they're completely ready all terms when we launch it. That is Q2/Q3.
Birla Taranya new phase, that will happen in Q3, which is the Thane second phase once we sort of exhaust our current phase substantially. Then we have got a new project which signed redevelopment project in Khar, which we are working overtime to make it launch-ready in this year itself, definitely that will be Q4.
Then Birla Navya, the last phase in our Golf Course Extension location, that we're planning it in about Q3. Birla Punyam in Pune, the new phase launch we're expecting, that should be in again Q3.
Then Birla Evam in Manjri, it's in Q4 Pune again. This is largely the timelines.
Jay Shah
Thank you, sir. Also, one more question on BD.
Can you share the current active BD discussions by geographies, which is MMR, NCR, Bangalore, and Pune, and the preferred asset-light versus outright acquisition?
K.T. Jithendran
Yeah. I can't share this with you in great detail, but I can generally give you the trend that we are looking aggressively at Noida, sort of an outright; Gurgaon, JDA; Mumbai, JDA and outright both, but lots on redevelopment, at least four or five projects; Pune, outright; and Bangalore, JDA and outright.
Jay Shah
Can you quantify the amount of GDV?
K.T. Jithendran
Roughly about 60,000 crores of projects we are at this point of kind of pursuing. We are trying our best to maximize what we can do.
Jay Shah
What would be the mix for MMR in terms of in this 60,000?
K.T. Jithendran
MMR will be about 35.
Jay Shah
Okay. Sure.
Lastly, just wanted to know what are we seeing in terms of target steady-state operating cash flows conversion from pre-sales over the next couple of years?
K.T. Jithendran
Sorry. What are you exactly asking in terms of your customer collections?
Are we talking about that?
Jay Shah
Correct, correct. Pre-sales
K.T. Jithendran
conversion.
Jay Shah
Yeah.
K.T. Jithendran
Customer collections, Jayesh, most of it is linked to construction progress barring a few of them. Mostly, we attempt to collect at least 65 to 70% by the time we finish the structure of the building.
There is a little bit of flexibility here and there, but largely that's how we're looking at. Far, we have been doing very strong in customer collections.
We grew by more than 23% from last to last year's collection to last year. We are looking at a very healthy growth this year also from that number.
Jay Shah
Okay. Thank you so much, sir.
K.T. Jithendran
Thank you, Jayesh.
Operator
Thank you. The next question is from the line of Pritesh Sheth from Axis Capital.
Please go ahead.
Pritesh Sheth
Yeah. Thanks for the opportunity.
Just first one again, to be very specific on Bangalore launches which Karan earlier asked for, I don't see last phase of Trimaya coming this year. Any specific reason why?
Because we don't have anyways too much of inventory there, almost 15 150-odd crores Yeah. only.
Yeah.
K.T. Jithendran
Hi, Pritesh. I think we are now focusing on execution.
We have a lot of sold inventory. We are building it, and I think we can get a healthy margin.
I think we would wait and really maximize in the last phase. Prices have really gone up there, and every launch has been at a higher price.
I think we really would like to now maximize the revenue from our final phase. As you mentioned, it's not much, but it's worth waiting for also.
This is a project which has taken about 5-6 years because it has been a 52-acre project. It helps us to really plan the launch of the last one in a big way in terms if there are any kind of cost escalations or anything.
We want to just keep that inventory as a hedge because there is enough of positive cash flow is there. We're really focusing on now really maximizing on the last phase.
That's why there's no hurry to launch that now.
Pritesh Sheth
Sure,
K.T. Jithendran
very
Pritesh Sheth
clear. In terms of let's say any business development we sign off from here on, right?
We saw Khar getting added to the FY27 launch pipeline, and we signed that project just in March or April. Any of the potential business development opportunities you think can be launched this year by Q3, Q4?
Or for this year, we are this 10,000 crore roughly 10,000 crore kind of launch guidance should be the number to look at?
K.T. Jithendran
Pritesh, I would really refrain from giving any kind of guidance. Better than that's how indeterminate it is, whatever guidance we may give.
I'm only happy to say that we did give finally in the Q3 last year guidance that we'll exceed, and we did manage to exceed that. We're pretty happy about it, but that also happened without the launch of Tower C.
