Konstelec Engineers Limited

Konstelec Engineers Limited

NNSE:KONSTELEC
49.10
INR
+2.00
(+4.25%)
432.62MMarket Cap
Konstelec Engineers Limited
NSE:KONSTELEC
(National Stock Exchange of India)

Recent

price

49.10

P/E

ratio

- -

div

yld

- -

ROIC.AI

2021
2022
2023
2024
2025
2026
TTM
INR
69.47
70.89
101.59
183.94
128.13
139.33
- -
Revenue per Share
1.26
2.33
4.76
7.62
3.14
4.83
- -
Basic EPS, GAAP
-3.03
-0.07
-4.16
-23.76
-13.11
-9.27
- -
Free Cash Flow per Basic Share
- -
- -
0.07
- -
- -
- -
- -
Dividend per Share
33.59
35.92
40.99
62.26
65.35
70.18
70.18
Book Value per Share
33.52
35.87
40.96
62.21
65.32
70.15
70.15
Tangible Book Value per Share
15
15
15
12
15
15
15
Basic Weighted Avg Shares
1,049
1,070
1,534
2,153
1,937
2,104
- -
Sales/Revenue/Turnover
4.79
5.91
8.9
8.15
6.22
8.41
- -
Operating Margin (%)
9
8
8
10
11
18
- -
Depreciation Expense
19
35
72
89
47
73
- -
Net Income, GAAP
31.88
26.78
30.28
26.65
28.99
27.7
- -
Effective Tax Rate (%)
1.81
3.29
4.68
4.14
2.45
3.46
- -
Profit Margin (%)
431
462
544
825
844
941
941
Working Capital
28
27
60
43
43
85
85
LT Debt
507
542
619
940
987
1,060
1,060
Total Equity
- -
5.54
10.68
10.8
5.6
7.02
- -
Return on Invested Capital (%)
- -
6.52
10.82
10.94
6.48
7.96
- -
Return on Capital (%)
- -
6.71
12.37
11.44
4.93
7.12
- -
Return on Common Equity (%)

Capital Structure

INR

•

in mil. unless spec.
Mar'25
Sep'26
Mar'26
ST Debt
647
749
818
LT Borrowings
43
70
85
LT Finance Leases
- -
- -
- -
Preferred Equity and Hybrid Capital
- -
- -
- -
Shares Outstanding
15
15
15
Market Capitalization
920
1,006
433

Working Capital

INR

•

in mil. unless spec.
Mar'25
Sep'26
Mar'26
Total Current Assets
2,198
2,352
2,457
Cash, Cash Equivalents & STI
8
246
264
Accounts Receivable, Net
668
579
721
Inventories
- -
- -
- -
Total Current Liabilities
1,354
1,490
1,516
Payables & Accruals
- -
- -
- -
ST Debt
647
749
818
Deferred Revenue
- -
- -
- -

Growth Rates

INR

•

in mil. unless spec.

(avg. rate of change)

10 years
5 years
1 year
Total Equity
- -
17.06%
7.38%
Free Cash Flow
- -
1,208.89%
-29.39%
Net Income, GAAP
- -
43.98%
53.49%
Sales/Revenue/Turnover
- -
16.86%
8.61%
Total Cash Common Dividend
- -
- -
- -

Semi-annual Revenue

INR

•

in mil. unless spec.

Year

H1
H2
FY
2024
- -
- -
2,153
2025
- -
- -
1,937
2026
- -
- -
2,104

Semi-annual Earnings Per Share

INR

•

in mil. unless spec.

Year

H1
H2
FY
2024
- -
- -
7.62
2025
- -
- -
3.14
2026
- -
- -
4.83

Semi-annual Dividends Per Share

INR

•

in mil. unless spec.

Year

H1
H2
FY
2024
- -
- -
- -
2025
- -
- -
- -
2026
- -
- -
- -
Business
Konstelec Engineers Ltd. (KONSTELEC.NS) operates as an engineering, procurement, and construction/commissioning (EPC) contractor, delivering comprehensive project management, procurement support, detailed engineering services, construction, commissioning, operations, and maintenance for electrical infrastructure projects across industries including oil and gas, refineries, steel, cement, pharmaceuticals, textiles, power plants, ports, hospitals, healthcare, FMCG, and commercial complexes. Core offerings encompass electrical installations and testing; instrumentation and automation systems; power distribution and switchyard design, supply, erection, and commissioning; substation and LT/HT installations; solar power plant setups; building management systems (BMS) including security, access control, CCTV, fire alarms, PLC, and SCADA; conceptual design, FEED, detailed engineering, modularization, installation engineering, and start-up services; as well as procurement, fabrication, material management, onshore construction, and offshore installation. The company serves clients in India and internationally, with notable projects in Africa such as Nigeria, targeting industrial facilities, utilities, and infrastructure developments through tender bidding or direct orders. Konstelec Engineers Ltd., founded in 1995 and headquartered in Mumbai, Maharashtra, India, converted to a public limited company in 2023 and listed on the NSE SME platform following its initial public offering in January 2024. Recent developments include securing multiple high-value orders in 2025, such as a Rs 13.31 crore electrical and instrumentation work order from Reliance Industries for the Jamnagar wafer plant (completion by December 31, 2025); a Rs 45.65 crore letter of intent from Ajmer Vidyut Vitran Nigam Limited (October 2025); a Rs 80.84 crore electrical works contract from Numaligarh Refinery (announced December 2024, 18-month completion); a Rs 4.88 crore contract from Reliance Industries Jamnagar (completion by November 2025); a 33/6.9 kV substation project valued at an undisclosed amount (LoA April 2025, eight-month completion); and a Rs 25 crore infrastructure segregation project from AVVNL, alongside strategic pursuits in transmission and distribution, data centers, and railway sectors via joint ventures.