Q1 FY2027 · Earnings Call TranscriptAugust 13, 2026

Operator

Ladies and gentlemen, good day, and welcome to Diamond Power Infrastructure Limited Q1 FY '27 earnings conference call, hosted by Monarch Networth Capital. As a reminder, all participant lines will be in the listen-only mode, and there will be an opportunity for you to ask questions at the end of today's presentation.

Should you need assistance during this conference call, please signal an operator by pressing star then zero on your touch-tone phone. Please note that this conference is being recorded.

Before we begin, a brief disclaimer. This conference call may contain forward-looking statements about the company, which are based on beliefs, opinions, and expectations of the company as on the date of this call.

These statements are not the guarantees of future performance and may involve risks and uncertainties that are difficult to predict. I would now like to hand the conference over to Mr.

Mohit Surana from Monarch Networth Capital. Thank you, and over to you, sir.

Mohit Surana

Good morning, everyone. Welcome to Diamond Power's Q1 FY '27 earnings call.

Joining us today are Mr. Amit Bhatnagar, Head Corporate Strategy; Mr.

Pawan Lohiya, Chief Financial Officer; and Mr. Umesh Chhaya, Whole-time Director.

With that, I will hand over the call to Mr. Bhatnagar for his opening remarks.

Over to you, sir.

Amit Bhatnagar

Good morning, everyone, and thank you for joining us. I'm Amit Bhatnagar, Head of Corporate Strategy at Diamond Power.

On behalf of our directors and the entire leadership team, it is a pleasure to welcome you and to do so at what is genuinely an inflection point in our story. For those of you meeting Diamond Power for the first time, let me place us in a single sentence.

We are one of India's fully, truly integrated manufacturers of power transmission and distribution products in the cable and conductor segment, spanning the full voltage gamut from low voltage to the extra-high voltage, all produced at a single 110-acre integrated complex in Vadodara in the state of Gujarat. From wire rod through to finished extra-high voltage cables, the entire value chain sits under one roof.

Very few companies in our industry anywhere in the world carry that degree of integration, and it is the foundation of everything I will describe this morning to you. Let me begin where it matters the most, with the quarter's results and with the conditions in which we have earned them.

This year, India's monsoon arrived early and arrived hard. From this very first week of the first week of June, Gujarat saw heavy and sustained rainfall, and a large number of our customers' installation sites were flooded.

For a business where so much medium-voltage cable is laid, it is that that problem is the most destructive weather imaginable. Trenching and cable laying simply cannot proceed when the ground is underwater.

It impacts our product. It also impacts our product mix, as conductors and LV cables are not impacted much.

Our first quarter is always the most seasonally demanding of the year. This year, it was more demanding than most.

However, we have met our internal targets of ₹700 crores. Against this backdrop, we more than doubled our top line.

For the quarter ended 30th June 2026, on a consolidated basis, revenue was ₹690 crores, that is roughly $83 million, up 129% year on year. EBITDA was ₹85 crores, up 172% on a margin of 12.3% and an expansion of nearly 200 basis points.

Profit after tax was ₹58.5 crores, up 191% at a net margin of 8.5%. Earning per share for the quarter was ₹1.11 on a face value of ₹1.

I would I would ask you to hold these three growth figures together: the revenue up 129%, EBITDA up 172%, profit up 191%, because the pattern the pattern within these is the real message. Our profit is growing considerably faster than our revenue.

That is operating leverage doing precisely what it should. As our newer and higher-value production lines mature and carry most of the load, to have delivered growth of this magnitude through a flood-affected monsoon quarter is not a seasonal accident.

It is evidence of the structural momentum now that Diamond Power business is gathering. Let me say a word of specifically about margins, because there is an important story beneath the headline.

Raw materials, aluminum and copper, both stood firm through the quarter, and a portion of our order book is executed at prices agreed before this input moved, the pass-through as per percentage of our sales reaches us with a lag. Neither of these is structural.

Mix normalizes as that high-voltage lines fill throughout the year, and metal cost is over any reasonable horizon a pass-through in the way our contracts are written. We are completely back-to-back on passing the increases in metal and polymers to all our customers.

What I would draw your attention to is, despite this gross margin pressures, our EBITDA margin still expanded by close to 200 basis points to 12.3%. That is precisely the operating leverage I described earlier.

As revenue more than doubled, our fixed cost base—people, plant, overheads, power—was spread a far large on a further far larger top line, and the gain in absorption more than offset the compensation compression higher on the P&L. Put plainly, we absorbed a weaker gross margin and still delivered a materially stronger operating margin.

As mix and utilization both improve from here, we expect the gross margin headwind to ease and the operating leverage to compound on the top of it. You will certainly see its impact in the next three quarters.

One brief note on the accounts, nothing surprises you. Our tax charge for the quarter is negligible as we continue to carry forward accumulated losses from the period preceding our resolution plan, a benefit that will taper over time as profitability continues, but is there with us at least for the next two years.

A second note on the comparative. In our prior accounts, you would see an exceptional item, a provision for depreciation related to earlier periods which had not been charged in the years surrounding our resolution plan and was recognized as a one-time catch-up once the plan was implemented.