We couldn't launch it, any guidance that I give could be misplaced because of the very sheer uncertainty of when this launches can take place largely dependent on the approvals schedule. Approvals are largely based on two things: one is the environmental and the NGT.
Those are pretty indeterminate things, though we do our best in estimating them. I don't really want to give any sort of clear estimates.
Having said that, our whole attempt would be to launch as quickly as possible all our projects because that's where we try to put all our efforts in, since we pay full price for the land. I would love to be in a situation where I can grab a project which has all the approvals and launch it immediately, but it's quite unlikely because it's very difficult to get that sort of project and also to our standards.
That seems a little too far-fetched, but I won't lose hope on that.
Pritesh Sheth
Sure, got it. Just couple of more
Operator
Mr. Sheth, I'm sorry to interrupt you, sir.
I would request you to kindly rejoin the queue for follow-ups. There are others who are waiting.
Thank you so much, sir. Ladies and gentlemen, in order to ensure that the management will be able to address questions from all the participants in the conference, kindly limit your questions to only two per participant.
Should you have a follow-up question, please rejoin the queue. We'll take the next question from the line of Akshay Thakur from Helios Capital.
Please go ahead.
Akshay Thakur
Hello. Hi, sir.
Thanks for the opportunity. Sir, my question is pertaining to your land in Talegaon and Kalyan.
We have a huge chunk of land in Talegaon. From what I got a sense from a previous meet that you plan to do a senior living project there, and that area is also getting more projects in similar manner.
Can you give any guidance on the GDV potential, or what is the plan in terms of numbers for Talegaon and for Kalyan as well?
K.T. Jithendran
Hi, Akshay. As regards these two parcels of land, this belongs to our historical land parcel that Century had in its kitty.
Also, we must remember that Talegaon land is an agricultural land. It needs to be converted, etc.
It's in a very preliminary stage. It's not part of the Pune development scheme as of yet.
The entire process of conversion, etc. is expected.
It has not happened because the region has not come still under PMRDA, etc. It's about 45 acres of land.
We have plans, we have aspirations for that, but nothing is really clearly laid out as of now. Why we thought senior living is because of, of course, the climate, its proximity to the Aditya Birla Hospital.
Also, the government is coming up with some friendly schemes for senior living even if it is not a converted zone. We are exploring from those point of view, but too early to give any kind of clear details and numbers on this.
Similarly, in Kalyan, we don't have as of now any land which is ready for development for the next few years. Whatever we had, it's all exhausted now.
The large plant Century Rayon and all is too far-fetched and it will take a lot of time because it's a fully a production going on with more than 7,000 workers, etc. That's not in the offing right now.
That's the update on Talegaon and Kalyan.
Akshay Thakur
Thank you for that. One more question on Thane front.
You had previously guided that there would be some sort of commercial projects also coming up. Would you share an update on that?
K.T. Jithendran
We have this Birla Taranya, which is a land bought from Hindalco and we have a 50% investment from IFC. We launched a very successful residential first phase launch.
We also have an aspiration to build a commercial portfolio there for about 5 lakh. We are in the process of designing that.
It would be either a fully leased out or maybe partly, maybe one tower we may look at strata sales first for faster cash flow and more demand and more frontal sales. We are in the process of finalizing that.
Once we get a clear picture on that ourselves as a team, then we'll be happy to disclose that. Definitely there are plans to create at least about 5 lakh square feet of commercial.
Akshay Thakur
In Thane?
K.T. Jithendran
Yes, in Birla Taranya. Oh.
Yeah.
Akshay Thakur
Okay. Thank you so much, sir.
These are
K.T. Jithendran
Thank you.
Operator
Thank you. The next question is from the line of Varun Julasaria from 360 ONE Capital.
Please go ahead.
Varun Julasaria
Hi, sir. Sir, first of all, could you just update us on the cash from the ITC deal, when is it expected, what is the current status on that?
Keyur Shah
Sure. The discussions with ITC are progressing well.
As you are aware, we received a key regulatory approval, which is the Competition Commission of India. That application was made by ITC, and government granted that approval.
Now certain state-level approvals are pending, and we expect to conclude the transaction in this quarter. It's progressing well, and our estimation and expectation is that it should get completed in this quarter.
