Operator
Thank you for standing by. My name is Jordan, and I'll be your conference operator today.
At this time, I'd like to welcome everyone to NorthWestern Energy 2025 year-end financials results webinar. All lines have been placed on mute to prevent any background noise.
After the speakers' remarks, there will be a question-and-answer session. If you'd like to ask a question during this time, simply press star followed by the number 1 on your telephone keypad.
If you'd like to withdraw your question, press star 1 again. Thank you.
I'd now like to turn the call over to Travis Meyer. Please go ahead.
Travis Meyer
Good afternoon, and thank you for joining NorthWestern Energy Group's financial results webcast for the full year ended December 31st, 2025. As Jordan said, my name is Travis Meyer.
I'm the Director of Corporate Development and Investor Relations Officer for NorthWestern. Joining us on the call today are Brian Bird, President and Chief Executive Officer, and Crystal Lail, Chief Financial Officer.
They will walk you through our financial results and provide an overall update on progress this quarter. NorthWestern's results have been released, and the release is available on our website at northwesternenergy.com.
We also released our 10-K pre-market this morning. Please note that the company's press release, this presentation, comments by presenters, and responses to your questions may contain forward-looking statements.
As such, I'll direct you to the disclosures contained in our SEC filings and the safe harbor provisions included on the second slide of this presentation. Also note that this presentation includes non-GAAP financial measures and information regarding the pending merger transaction.
Please see the non-GAAP disclosures, definitions, and reconciliations and the merger-related disclosures included in the appendix of the presentation materials. This webcast is being recorded.
The archived replay will be available shortly after the event and remain active for one year. Please visit financial results section of our website to access the replay.
With that behind us, I'll hand the presentation over to Brian Bird for his opening remarks.
Brian Bird
Thanks, Travis. Speaking about 2025, first and foremost, want to talk about how we've done in terms of executing on our strategic initiatives.
First and foremost, we announced our agreement with Black Hills Corporation for an all-stock merger of equals. We patiently waited and ultimately closed our acquisition of Avista and Puget Colstrip interests as of 1/1/26.
We recently submitted a $300 million or 131 megawatt South Dakota natural gas project to SPP's expedited resource adequacy study, and we are now including that project in our ongoing capital plan. We acquired the Energy West and Cut Bank Gas natural gas distribution assets.
On the legislative and regulatory front, we had very, very good outcomes in 2025. On the legislative front, Montana Senate Bill 301 was signed into law, providing greater competence for transmission investment in Montana.
Montana House Bill 490 signed into law, which clarifies and limits wildfire-related risks, protecting our customers, communities, and investors. Again, a very good legislative outcome in '25.
On the regulatory front, speaking of wildfire, we also as part of that legislation, we need to get our wildfire plan approved, and we did get that approval from the Montana Commission in 2025. Also on the regulatory front, we did complete our Montana electric and natural gas general rate reviews.
Then moving forward, thinking about the data center growth opportunities, during the year, we signed our third letter of intent with Quanica for 500-plus megawatts data center. We progressed with Sevey from a letter of intent to a development agreement.
That's 2025. More recently, and talking about financial results, and Crystal will get into that here shortly, but the financial results for the full year, we reported GAAP diluted EPS of $2.94 and our non-GAAP diluted EPS of $3.58.
We are increasing our quarterly dividend by 1.5% to 67 cents per share. We're initiating our 2026 earnings guidance range of $3.68 to $3.83.
We're updating our five-year capital plan to $3.21 billion, a 17% increase over our prior plan. Speaking of the merger with Black Hills, which we anticipate a closing in the second half of 2026, we filed joint requests for merger approval in the states Montana, Nebraska, and South Dakota, but we also filed with FERC.
We recently filed also our Form S-4 and joint proxy. Regarding the Montana IRP, we submitted our draft 2026 integrated resource plan here about a month ago.
From a Montana data center perspective, as of yesterday, we advanced our friends at Atlas Power from an LOI perspective to a development agreement. I'll speak to all of these topics a bit more after Crystal's presentation.
With that, Crystal.
Crystal Lail
Thank you, Brian. In my comments today, I will cover our fourth quarter and year-to-date results.
I will also cover, as Brian mentioned, our outlook for 2026 and our updated capital and financing plan. After listening to Brian there, it's been a really, really busy 2025 with a lot of accomplishments.