I flag it to you for a simple reason: it is a non-cash, prior-period accounting adjustment that sits below our operating line. It does not touch our EBITDA.

It does not reflect the earning power of the business as it runs today. It does not reoccur.

When you compare this quarter, the cleanest read on the underlying business is the operating level, where none of that noise is present. More importantly, the auditor qualification which was on the books till now stands resolved, and the numbers are without any qualification.

I would also remiss not to record a milestone reached during this quarter. We completed a QIP placement raising ₹1,640 crore ₹1,614 crores, close to $195 million, achieving full minimum public shareholding compliance and welcoming marquee institutions into our register.

To every investor who participated, thank you so much. You placed your confidence in Diamond Power at a formative moment in its journey...

Sir,

Operator

sorry to interrupt you,

Amit Bhatnagar

sir.

Operator

Your voice was breaking.

Amit Bhatnagar

Okay.

Operator

Can you just repeat the last 10 seconds?

Amit Bhatnagar

You placed your confidence in Diamond Power at a formative moment in its journey. We are acutely conscious of the responsibility your capital carries.

We intend to honor it through our performance. Our last two years' performance shows how quarter by quarter we have delivered, and we strongly believe in delivery rather than giving any forward-looking strong assurances.

Let me be precise about the timing of that capital, because it shapes how these results should be read. The quarter you have just heard, ₹690 crores of revenue, profit up by 191%, delivered before a single rupee of the QIP proceeds was put to work.

Q1 was earned on the balance sheet as it stood without the benefit of that fresh capital. Those funds are now being deployed into the capacity I'm about to describe, and the impact on our numbers is not a first or second-quarter event.

It converts into P&L as the new lines commission and load, which means it lands squarely on the third and fourth quarter. Put simply, the clearest evidence of what this business can do is still far ahead of us in the second half.

Let me now turn to the strategy beneath these numbers, because the results you have just heard are the visible face of a very deliberate shift the company is going through. Diamond Power is moving decisively towards a leadership position in the medium-voltage and extra-high-voltage segment of India's cable and conductor market.

If you take one thing from this call, I would like it to be that. The logic is straightforward.

A very large share of our industry volume sits at the commoditized end: low-voltage cables, where competitors are many and differentiation is thin. The enduring value sits higher up the voltage ladder: medium voltage from 11 to 66, and extra-high voltage above it, where qualification is difficult, the field of credible suppliers is narrowed, and the realizations are materially better.

That is where Diamond Power has chosen to build and where we intend to lead. This is not an aspiration.

It's being financed, engineered, and installed on the ground. Let me be specific about the capacities coming into place.

First and foremost, we have just approved in the board two aluminum corrugation lines that will materially expand our 66 kV cable capacity and 132 kV cable capacity. This let us convert capacity from 33 kV up to 66 and 132, where margins are lower, moving our cable mix decisively up the value curve.

It is important to understand that with the same CCV lines, by adding two more aluminum corrugation lines with a minimal capex of ₹17 crores, we have opened up 66 and 132 capacity substantially by compromising one line of 33 kV and added more value-added products, our return on investment becomes stronger. Secondly, I'm very happy to share that we are in the final stages of ordering our sixth CCV line, and this is purely based on the demand which we are seeing and also the inputs and questions from our investors as to what are your plans on increasing the capacity.

We will order one more line, and that should be commissioned before December 2027. The most important part here is we are not going to do any additional civil capex or utility capex, because our existing infrastructure has a scope and provision to add one CCV line.

Only the equipment will come in. There are no additional utility and infrastructure costs involved.

It deepens our capability at precisely the end of the market where we intend to lead. Third, our two additional medium-voltage cable lines are under installation, and I'm happy to tell you they are on schedule.

This is the workhorse capacity for 11 to 220 kV segment that forms the largest single block of our order book, and its timely commissioning is central to our execution plan for the year. Taken together, these are not incremental additions.

They are the physical build-out of a company positioning itself to lead in the medium and extra-high voltage, capacity coming online in step with the order book already concentrated at end of the product. There is a further engine that I want to highlight, our new LV cable project.

We are converting our old rod mill and legacy conductor plant into a modern low-voltage and control cable facility for both aluminum and copper, a brownfield upgrade with no civil construction cost. At full utilization, it adds around 42,000 kilometers of LV capacity, with revenue potential approaching ₹1,880 crores.

Two things make it strategically important: first, it is deliberately built for copper LV cables to suit data centers. Diamond is on the forefront of getting data center orders in the country.

We are concentrated more on medium-voltage cables, we do not want the LV part of the business to go from us. Secondly, it broadens our base: a high-volume LV engine sitting beneath our medium-voltage and extra-high-voltage franchise, and a meaningful contributor to the ahead.

Commercial production is expected from financial year 2027-28. We'll commission it before March.

The order book is the foundation of our confidence. As on 11th August 2026, it stood at ₹3,688 crores, roughly $445 million, and about two times of last year's revenue across 12 product lines, and it continues to grow, with over ₹1,000 crore of fresh wins since April.