Varun Julasaria
Okay. Sir, on the construction spend, sir, how is it looking like for the FY27 and and how much capex do we plan to spend on the BDs this year, sir?
Keyur Shah
From a capex point of view, construction spend this year in '27 should be close to 1,000 crores. I'm sorry, there is a
Varun Julasaria
Oh
Keyur Shah
yeah, yeah. That's what.
Yeah. Yeah.
Construction spend this year, pure construction spend, would be around 1,000 crores. As regards capex for land acquisition, we have a very strong cash flow and cash balance.
Our operating cash flow is positive. We have almost 1,000 crores of mutual fund balances at a consol level, and we also have almost 1,300 crores of cash and RERA balances.
From a capex point of view, we have the adequate cash to make acquisitions. Further, we also have demonstrated partnerships with leading global players.
In case of any large acquisition, we have the ability to bring on partners as and when required for making capex or land acquisitions.
Varun Julasaria
For the construction spend, you mentioned 1,000 crore, right? Because this year we have done 31
Keyur Shah
See, 31 includes all expenses. I'm mentioning to you the pure construction spend, because the project development outflow which we have shown, 3,131, includes operations expenses.
That's around 920 crores for the current year. I stand corrected.
For the FY27, it should be 1,200 crores. This also includes other items like approval costs, design costs, any deposit paid for the deals which we announced recently.
It's a combination of all of that. So 3,131 which is there in the cash flow, that also includes Ind AS or accounting adjustment whereby for revenue share.
That's what we have put in the cash flow. In that sense, last year we spent 924 crores on construction.
This year we should be spending 1,200 and odd crores for construction.
Varun Julasaria
Okay. Sir, on the BD front, since this year we've not done many significant BDs, is it the IRR or the expectation that is not allowing us to approve the BD, or is it the land title or there is some other issue which is being held up?
K.T. Jithendran
Hi, Varun. No, no, it's a combination.
The IRRs, of course, we look for healthy IRRs because this is a multi-year project. Multi situations come up, cost escalations and all have to be provided for all of that in our business plans.
We also look for a reasonable strong hurdle rate in terms of IRRs. For outright, we look at around at least 16%, and if it is a JDA, upwards of 18-19%.
That's not really the hurdle, because there are enough and more proposals coming. The only thing is that due diligence, we are very particular about what kind of risks we take.
Some of them happen, some of them doesn't happen. I think it always pays to be careful and prudent because, as I mentioned, the business goes through cycles, the business goes through different economic cycles also and real estate sentiment cycles.
We don't want to be caught hanging in any part, oh, this week risk we didn't consider and, therefore, it will come and kind of bite us back and put us back by a few years. It has happened.
It happens in real estate all the time. We have to be careful to the extent possible while doing BD.
That's not really See, BD is not something which we can keep on saying, okay, every quarter we can do so much. Because it's an exploratory thing with so many risks up there, it's quite, as I mentioned, if the right combination of risk and return comes at any particular point, it's possible that we may do multiple projects in a single quarter, or we may not do anything for a few quarters.
I think that we have also demonstrated that this happened in the last two years for us. We are pretty confident given our pipeline and the kind of projects you're pursuing that we will be very soon announcing of them.
The timing we can't, of course, predict very accurately. It's all estimated.
It's very probable that now that we are swung from the other side of the pendulum, suddenly we may announce quite a few deals together. It's not lack of resources or lack of taking calculated risks.
It is just the timing. All of these things should come together.
We're not really worried about that.
Varun Julasaria
Okay. Sir, just last question.
For
Operator
Mr. Varun, I'm sorry to interrupt you, sir.
I would request you to kindly rejoin for follow-up. Thank you so much.
We'll take the next question from the line of Biplab Debbarma from Antique Stock Broking. Please go ahead.
Biplab Debbarma
Good morning, everyone. Morning,
K.T. Jithendran
Biplab.
Biplab Debbarma
Good morning. Sir, I don't see Trimaya, I don't see you have explained.
I also don't see Ananya or Mathura Road. Ananya, I think there is a one tower left, and you have sold everything, excellent response, and congratulations on that.
Just wondering what happened to Ananya and what is the status of Mathura? Yeah.
K.T. Jithendran
Hi, Biplab. Ananya, I think, of all the towers, seven towers, we've sold now six towers with almost 100% performance.