Our team has worked super hard to also deliver on our results for 2025, achieving 5.3% growth off of 2024 on a non-GAAP basis. We delivered GAAP earnings of $2.94, which included impacts of merger-related costs, the regulatory outcome rate case in Montana, and a very warm fourth quarter.
I'll describe those adjustments in further detail here on a later slide. Adjusting for those items, as I mentioned, we delivered $3.58.
That's the efforts after quite a few headwinds during the year to deliver upon our commitments to our shareholders. Moving on to slide 8, on an adjusted basis for the fourth quarter, we've delivered $1.17.
Our improved margin reflects new rates, a lot of regulatory execution involved in getting to those numbers, which were offset a bit by mild weather, as I alluded to in this fourth quarter very warm for us, and impacts of market prices in our Montana PCCAM mechanism. That margin improvement was offset by a one-time charge in the Montana rate review, higher operating costs, and operating costs certainly include merger-related costs as well, and then depreciation and interest expense increases as well.
Moving to slide 9 to talk about some of the adjustments for the quarter. Weather for the quarter was unfavorable by 3 cents.
When you compare that to a very mild 2024, however, compared to normal, weather represented a 13-cent impact to us in Q4. The quarter was also impacted by 3 cents of merger costs, the one-time charge for the Montana rate review outcome related to the Yellowstone County Generating Station and the disallowance of certain costs related to that was 38 cents, and 3 cents related to the PCCAM, reflecting the final order there reflecting cessation of the sharing amount there, offset by a 12-cent tax benefit.
You'll see that resulted in the $1.17 of adjusted earnings compared to $1.13 in the fourth quarter of 2024. On a year-to-date basis, moving to slide 10, our performance is driven by again that improved margin driven by regulatory execution, offset by detriments of PCCAM within that of 9 cents from a full-year basis.
On an O&M perspective, certainly higher given new maintenance at the Yellowstone County Generating facility and some maintenance at our other electric generation, the amount we're spending importantly on wildfire mitigation, and also insurance that has increased in labor and benefits. We also incurred higher depreciation expense of 27 cents and interest expense of 23 cents.
One item I would highlight on the slide is that taxes in the current period includes a 12-cent benefit, while 2024 included a 39-cent benefit, which is a good segue to the next slide 11 to hopefully give you clarity on quite a few things that moved within our earnings from a 2025 full-year basis. Weather again was unfavorable by 5 cents compared to normal weather.
That was 18 cents of detriment for us as we think about our impact of results for 2025. It was a very mild back half of 2025.
Most of you won't recall, but we actually started the year through first quarter with favorable weather. That reversal was really significant for us and impacted also as we'll talk about later cash and the impacts to financing plans.
In addition, merger-related costs were 15 cents, and the Montana rate review disallowance I spoke to was 38 cents, which notably we have sought reconsideration of that disallowance, but we do not have a clear timeline as to when we might see any impact of that. That would certainly be a 2026 item if so.
In addition, I spoke to tax benefits and quite a bit of noise within our tax number between last year and this year. There was 12 cents of discrete items benefit in 2025, and that compares to, if you'll recall, 2024 we had 28 cents in the prior period.
All of that, if you'll follow the slide along, gets us to $3.58 of adjusted earnings for our 2025 number, which as I alluded to earlier, was 5.3% of an increase over 2024. My comment there is, given the significant headwinds, we talked about the headwinds in our financials from our PCCAM mechanism, which again I'll take a positive out of the Montana rate review outcome indicating that the sharing part of that will be suspended on an ongoing basis.
That's important, but that was about 9 cents of impact to us in 2025 total, which we've adjusted out the fourth quarter here. Then also property taxes being higher.
We collect a significant amount of property taxes through our rates. Those increased, and we only recover a certain portion of that between rate cases.
Those were pretty significant headwinds for us during the year. We are pleased, on top of the mild weather that I've talked about in the ongoing impact to our financials, we are pleased at delivering $3.58 for 2025.
Slide 12, looking forward, from a guidance perspective, we are initiating earnings guidance in the range of $3.68 to $3.83 per share, which represents 5% growth at the midpoint off of our 2025 results and remains anchored to our 2024 base. A significant part of that is moving to slide 13 and updating our capital plan.
Brian mentioned the inclusion of the 131 megawatt generating facility in South Dakota. Also we've updated to include our incremental Colstrip ownership.
We're very proud of closing those transactions effective January 1, 2026, and being resource adequate to make sure that we can serve our customers. Those two things drive a 17% increase in our overall capital plan over what we've reflected before.