I'm also very happy to tell you that in the last 6 to 7 days itself, we have taken orders worth ₹400 crores. We report orders above ₹50 crores to the market.

Therefore, you have seen that we have reported two major orders: one from Rajesh Power for disaster management, and second order coming in from Electricity Board, other miscellaneous orders in last seven days itself, we have added ₹400 crores. The medium-voltage band is its largest single component.

Our ₹435 crore data center order sits within it, and roughly ₹845 crores out of this 3,688 is to be executed in the next year. For the current year, we are holding an order book of around ₹2,800 crores to be delivered before March, along with the fact that we are adding between ₹275 to ₹325 crores of orders every month.

We are confident that when we begin the next year, we would have got the next year targets more than 50% to 60% order book in place. Let me direct about the full year.

We delivered ₹690 crores in the toughest, most flood-affected quarter of our calendar. The new capacity comes on stream through the year, and the order book underwrites the ramp-up.

On that basis, we are firmly on track to deliver a full-year top line in the range of ₹4,300 to ₹4,500 crores, and to do so while holding the margin profile you've seen this quarter, not sacrificing it for the volume. Let me put some structure under this ring, because I know it implies a meaningful step from ₹690 crores first quarter.

Three things bridge the gap. None of them ask for heroics.

The first is seasonality, simply reversing. Our first quarter is every year our weakest, and this year the early monsoon made it weaker still.

If the rain would have come on time, you could have seen an incremental ₹70 to ₹80 crores top line and the corresponding EBITDA on the books. Our second half is consistently our strongest, the base is built from it.

It is a first quarter that was by design and by weather the low point of the year. The second is utilization.

We entered the year running the plant well below its capacity, with several lines only partially loaded and the newest ones still in ramp. As the two aluminum corrugation lines and the two medium-voltage lines commission and load as the existing lines fill up against a growing order book, supported by the large fundraise which we have, our utilization rises materially.

Because so much of our cost base is fixed, each incremental point of utilization converts to revenue and margin very efficiently. To reach ₹4,300 to ₹4,500 crores range, the balance sheet of the year needs to run at close to twice the pace of the first quarter, measured against the capacity we already have installed and commissioning.

That is a step-up in the utilization, not a stretch of our capacity. The third is the order book I have described moment ago, ₹3,688 crores already in hand, the great majority of it scheduled for execution within the financial and the next year...

Sir,

Operator

sorry to interrupt you,

Amit Bhatnagar

sir. Yeah.

Operator

Yeah. Now your line is clear.

Amit Bhatnagar

Capacity coming on stream, utilization climbing off a low base, and a funded order book converting into dispatch, that is what underwrites ₹4,300 crores to ₹4,500 and why we hold it to confidence. Let me place all of this in a wider context, because we are operating a genuinely powerful and durable cycle, a reading shared across our listed peers.

India is in a structural capital-led expansion of its power infrastructure, and several independent engines are pulling demand at once. The national transmission build-up is adding new lines at scale to evacuate renewable power from the great generation parks, RE being foremost among them, which require extra-high-voltage cable and conductors.

Aging distribution grids are being reinforced and moved underground, squarely medium-voltage demand is coming. Smart city mandates require underground urban cabling.

Climate resilience has become a procurement driver in its own utilities, as utilities in flood and cyclone-exposed regions convert overhead networks to the underground systems to keep lights on through exactly the weather we saw this quarter. The data centers sit on the top of it all.

India's installed capacity base is set to expand severalfold, and every megawatt carries a substantial cable requirement. Most importantly, these are not abstractions.

Let me give you two very recent concrete proofs that demand is converting into orders. The first is a 1,370-kilometer medium-voltage order from Gujarat distribution utility through Rajesh Power, supplying underground cable for disaster management and urban scheme across the coastal belt, precisely the climate resilience demand I have described, and a firm order we are already executing.

The second is a letter of intent from a distribution company in the UP Electricity Board for a high-tension cable across multiple utilities, a win that opens one of India's largest distribution markets to us at the higher-voltage end. Coastal Gujarat and Uttar Pradesh, exactly the medium-voltage, high-voltage business our strategy is to build to win.

None of this is delivered by capacity and order alone. It is delivered by people, and we have been building our team with the same deliberation.

This quarter, we welcomed Mr. Umesh Chhaya to our leadership team as an industry veteran and retail specialist with more than three decades in the cabling industry and a recognized authority on costing, pricing, and distribution-led sales.

His mandate is to build our distribution reach and our retail franchise, with a particular focus on MV and EHV categories where we intend to lead. Behind him, the company has more than 15 leaders at AVP and VP levels across our functions, and we are now assembling a dedicated, sizable export team to take our products US, Middle East, and Africa as our certifications come through.

Several further appointments will join the company over the next two quarters and strengthen our team. For a company not long ago was working its way through a resolution plan, this quarter says something simple: the turnaround is not merely complete, it is compounding, and it is deliberate.

We are deeply grateful for your confidence in Diamond Power, and we are determined to reward it. Thank you.