I would really like to do something extraordinary on the last tower, and I would like to wait and time it better in a much more market, because in that market, and I've explained it to you in the past also, there's absolutely no supply and this project has come out so well. Come out designed well, really do something extraordinary on this.
I think we can improve our pricing considerably from what we have done today because the very unique positioning that project has attained in that micromarket on the back of the Aditya Birla brand name. I just want to kind of maximize the returns for that.
Biplab Debbarma
Mathura Road?
K.T. Jithendran
Mathura Road, as we mentioned in Delhi, we have been struggling with with the approvals thing. I think now we have found a way we are making progress there in getting approvals.
I don't want to take a chance and declare that will happen this year, but I'm quite confident that will happen early next year.
Biplab Debbarma
Okay. My second question is on your beginning of last year, you gave some guidance of doing 15,000 crore of around that number in FY28.
For that, we need to have enough GDV in our portfolio. Do you think this I know you'll be doing a lot of business development this year and you are optimistic.
Do you stick to that number? Would you be able to do enough BD to reach that number?
K.T. Jithendran
Biplab, I think, yeah, you are very absolutely correct in saying that it's not just doing BD, but also the timing of BD is very critical in in finding out which year, how much sales and booking will be done. Looking at this kind of trajectory that you're having today, it quite possible that 15,000 instead of FY28 may kind of sleep over to FY29.
There is a definite possibility of that, though we'll be trying our level best to do this. I think it's quite likely that it move up from FY28 to '29 as it's precisely for the reasons that you mentioned.
Our attempt will be to continuously stack up our BD pipeline and and to deliver on those.
Biplab Debbarma
Thank you, sir. Thank you.
All the best.
K.T. Jithendran
Yeah.
Operator
Thank you. The next question is from the line of Pritesh Sheth from Axis Capital.
Please go ahead.
Pritesh Sheth
Yeah. Thank you for Yeah, hi.
Hi. Couple of follow-ups.
First, if you can highlight the status of the commercial projects that we are planning in Worli, Century Phase 2 and redevelopment of Century Bhavan?
K.T. Jithendran
Pritesh, our attempts are on to start these projects as quickly as possible. We are in the design stage, planning the layout, etc.
It has to integrate with the rest of the planning location. We have already started doing that.
We'll try our level best to actually start the construction from this year onwards. That's our attempt.
Here again, one Sorry?
Pritesh Sheth
For both of them, or just one one each?
K.T. Jithendran
I would start with one of them at least, whichever goes off this thing, and we'll have to kind of plan our investments and who our partner is, etc. Whether you should take both of them together, or we should plan one after the other, how should we stagger it, that is still under consideration.
It also depends on how we get a partner for our projects. Whether we get a partner or not, we'll definitely start the commence the construction this year.
Pritesh Sheth
Got it. Second question on the cash flows, we clubbed the land spends, construction, overheads in one line called project development cost.
Maybe, Keyur, if you can help me with the split of this 3,100 crores that we have spent on project development cost, how much of it was for the land acquisition, how much was for pure construction, and how much for overheads? That would be helpful.
Keyur Shah
Maybe we can take that because there's a lot of items, maybe we can take that offline, Pritesh? Okay.
Pritesh Sheth
Okay. No worries.
Thank you. That's it from my side.
All the best.
Operator
Thank you, sir. The next question is from the line of Fenil Brahmbhatt from Choice Institutional Equities.
Please go ahead.
Fenil Brahmbhatt
Hey, good morning, everyone. I have a few questions.
Operator
I'm sorry to interrupt you, sir. Sir, your voice is feeble.
We can't hear you clearly.
Fenil Brahmbhatt
Hello. Am I Am I audible now?
Operator
Sir, please you use your handset.
Fenil Brahmbhatt
I'm using my handset only.
Operator
Increase the volume at your end.
Fenil Brahmbhatt
Hello. Am I audible now?
Operator
Yes, sir. Please proceed.
Yes.
Fenil Brahmbhatt
Yeah. My good morning, everyone.
My first question is on this other expenditure which you have reported for Q4 FY26, that is around 152 crore. I just want to know what is the components of those other expenditure, and this is like one-off or we can expect this in coming period?