You'll recall our dedication to having a self-funded capital plan and only issuing equity when it is accretive on an ongoing basis. I would tell you that the base capital plan that underlies the $3.2 billion you see here continues to be self-funded.
With the incremental South Dakota generation investment reflected here, we do expect to need equity beyond 2026 to fund that investment, which we expect if you think about that to be on a 50/50 debt-to-equity basis that we would manage that incremental capital. That's consistent with our overall commitment to maintaining high credit quality in our ongoing plan.
Moving to slide 14 to talk about financing for 2026. Again, I just mentioned that the incremental South Dakota generation investment, that would be beyond 2026.
We expect to issue debt to refinance existing maturities and fund our existing capital plan. We closed out 2025 at a lower FFO to debt.
That was driven by the things I mentioned earlier of the combination of lack of margins from very mild weather affecting our cash flows and also being significantly undercollected as supply costs on the Montana side. Those two things really drove us closing out the year at a lower level than we would like to, but we remain committed to getting above and staying above our downside thresholds.
With that, I will turn it back to Brian.
Brian Bird
All right. Thanks, Crystal.
On 16, we speak to the merger with Black Hills and the benefits really to all stakeholders and obviously the strategic combination represents a highly attractive value creation opportunity for both companies. On this slide, it really speaks to certainly from a shareholder perspective, but also customers.
Why don't we start with shareholders, increases scale, position, and growth. Think of moving two companies from a 4% to 6% EPS growth to 5% to 7%, doubling of each company's rate base totally approximately $11 billion.
Both companies having significant growth opportunities and the ability to take advantage of this merger to truly capture those. As it points out a little bit lower on the slide, as a larger company will be able to expand our investment opportunity.
I should also acknowledge it reduced risk as a larger company. With risks like wildfire risk, another risk that we have in our business, we certainly can sustain those as a larger organization.
Also strengthen the balance sheet and credit metrics. You heard Crystal speak to that just a moment ago.
Obviously as a combined entity, we have the financial wherewithal to invest more in our businesses as a larger company and do that cost-effectively for our customers. Lastly, enhance business diversity.
Not one entity will have more than a third in terms of representation by jurisdiction. I think the largest would be approximately 31% for a particular jurisdiction, but also a very, very good mix of electric and gas.
What makes these two great companies both combo utilities even stronger as a combined entity. Then the center of this page, and this is really the center of all we do certainly at NorthWestern and also speak for our friends at Black Hills, we think about our customers and the substantial long-term value for our customers for bringing these two teams together who are very complementary.
We both provide excellent customer service to our customers and a great operators. I will tell you the savings generated from putting these two companies together ultimately accrue to customers in future rate review proceedings.
Obviously in this time when people are thinking about affordability, our two companies are thinking about that certainly as we contemplate this merger on a going-forward basis. Moving forward in terms of a timeline, I had mentioned earlier that we filed joint applications for approval in three states: Montana, Nebraska, and South Dakota.
We did that Q4, and we have hearings expected in the second quarter of '26 for those states. We also filed at FERC in Q4 of 2025.
We filed our S-4 joint proxy statement on January 30th, and we have shareholder votes both scheduled for April 2nd. Beyond that, we've also started our integration planning effort, and we do expect approvals and closing in the back half of 2026.
Moving forward kind of thinking about large load customers and obviously that leads you to discussions around data centers. On page 18, I mentioned the far right, you see the Montana large load opportunities.
First and foremost, Sevey, I'm sure you've been reading about they've had some issues in terms of their project. They have two sites certainly that they're considering, and right now, they've got a favorable vote here recently to move forward.
They're still looking at the land concerns and are dealing with those issues. They have land both in Butte and Anaconda that they're considering.
We continue to work through them as they work through those challenges. We have a development agreement, and we expect to get to an ESA here hopefully by the end of Q2 2026.
Also we announced here recently Atlas. Atlas Power, we've moved from an LOI to a development agreement, and they have been moving much, much quicker.
Gives good signs I think from an offtaker or a customer from their perspective. They're getting ready to move forward.
That's good news for us with that development agreement. I would just tell you in the benefit of development agreements, these two entities now are putting skin in the game.
Let's think of upwards of $500,000 of investment, if you will, for all the studies that are necessary that we need to complete this utility. Skin in the game, if you will, for those two entities as we move forward.
I expect at least one of those ESAs to be completed for those two by the end of Q2 2026. Quanica also making great progress and hopefully we'll see a development agreement from them relatively soon.