I will now hand back the mic to the moderators.

Operator

Thank you very much, sir. We will now begin the question-and-answer session.

Anyone who wishes to ask a question may press star and one on their touch-tone telephone. If you wish to remove yourself from the question queue, you may press star and two.

Participants are requested to use handsets while asking a question. Ladies and gentlemen, we'll wait for a moment while the question queue assembles.

We have our first question from the line of Rohan Kalle from Antique. Please go ahead.

Rohan Kalle

Yeah. Hi, team.

Congrats on a strong set of numbers. I just have a couple of questions.

We currently have three rod mills, four CCV lines, and four MV silane lines which are operational. By when will the fourth rod mill start production?

The incremental one silane line and one CCV line underway, when will these start production?

Amit Bhatnagar

The rod mill should start by 15th of October. The incremental MV silane line should start somewhere by 15th of September.

The CCV line will start in March 2027.

Rohan Kalle

Okay. Sir, in general, this sixth CCV line that has received an in-principle approval with a purchase order being targeted this month, is that order placed?

Or rather, if it is placed in this month, by when can the delivery come for this line?

Amit Bhatnagar

We are getting delivery assurances for August next year. There is one line which is available in the market.

We should place the order within this month. We have arrived at a price already for the line.

Once it is delivered, it shall take us 4, 5 months to commission it. We are confident that we can get commission by December 2027.

Rohan Kalle

Okay. Last one for now, and then I'll come back into you.

On the export side, what is maybe the timeline for the first export sales that we can expect? Which geographies would we be targeting first?

Maybe what kind of products can we target here? What are we building maybe in terms of exports over the next few years, if any guidance you can share?

Operator

Sorry to interrupt you, sir, but we are unable to hear you.

Amit Bhatnagar

The export at present is very negligible, and we are building a team for exports. We have got some key people who have joined us and are joining us in the next 90 days.

On the other hand, our certification process for various markets, especially targeting Europe and the US, are on track. We are confident that quarter three and quarter four, we will see a good export inflow of orders.

For this year, we've targeted that we will get a order book of at least ₹500 crores before we end the year. This shall be our first year, we will target conductor business and medium-voltage business in the current year.

Rohan Kalle

Understood. That's helpful.

Just on talent, you've been hiring top executives from the industry. Your latest addition, Mr.

Chhaya, would be a big addition in terms of at least within your senior leadership team. What gaps do you see are still left maybe across functions like sales, marketing, production, and so on?

Amit Bhatnagar

I will not use the word gap because we are appropriately manned today. When we say that we will grow from ₹1,900 crores to ₹4,500 and the year next to ₹7,500, we need to build a team.

We need to strengthen the team at every stage. Most of the hires are going to be in the higher part of the lower middle management, and one or two areas we will get leaders also.

The major focus will be on higher side of the middle management so that we are able to deliver the quantum increase which we are planning.

Operator

A reminder to all participants, if you wish to ask any questions, you may press star and one on your touch-tone phone. We have our next question from the line of Mahesh Patil from ICICI Securities.

Please go ahead.

Mahesh Patil

Yeah. Hi, sir.

Congrats on a very good set of numbers. My first question is on the HTLS side.

You have mentioned in one of the slides that HTLS is one of the products for data centers, right? Just want to understand where does it go exactly, because from what I understand, HTLS is largely used for reconductoring, right?

Amit Bhatnagar

Correct. HTLS is used for reconductoring, that is where the answer is, because the data centers are being put up in urban areas.

It is like Hyderabad, Navi Mumbai, where the existing transmission lines have to be upgraded or the current-carrying capacity has to be increased where data center comes in. To give you an example of the Navi Mumbai data center coming of Adani, they are upgrading a line with an HTLS conductor.

Same way is the case in Hyderabad data center of Microsoft, that the incoming transmission line has to be upgraded, it cannot be relaid because of the geographical conditions. One of the important uses of HTLS is going to be for data centers.

Mahesh Patil

Okay. Sir, my second question is more on the industry side for AL-59.

We have seen AL-59 production has gone up significantly over the last couple of years, right? Just wanted to understand in terms of split roughly how much of it is coming from new line versus just kind of upgrading the existing line.

If you can just roughly give us the split. Right.

Amit Bhatnagar

Yeah. AL-59 demand is not coming from upgradation projects.

It is majorly coming from new transmission lines in the TBCB segment and by the state distribution of utilities, to the extent that Diamond has stopped producing ACSR conductors, which is the traditional conductor, because most of the customers who are buying ACSR have now shifted to AL-59. Earlier, traditionally, ACSR used to be the main product of the conductor industry.

Now AL-59 is almost 70% of the market.

Mahesh Patil

Sir. Got it.

Thank you.

Operator

Thank you. We have our next question from the line of Ajit Sethi from Equicontum Solutions.

Please go

Ajit Sethi

ahead. Thank you for the opportunity.

Sir, with net worth still negative and having now raised around ₹1,600 crores through QIP, will this infusion be enough to make Diacabs' net worth positive? If yes, by when?

Out of this ₹1,600 crores raised, how much is going towards clearing promoter debt, legacy liability versus funding new capacity?