K.T. Jithendran
We have exceptional item in in Q Q4 and overall the full financial year. There is a share of loss which we have from the joint venture because of sales marketing expenses, etc., not to be inventorized.
The other exceptional item is due to the labor code and also a provisioning we've made for one of the joint ventures in the textile business which we've had. That is the exceptional item.
Both combined put together is around 30 39 39 crores, 37 crores. Okay.
Fenil Brahmbhatt
Okay. Out of this 152 crore, you are saying 39 is the one-off related to labor code and the other this paper and pulp business?
Okay.
Keyur Shah
The amounts are They're in millions.
Fenil Brahmbhatt
152. Okay.
Okay.
Keyur Shah
Yes.
Fenil Brahmbhatt
Also checking on this Khar development project. Have you signed DA for this project, or it's just under under process?
K.T. Jithendran
No, Mr. Brahmbhatt, we have signed the DA.
Fenil Brahmbhatt
We have started the process of
K.T. Jithendran
yeah, we started the demolition process and all that.
Fenil Brahmbhatt
The last question related to collections. Our collections dips in this quarter YoY, QoQ.
Any specific reasons like because of delay in construction, or getting approvals, or we haven't have any delivery during this quarter? Can you can you highlight any specific reason behind this?
Keyur Shah
No, our collections have been very strong for the financial year. In fact, we did almost 1,000 crores of collections in the Q4.
They are slightly lower than last year because we had major launches in March. Our collections for the bookings which we have announced in March would come in Q1 of the coming year.
As you are aware, we almost have a 97-98% collection efficiency. Whatever bookings we have done, those collections would come in the Q1 of this year.
The April collections also have been very strong. To that extent, that is the reason why there's the way the collections pan out.
Fenil Brahmbhatt
Got it. Thanks.
Thank you. Thank you so much.
Operator
Thank you. The next question is from the line of Muralikrishnan from Sundaram Mutual Fund.
Please go ahead.
Muralikrishnan Raghunathan
Thanks for taking question. Sir, just wanted to understand so you are indicating that we are hoarding few towers Ananya and and other towers.
Whenever we launch a project, those are almost like getting sold out. What is our strategy, sales strategy while for a for a large projects?
We are seeing that we are launching in phases also. Just wanted to understand the sales strategy.
Thanks.
K.T. Jithendran
Hi, Muralikrishnan. See, this sales strategy of course we try to launch a certain number of towers, apartments, units, etc.
creating a market assessment of that particular micromarket, how much is the demand that can be absorbed, what kind of strong velocity can we command, and what kind of ticket sizes we can deliver or we can launch in that market which will get absorbed. If you launch too much, then and you're not selling, then of course there will be a cash flow mismatch because construction has to be done even if you sell one square foot.
We try to match to the extent the best of our estimate how much demand is the market having and we should at least try to get about more than 50% of the product launched as sales. Also, and we try to manage the entire business plan cash flow by dividing the entire project into reasonable sizes of phases.
If it is not a large enough project, then we may do it in single phase. Also depending on which micromarket it is.
Now our aim constantly in sales is to get as quickly cash-positive or cash-neutral as possible. Once we have achieved that and we see that the project is now completely in cash-positive area, we'll try to maximize the EBITDA margins.
Return on capital employed is the first goal. Till that extent, we go after velocity.
Once you achieve that, then we look at also maximizing the EBITDA margins. That's largely which dictates our sales strategy.
Muralikrishnan Raghunathan
Understood. Thanks.
That was it.
Operator
Thank you. The next question is from the line of Chetan Sharma from Systematic Shares and Stocks Limited.
Please go ahead.
Chetan Sharma
Am I audible?
K.T. Jithendran
Yes, Chetan.
Operator
Yes, please.
Chetan Sharma
Thanks for the opportunity, sir. My question is regarding the land bank.
What's the land bank we are having now, and what's the expected GDV we can expect from that?
K.T. Jithendran
I think we have sort of delineated it in our presentation. We have about 70 72,000 crores of GDV today, of which about how much is launched?
About close to 30,000. I think it's all laid out in our presentation.
31,000 we have launched, the balance is our land bank. Of this, we have sold about 70-75% of what we launched.
Chetan Sharma
Okay.