Amit Bhatnagar

Okay. On net worth, Pawan, why don't you share?

Pawan Lohiya

As on 30th June '26, our net worth is negative by ₹922 crores. After this QIP, proceeds from QIP, which is ₹1,614 crores, as on today, our net worth is positive by ₹691 crores.

Yeah.

Amit Bhatnagar

Now coming to the usage of the funds from QIP, it is very clearly mentioned that we will be spending ₹130 crores on our LV cable expansion, ₹74 crores on our present balancing equipment part, 600 ₹325 crores for general corporate purposes. We would be returning back ₹350 crores of the unsecured loan to the promoters, and the remaining will go towards long-term funding of the working capital.

Around ₹750 crores will go towards infusion towards working capital.

Ajit Sethi

Great to hear that, sir. Sir, on May 2026, PMLA discharged or released ₹10 billion-plus of fixed assets and ₹9.78 billion of pre-NCLT receivables.

Has the company started using or monetizing this? How much of this receivable do you realistically expect to recover in cash?

Amit Bhatnagar

See, the asset was already under use since last four years because under PMLA, possession was not taken. It was given to the new management.

What has happened is now legally it has got discharged, and under IBC's clean slate theory, it is basically the right of the new management to take over the assets. Whatever little legal hurdle was there got settled in May.

Coming to the receivables, there are ₹957 crores of legacy receivables on the books. Post this order, we have put a special team in place comprising of one senior legal hand, one senior guy from accounts, and three juniors.

We are doing a first-stage evaluation on how much can be recovered. At this stage, it seems around ₹300 crores can be recovered over a period of next 1 1 year to 18 months, and that is where we will focus and we feel we'll be able to get it.

Ajit Sethi

Okay. Sir, regarding the audit qualification on depreciation of PPE, the company has indicated that the issue is resolved.

How should we think about the depreciation expense going forward?

Amit Bhatnagar

The depreciation which you are seeing the first quarter will be the depreciation going forward, save whatever additions we are going to do. Pro rata, the depreciation will be there in each.

Ajit Sethi

Okay. Sir, in our previous presentation, we have indicated that our existing capacity at peak could generate around ₹14,000 crores of revenue.

Is the upcoming new capacities already factored into this estimate, or it will be incremental to this ₹14,000 crore revenue potential?

Amit Bhatnagar

No, it is factored, and accordingly, we have said additions. It will be factored.

Ajit Sethi

Okay. Sir, just a clarification from the previous call before, we expect ₹7,500 crore in FY '28.

Have we mentioned that? Yes.

Amit Bhatnagar

Yes.

Ajit Sethi

Can we expect to do a ₹14,000 crore in FY '29 full utilization?

Amit Bhatnagar

No, no, no. No.

No. Okay.

Ajit Sethi

We were expecting somewhere around 75% utilization in next 3 years. Is that guidance intact?

Amit Bhatnagar

We are targeting ₹7,500 crores. We are a growing company, the market is growing, we are now getting financially stronger, we have zero virtually zero debt on the books.

If we see some opportunities going forward, organic, inorganic, some products doing better, three years is a long time. We are open in terms of how we can ramp up and scale up.

We are always on the lookout.

Operator

Thank you, sir. Ajit, we request you to rejoin the queue for any follow-up questions.

We have our next question from the line of Nishant Bagrecha from InCred Research. Please go ahead.

Yeah.

Nishant Bagrecha

Thank you for the opportunity and for taking us through the business strategy in details. Sir, I have specific questions regarding your guidance, the order book execution, and also a few questions around the broader industry opportunity.

Firstly, regarding your near-term guidance for FY '27 of around ₹4,500 crores, which implies the remaining three quarters need to average roughly around ₹1,200 to ₹1,250 crores per quarter versus ₹690 crores in 1Q. You have explained that seasonality, utilization ramp-up, and order book execution bridge this gap.

Could you help us understand the phasing a little better? Should we expect a more gradual ramp-up through Q2 and a sharper acceleration in second half of current financial year, or should Q2 itself see a meaningful step-up?"

Amit Bhatnagar

No, it is always gradual. If you see last year also, every quarter we grew almost 50%, and seasonality in our industry is very clearly that the first quarter is rain-affected, second quarter is partially affected, the third and the fourth quarter is always the strongest.

In fact, the fourth one is always the biggest quarter because the projects have to be commissioned before March, the customers are willing to lift the material faster, infrastructure projects have their deadlines, capacity we already have on our side. It is going to be a gradual ramp-up, but we clearly see that we'll be able to meet the target.

Sure.

Nishant Bagrecha

Just a follow-up on this question. FY '26 utilization was, let's say, 34% for cables and 20% for conductors.

With the current order book and also the additional lines coming on stream, where do you see the utilization ending for FY '27 and FY '28, particularly for cables and conductors?

Amit Bhatnagar

Conductors should be around 40%, and cables should be around 50%, 52%.

Nishant Bagrecha

This is for FY '27?

Amit Bhatnagar

Yeah.

Nishant Bagrecha

Okay. For '28?

Amit Bhatnagar

So '28, our LV cable around ₹2,000 crore of capacity will come into picture, our additional CCV line which can make around ₹600 crores will come into picture. We will see a going up in conductor up to 60%, and the cable also will be around 60%.

Nishant Bagrecha

Okay. Okay.

My next question is on margins. You have indicated that you expect to hold the 1Q margin profile while delivering the FY '27 revenue guidance.

Should we think of 11%, 12% as the floor for FY '27, or could the mix improvement towards...

Amit Bhatnagar

Our guidance is between 11% to 13%. This is again dependent upon the metal price.

If you see in the month of May, aluminum was $3,800, and by the end of June, it came down to $3,000. So 22% or 23% margin went down, and it went up from 1st April to 22nd May by 20%.

EBITDA is always a product of sale price versus the COGS and the expense. The absolute EBITDA becomes constant when you have a price escalation contract with you.

That's why we put it a range at 11% to 13%. The quarter one, the sale of LV cable and conductor as a percentage to the total sales is higher because of the reasons I've explained to you.

Medium-voltage cable and extra-high-voltage cables are always delivered at the project site. They cannot be stored in warehouses at the customer's because they will not have the ability to then move them.

As you go to quarter two, quarter three, quarter four, the product mix will change a little bit. Medium and extra-high-voltage product optic will increase as a percentage to sales, EBITDA will be stronger.

Nishant Bagrecha

Okay. The mix improvement towards 66 or 132 kV or EHV cables and higher-value conductors will take margins further from current levels, right?

Is that understanding correct? Yeah.

I have one question on the data center cable orders. You have already won ₹435 crores of data center cable orders, and you are setting up the next line, next copper LV facility, partly with the data centers in mind.

How large do you see this opportunity becoming for Diacabs over the next two to three years, and proportion of your future cable revenue could potentially come from data centers?

Amit Bhatnagar

Because we have this large order, we have a edge going to the other data center projects and talking about ourselves. Internally, we have given the team a target of getting at least ₹1,000 crores of data center orders before 31st March 2027.

In the current year, we are expecting that our data center sales will contribute around ₹750 crores before the month of March. Next year, we will give them a target of getting around ₹1,500 crores.

So 20% is what we want to get from data center business current and in next year. Okay.

Nishant Bagrecha

Okay. My last question is on the industry.

As you mentioned that the 1,370-kilometer underground MV cables order in the opening remark, could you give us the approximate value of this order and the execution timeline, and whether you see similar climate-resilience or undergrounding cabling opportunities emerging from the other states as well?

Amit Bhatnagar

Gujarat has come out with a project which is called ROBUST. The project cost is ₹22,000 crores.

₹16,000 crores. In first set of 43 contractors last week.

Hello.

Operator

Sorry to interrupt, sir. Your line was not clear.

We weren't able to hear you.

Amit Bhatnagar

Is it clear now?

Operator

Yes, sir. It's clear.

Amit Bhatnagar

Yeah. Gujarat is expected to float ₹22,000 crores of disaster management orders in the next three years, out of which ₹16,000 crore is going to be the cost of 11 kV and 33 kV medium-voltage cables.

Presently, 43 tenders got finalized to around 19 contractors. This order from Rajesh Power for 1,370 kilometers related to Paschim Gujarat Vij Company is the first order from that.

Now we are expecting that by the end of the year, the first ₹4,000, ₹5,000 crores worth of orders will get finalized in Gujarat. Now Gujarat is one example.

There are at least 9 to 10 states in India which are on the seacoast which have initiated this process. Tenders in Orissa have come out, tenders in West Bengal have come out, tenders in Karnataka are under the process of coming out, Telangana and Andhra Pradesh, very aggressively the tenders are coming out.

I'm confident that, as I always tell investors, that whatever was the traditional demand of medium-voltage cable till 2022, equivalent five new markets have come into the picture: one is disaster management, vertical urbanization, Indian Railways, smart city projects, and renewable energy. This is one of the most important part.

Nishant Bagrecha

Got it, sir. Thank you.

That's very helpful. I have a couple of other questions, but I'll fall back in the queue.

Amit Bhatnagar

Thank you.

Operator

Thank you. A reminder to all the participants, if you wish to ask any questions to the management, you may press star and one on your touch-tone phone.

We have our next question from the line of Raman KV from Sequel Investments. Please go ahead.

Raman KV

Hello, sir. Can you hear me?

Amit Bhatnagar

Yes, I can.

Raman KV

Sir, I have a couple of questions. One with respect to capex per line.

Currently, how many lines are operational, one is that, and what are capex cost per line, and how much revenue per line on an average can we do?

Amit Bhatnagar

We have four CCV lines operational. We have four silane-based lines operational.

One CCV line installed, but will be commissioned by March. One silane-based line will get commissioned by 15th of September.

One line which we are ordering at present will get commissioned by December 2027. The cost of a silane-based line is between ₹15 to ₹20 crores.

A cost of a CCV line is around ₹50 crores. Again, it depends on what size, denominator rating you are going to do.