K.T. Jithendran
All the details are there in our investor presentations. You should check on to slide number 19.
Chetan Sharma
Sir. Thank you.
That was from my end.
Operator
Thank you. The next question is from the line of Darshika Khemka from AV Fincorp.
Please go ahead.
Darshika Khemka
Hi, thank you for the opportunity. I see that you have a BD pipeline
Operator
Ma'am, I'm sorry to interrupt you. Your voice is muffled.
Can you please use your handset?
Darshika Khemka
Yes.
Operator
Ma'am, it's feeble. Can't hear you.
Darshika Khemka
Sorry, just a second.
K.T. Jithendran
Better
Operator
now. Please proceed.
Darshika Khemka
I see that you have a potential BD pipeline of 60,000 crores. Could you just throw some more light on this as to what part of this could get converted in this year, what projects are we looking at, some more details on this?
K.T. Jithendran
See, at this juncture, this is confidential and not able to give more color on this. I wish that we can convert all of them.
That's to be our attempt. Depending on how the due diligence progresses, if the due diligence goes well, then perhaps we can grab all of that.
It's quite likely that we may do about a percentage of it. Now how much percentage, I'm not in a position to disclose.
Darshika Khemka
Okay. No indicative number of what project out of this,
K.T. Jithendran
probably we are in final discussion? You really can't,
Darshika Khemka
Darshika.
K.T. Jithendran
Very difficult to predict, Darshika. Yeah.
Darshika Khemka
All right. Also, I had a question.
We were on the verge of closing a 10,000 crore worth of BD project. Any update on that?
We don't seem to have converted that as well.
K.T. Jithendran
We're progressing on that. All right.
Darshika Khemka
That is a part of the 60,000 crore pipeline that we're talking about?
K.T. Jithendran
Yes, it is. Of course, it is, yeah.
Darshika Khemka
All right. That's it from me.
Thank you.
K.T. Jithendran
Thank you.
Operator
Thank you. The next question is from the line of Dixit Doshi from Whitestone Financial Advisors Private Limited.
Please go ahead.
Dixit Doshi
Thank you for the opportunity, sir. Sir, we've been invested in this company since last 3-4 years and the one big reason is that our vision of becoming top three or top five real estate player in the country.
When we see our business development pipeline, all the projects that we launch, we get a very good response. We have created a very good product.
Our sales team is fine. We are getting good response.
When we see business development pipeline and we see our competitors' business development, what they do, do you still think we can become a number three or number five player in the country? Because our competitors are doing a BD of say 20,000, 30,000, 40,000 crores, and we have done just 1,600 crore last year.
Because until we do that, our sales pipeline will always remain lumpy.
K.T. Jithendran
I think it's a very good question, Dikshit. One of the reasons I would strongly attribute to the outstanding success we had in our sales and launches is because of the way we choose our BD.
If you had been casual about our BD selections, then I don't think we could have got such incredible success in our launches and the way we priced it, the kind of margins we are commanding. Having said that, of course, there's no question that we have to improve our BD.
We are working on it. Again, as I mentioned in the past, that's not absolute possible to do BD in a systematic, quarterly basis, depending on the risk and the kind of proposals we get, the kind of rigor of due diligence we conduct.
Some of them fall through, some of them move ahead. Several factors have to come together.
Our attempt is there on that. I wouldn't really hesitate to compare ourselves with anybody else.
Each one has their own risk profiles, approach, strategy, geographic market, market segments. Many variables are there.
We are in a very particular, clear segmented market, very clear positioning, with very clear strategy. In that segment, we are very clear how we're doing our BD and our approach is very clear.
We'll go in that path, not get distracted by what competition is doing. However, be well aware that if there are any chinks in our armor, we would like to obviously buck up and not be defensive about it.
We are also very sure that we would like to be among the top real estate companies in India, but not just by size, but also by reputation. It has to go both together: reputation and size.
Just by size is not something that we are going after. I hope I've been able to explain myself a little bit, Dikshit.
Dixit Doshi
Yeah. Sure, sir.
Thank you. Just couple of small questions.
Sir, how many units we would have sold totally in Niyaara 2?
K.T. Jithendran
Niyaara Tower B, I think we have sold net net about 119 out of 148.
Dixit Doshi
Okay. Regarding commercial projects, you mentioned something about Worli and any other commercial project?
K.T. Jithendran
We are looking outside of Worli also. We are having a strategy to really do premium commercial spaces across regions.
Dixit Doshi
Okay. That's it.
Thank you.
K.T. Jithendran
Thank you, Dikshit.
Operator
Thank you. The next question is from the line of Vedant Rane from Unifi Capital IMA.
Please go ahead.
Vedant Rane
Hello, sir. Hi, sir.
Good morning, and thank you for the opportunity. I would just like to ask one question on MMR, that we have launched two projects here and as a percentage of booking as a percentage of GDV, we can see that we are less than 50%.
In other regions, that is NCR and Bengaluru, we have able to achieve greater than 95% of the GDV. Are the is there any specific reason for that like demand or supply?
Or are the launches were the launches were in the late, late of March at the end of March? We can see in in Q1 FY27.
K.T. Jithendran
Hi, Vedant. I think you have asked the question and answered it yourself.
Vedant Rane
Yeah.
K.T. Jithendran
Precisely that, because we just launched at the fag end of March. I'm hoping that the whole this thing will skewed this year.
This year, I think because of the Tower C launch and renewed focus on Taranya in Thane and Boisar Birla Mrida, I think we're seeing a very strong skew in favor of Mumbai region, MMR region this year.
Vedant Rane
Sir. Got it.
Regarding the Pune market, what is the situation there? There also I can see that it's around 35-40% of our GDV.
K.T. Jithendran
Yeah. Pune is a steady market.
It has its limitations also and strengths also. I think it's a good market to be there.
It's steady demand, not too much of a price rise, but because of very nature of the commercial and demand in that market and of course from spillover from Mumbai and NRI demand, etc., I think it's a very good, strong market to be there. We can't expect a Gurgaon happening there, but I think steady, strong velocity is what we expect there.
Vedant Rane
Sir. Got it.
Thank you so much, and all the best.
Operator
Thank you. The next question is from the line of Varun Julasaria from 360 ONE Capital.
Please go ahead.
Varun Julasaria
Thank you for the follow-up, sir.
K.T. Jithendran
Sir, just wanted to know that
Varun Julasaria
this quarter we offered quite a few payment plans. Just wanted to know how much of the proportion from 4,300 crore was through these payment plans and how much was construction-linked plan?
K.T. Jithendran
See, largely almost bulk of our proposals are all on construction-linked plan. In even if there is a payment-linked plan, largely we try to ensure that by that by the time we finish the structure of the building, we try to get at least 60-65% of the money.
Just barring here and there depending on what that market's trend is, very strong trend depending on what, the others are doing in that market and strong demand from, the the the market forces there, we may have to at some point of time given some sort of flexibility in payment. Again, the the overall arching premise, the policy that we would like to collect at least 65% by the time we finish the structure of the building.
Varun Julasaria
Sir. Does this imply a bit of a slow down in the velocity across the market, or is it more to do with competitors offering it and See,
K.T. Jithendran
look at our launches. We did about nine launches last year.
A bulk of them came in the last quarter because of the approval process. If you look at our response has been outstanding.
We have done 97%, 100% of launch sale. I really can't blame that there's a slow down, not in any of our projects.
Take it Bangalore sustenance, take it Gurgaon launches, take it Thane. Any of these markets you look at, I really can't point a finger to any of our launches there has been a slow down.
That is not yet reflected in any of our launches.
Varun Julasaria
That's what we were thinking, why this payment plans are offered when we were already clocking very high
K.T. Jithendran
Payment plans are more market forces, and there has been this geopolitical development which happened in the last quarter. People are not able to really get money quickly into the market.
All these things happened in the last quarter. That's one reason why people found it really difficult to They're desperate for making bookings, but the cash flow liquidity was a huge problem because the developments in the war scenario in Middle East and all that.
That generally impacted. That's why we had to do some extension in that market.
Otherwise, and all of them are come back very strongly this quarter with their payment plans. This is largely because this recent developments.
Varun Julasaria
Lastly, sir, on the construction material, are we seeing any issue in sourcing, and how much cost escalation we factor in for future, given that almost everything has gone up?
K.T. Jithendran
Because of oil prices and disruption in supply chains, there has been an impact on cost. Being a very prudent planners, we have already taken it in our contingency measures, etc.