The one I'm ordering will cost me around ₹50 crores only for the line. The utility, civil construction, other things cost equal another ₹50 crores.

A CCV line is broadly ₹100 crores where you can make up to 66 and 132. If you go for a bigger line of 220 and 400, the cost would go to around ₹150 crores.

The expected revenue from one CCV line, it again depends on what product you are making. If you are making 66 kV a cable, you can make around 150 kilometers, it's a single-core cable, per month.

And 1 kilometer would, again depending on copper, aluminum, type of corrugation, but would be broadly ₹30 lakh is a reasonable price you can consider. Around ₹45 to ₹50 crores is the revenue from one line.

Raman KV

Understood, sir. Thank you for that.

My second question is with respect to our debt. What will be our peak debt going forward?

Amit Bhatnagar

At present...

Raman KV

By FY '28? Yeah.

Amit Bhatnagar

At present, we have 1 60 ₹75 crore LC, ₹5 crore CC limit from one bank. We are not utilizing it at this point of time because you are aware we have a lot of QIP funds with us.

Whatever money is required to achieve the target for the current year, we will not need any borrowing. Yes, we are looking at how we can get vendor financing, how we can get dealer financing, because that two parts of the business, if we can efficiently finance, support our vendors, support our dealers, we will improve our cash flow and in process will improve our margins.

Next year, ₹7,500 crores, we are estimating that in the current year, if we earn around ₹500 crores plus, and for the next year, the incremental cash is already available with us. Up to 20 20 27-28, we don't expect to have any substantial debt on the books of the company, unless we get some good opportunity or we look for some other additional plans, then I cannot tell you.

As of now, I think mentally, the management and the professionals, we all are very clear that up to March 2028, our strategy, our capacity, and our route is very clear as on date.

Raman KV

Sir, but if my understanding is right, as of March 2026, in your balance sheet, we have around long-term borrowing of ₹2,400 crores.

Amit Bhatnagar

Basically, that was ₹1,900 crores of bonds, 0.01% bonds payable after 30 years. These bonds are owned by the promoter.

The next part was a ₹400 crore unsecured loan from the promoter, which has been paid back post QIP. There is no debt as such other than the residual value of those bonds, if discounted on a net present value, just stood at ₹47 crores in March 2026.

Raman KV

0.01% coupon rate bonds, right?

Amit Bhatnagar

Yes, payable after 30 years. This was the unsustainable debt of the company in the NCLT plan, which was converted to bonds payable after 30 years, and the bonds are now acquired by the promoter from the lenders.

These are unsecured, promoter-held bonds. If discounted on net present value, their value is ₹47 crores.

Raman KV

Understood, sir. Thank you for...

Sorry to interrupt, Raman.

Operator

Please rejoin the queue.

Raman KV

Yeah. My question is done.

Thank you. Thank you so much.

Operator

Thank you. Ladies and gentlemen, in order to ensure that the management is able to address questions from all participants in the conference, please limit your questions to only one per participant.

Should you have a follow-up question, we request you to rejoin the queue. I repeat, participants, please restrict yourself to only one question per participant.

Should you have a follow-up question, we request you to rejoin the queue. Next question is from the line of Sanjay Satapathy from Ampersand.

Please go ahead.

Sanjay Satapathy

Hi, sir. Thanks a lot for the opportunity.

I just wanted to confirm the guidance that you have given. You have given about ₹4,300 crore to ₹500 crore ₹4,500 crore revenue current year, and ₹7,500 crore next year.

Is that correct, sir?

Amit Bhatnagar

Correct.

Sanjay Satapathy

Okay. Sir, we noticed that most other wire and cable companies, they reported significant quarter-on-quarter growth in this quarter one, and you said that it is because of rain and a couple of other things that you did not grow.

Can you just give some more color in this context of how your peers are doing versus what you are doing? Sir,

Amit Bhatnagar

you have to understand our product mix. Most of the listed companies in India are 85% low voltage.

15% is medium and other products. Diamond Power is the other way around.

We are 70%, 80% of our capacities, medium and extra-high voltage. Our products are not used during rain.

We deliver the product on the project site. If you compare us with other companies which are making copper wires, industrial flexibles, the inside wiring work continues during the rains in real infrastructure projects.

That is one point. Second point is, on a Q-on-Q basis, I don't think any peer has grown so much.

If you see our growth in terms of Q1 last year and this year, we've almost doubled and done 129%. I think we are doing as the industry is doing.

Even the best of the companies in the lot, one or two of them in fact have grown negatively. This is a cyclic thing which is more predominantly impacting medium voltage, but impacting all other manufacturers.

Operator

Thank you, sir. Sanjay, we request you to rejoin the queue for any follow-up questions.

We have our next question from the line of Manik Mahajan from Panacea Asset Management. Please go ahead.

Manik Mahajan

Hi. Thank you so much for the opportunity, and congrats on a great set of quarter.

I just wanted to understand from a customer mix or a customer concentration perspective, how much would you say roughly is Adani Group versus non-Adani?

Amit Bhatnagar

I think we told our...