As of now, we don't see any of them. It's quite likely that if these situations continue, there could be an impact.
We have been prudent enough to take reasonable contingencies and escalations in our business plans. If the current situation continues or deteriorates further, then of course there will be an impact.
Varun Julasaria
Availability is not an issue, right? It's not stopping.
K.T. Jithendran
Availability is not an issue, but transportation, it's a bit of delay, has impacted slightly.
Varun Julasaria
Sir. That's it from my side.
Thank you.
Operator
Thank you. The next question is from the line of Sinclair from Lalkar Securities.
Please go ahead.
Hello. Am I audible?
Operator
Yes, sir.
K.T. Jithendran
Can you be a little louder, please? Yeah.
Is this better?
K.T. Jithendran
Yeah. Good.
Yeah. I just wanted to know what is the potential for the senior living for you all basically?
K.T. Jithendran
Yeah. I think senior living by itself is a huge, explosive market potential in India, huge demand.
As we all know, India, the aspirational population is growing. They have become wealthy, comparatively much more wealthier than what they were in the past decade.
They can afford a lot of things. They're looking for good convenience and luxury, and there's a lot of people in India who can afford it.
A huge part of it is people who are done well in life and many of them want independent living, luxury living, and a big part of it is in senior living. They're all looking for the same amount of comforts which they can afford, and they always also want to be independent.
I think there's a massive market for it. We have to find the right sizing and location for that.
We see a huge opportunity in exploiting that, and we're looking very, very aggressively in that market,
exploring. Got it.
Sir, any idea what would be the revenue potential?
K.T. Jithendran
It's too early to predict at this point of time, but I'm sure it'll be very healthy and very strong.
Got it. Thank you.
Operator
Thank you. The next question is from the line of Muralikrishnan from Sundaram Mutual Fund.
Please go ahead. Mr.
Muralikrishnan, I have unmuted your line. Please proceed, sir.
Sir, the participant has left the queue. We will move on to the next question from the line of Biplab Debbarma from Antique Stock Broking.
Please go ahead.
Biplab Debbarma
Thank you. Sir, just two small clarifications.
One is the commercial development in Worli. What how many towers and total area is 1.
is it 1.3 million square feet? What would be the estimated cost for capex of to be incurred for this project?
K.T. Jithendran
I think we are looking at least about a single tower, roughly about 1.3 million, 1 to 1.3 million. We're in the process of designing that.
Cost is too early at this point to estimate, Biplab. We'll have to come back to you on that depending on we're in the process of design and then we do all the MEP and structures and all that.
It's very early stages at this point of time.
Biplab Debbarma
Entire 1.3 at a
K.T. Jithendran
Yeah. It's one tower that we're looking at.
It's in a range. It could be approximately about 1.3.
It can vary a little bit here and there, yeah.
Biplab Debbarma
Second question is on the your launch pipeline. In terms of GDV, it appears broadly similar to what you had in FY26 in terms of launches GDV.
In FY27, pipeline also includes Niyaara, where the expected absorption maybe relatively lower compared to, say, Ananya, Trimaya, or even Taranya. Considering these factors, I'm assuming these factors are correct.
Considering these factors, it appears challenging to expect the pre-sales in FY27 could be similar, in the similar 8,000 crore or maybe slightly lower than FY26 level. How do you see this assessment?
K.T. Jithendran
I don't want to comment on that because as I said, it's very difficult to give you in other words, you're asking for guidance, which I can't at this point of time give you. I only know that we have so much of inventory here, and we have to do the best utilization of that.
Biplab Debbarma
Sir. Thank you, sir.
K.T. Jithendran
No worries.
Operator
Thank you. Ladies and gentlemen, we will take that as the last question for today.
I would now hand the conference over to the management for closing comments. Thank you, and over to you.
R.K. Dalmia
Thank you, everyone, for taking out time to attend today's call. We are very excited for the times to come and hope to come to you with a lot of news in the next call.
Thank you very much for an interest in our company. Thank you.
See you soon.
Operator
Thank you, members of the management. On behalf of HDFC Securities, that concludes this conference.
We thank you for joining us, and you may now disconnect your lines. Thank you.
Already premium?