Operator

Sorry to interrupt, sir.

Amit Bhatnagar

The present order book from Adani is around 40% plus. Our board mandate is to bring it down to 20% in the end of the year.

Presently, we are engaging with around 670 active customers across various verticals, and out of my outstanding order book position, there are around 200-plus customers. This is the spread of our customers.

Manik Mahajan

That's helpful. The margin guidance that you've given, 11% to 13%, is that the same for FY '28, and there's no operating leverage as you increase your utilization?

Amit Bhatnagar

If you see our cost, which was earlier 9%, has come down to 6.5% operations cost. Now if you compare this with any other cable company in the country, it is extremely low because what we make is per kilometer high-value product.

Our internal target is to bring it down to 6%. I think that would be a very good number.

Compare it with any other listed peer. The EBITDA guidance for the next year, we are confident we will maintain it between what I'm telling you today, but we will work on how to improve upon it.

Manik Mahajan

Okay. Thank you.

I'll go back to the queue. Thank you so much.

Operator

Thank you. We have our next question from the line of Rajesh Vora from Jainmay Ventures.

Please go ahead.

Rajesh Vora

Good morning, Amit bhai and the team. Congrats on terrific turnaround and super set of numbers.

As you have given the guidance at the peak revenue potential of ₹14,000 crores over the next few years, how would the revenue mix look like in terms of voltage, EHV, LV, exports, and data center, if you can give an idea? At that level, what margins one can expect?

Amit Bhatnagar

You would expect the conductor business to do between 30% to 35%, the low-voltage cable business to do between 10% to 15%, and the remaining 55% to 50% will continue to be in medium and extra-high voltage. Rating-wise, if I bifurcate, the LV cable 1.1 kV EBITDA is anytime between 8% to 9%.

Conductor is between 9% to 10%. Conductor, if the HTLS business we can grow, would see a one or two notch above what we are targeting today.

The medium voltage, 11 kV, should be around 14% to 15%. 33 should be around 16% EBITDA.

And 66 and above will depend upon the nature of the configuration of the product, but will be between 18% to 22%. Considering this, we are saying an average of 11% to 13%.

Rajesh bhai, you've been tracking the company very aggressively, I think you are one person who can tell all of the other audience that we have delivered whatever we have promised you for last two years.

Rajesh Vora

No, no, it's your team and efforts. What would be the percentage revenue from exports and data center when you get to ₹14,000 crore revenue mark?

Amit Bhatnagar

Data center, I told you, we are targeting 20%. For export, it is too early for me to put a number, because we have to test the waters properly.

That's why I put a number of ₹500 crores in the current year to get as an order, right? Once we are at the end of the year, I will give you a guideline for the next year.

Rajesh Vora

Sure. If I may ask, Amit bhai, the challenges, the rate at which you are growing, almost doubling, what are the two, three big challenges in terms of handling such a high growth, and what can go wrong?

Amit Bhatnagar

Every industry has its challenges, and some are macro and some are micro, right? The macro challenges are not in our control.

Things like the Iran war suddenly resulted in increase in polymer prices, the metal prices went up. You need to suddenly have 20%, 30% more of incremental working capital.

The macro challenges are not in our control, but fortunately, we have very strong promoters, right? When a promoter can put in ₹500 crores in working capital in a NCLT turnaround company, you can understand his confidence and stomach on putting money.

Such parameters on macro, we are fortunately insulated with the two promoters we have. In terms of micro, that is where we are diligently working, and that is where we have not said that we can go from now we have ₹1,600 crores, the logical thing would be, please use up your entire capacity in one year and become ₹8,000 crores.

We are not saying that, because when you produce more, you dispatch more. When you dispatch more, you have more challenges on the ground.

We are realistically growing the team, we are realistically growing the infrastructure, we are working on automation. This board has given me a special mandate this time how to use AI and how are we going to now increase the output with the same number of people.

Our technology team is working on IoT, on machinery. We are capturing the production at every stage in our production cycle.

A customer can come to our factory and figure out from which batch of raw material the cable has been manufactured, because we are dealing with extra-high-voltage cable where the customer is interested to know how I produce, but he is equally interested to know what quality of input has gone in. Considering these things, we are focusing on systems, processes, automation, AI, and you will see that the operational efficiency numbers going forward will show that.

Rajesh Vora

Great, Amit bhai. Thank you so much, and wish you all the very best.

Amit Bhatnagar

Thank you.

Operator

Thank you. Ladies and gentlemen, due to time constraints, that would be the last question of the day, and I now hand the conference over to the management for closing comments.

Amit Bhatnagar

I'd like to thank the investors for remaining present in very large numbers. We've been welcoming a lot of investors to the factory, and we would again be happy to have you guys back.

Your support in the QIP has really motivated our team, and we are confident that whatever confidence has been reposed on us, we would all strive to work hard. Our promoters also very confident, and we are working towards the targets we have promised to you.

Thank you very much, and see you back again the next quarter.

Operator

Thank you, sir. On behalf of Monarch Networth Capital, that concludes this conference.

Thank you for joining us, and you may now disconnect your lines.