As I think about the two states that we provide electric business off to the left, one thing I would say about Montana, we ultimately hope to serve these large load customers on a state jurisdictional basis. When we have an ESA with one of these parties, we'd like to make a filing with the MPSC along with a large load tariff that protects customers, and we'd like to think we're going to do that here in the first half of 2026.
Regarding South Dakota, there is a significant indication of interest by data centers in the state. The benefit there is any new large load customers that require incremental capacity, we have infrastructure riders that can help us with that generation cost recovery.
Also the South Dakota PUC has an established process for large load customers with a deviated rate tariff. The last thing I'd say about South Dakota as we sit during this legislative session, we're waiting on sales tax reform in the state, which is something that is very, very important to data centers before they move forward in South Dakota.
Watch that in the coming weeks. The second slide I'd have on data centers, slide 19, the middle of that slide shows letter of intent and development agreements, obviously moving from two letters of intents and one development agreement to one letter of intent, two development agreements.
Shows progress there. We'd like to move all of those over into the ESA category to the right here relatively soon in 2026.
To the far left, I would also talk about data center requests and high-level assessments. You may note that the cue count is actually down a little bit there.
I think what happens there's a lot of developers here, and they get to a certain point, and if they can't move forward and fast enough, can't find an offtaker or a customer, that count can reduce. Not necessarily surprised.
I think from a high-level assessment, where there are some in there, we believe certainly can move into that middle category of letter of intent, development agreements. We're excited there.
If we do see some sales tax movement in South Dakota, I expect both of those cue counts to actually go up in 2026. Moving forward on Colstrip, happy to announce as I announced earlier that we've closed those two portions of Colstrip.
In addition to our owned 222 megawatts, we've added the Avista 222 that not only allowed us to achieve resource adequacy in Montana, but increased our ownership from 15% to 30%. Knowing that we had not much control certainly as a 30% owner, matter of fact we didn't have control of the facility as a whole, the incremental Puget piece did two things for us: it moved us from 30% to 55%, giving us that ability to drive strategic direction for the overall facility, but also gave us the ability now to serve large load customers.
Both of those interests are closed, and those interests are operating well for us. We're excited to have them in the fleet.
I'll tell you what, I sleep much sounder when cold weather does come to us in Montana and South Dakota. One thing I'd just say real quickly about Avista and Puget, I think you're well aware, we acquired both of those units for zero, which is a fantastic thing for our customers certainly from an affordability and reliability standpoint.
We do need to cover our operating costs. In Montana for the Avista portion, we filed a temporary PCCAM tariff waiver with the MPSC in August.
That would provide a near-term cost recovery that is expected to largely offset the 18 approximately $18 million of incremental annual operating costs. That waiver, by the way, was temporarily granted in January 2026.
Hopefully we'll learn more about that waiver in '26, hopefully get full recovery for the full year of those operating costs at some point in the future. From the Puget perspective, we signed a contract in October of 2025 to sell that electricity through late 2027, think of when data centers could come on in the state.
That revenue from that contract is expected to largely offset the approximately $30 million of incremental annual operating costs resulting from the transfer. I think you're well aware we filed with FERC for cost-based rates in October 2025, and we expect approval from that filing in the first quarter of 2026.
Lastly, on the NorthWestern value proposition slide, you might have noticed two changes on this slide. The first, Crystal talked to, is the 17% increasement in investment over on the right-hand side up to the $3.21 billion.
The second is noting the dividend yield at the top of the page. You might recall that used to say 4% to 5%.
I'd argue today we shouldn't say it approximately 4%. Keep that in mind as you think about our base plan on the left, but then our incremental opportunities there in the center.
From a base plan, taking that dividend yield plus our 4% to 6% EPS growth, you're looking at an 8% to 10% total return just doing what I'd argue utilities are typically doing from electric and gas distribution, transmission, supply investments. This is kind of bread-and-butter utility investment.
Even with that, thinking about an 8% to 10% total return, and obviously we're able to capture any data center growth, any FERC regional transmission, any incremental generating capacity, that return can certainly go over 10%. With that, from a conclusion perspective, I think you've seen this conclusion slide for many years.
I'm just going to turn it over from Q&A perspective.
Operator
As a reminder, if you'd like to ask a question during the question-and-answer session, simply press star followed by the number 1 on your telephone keypad. Your first question comes from the line of Shar Pourreza from Wells Fargo.
Your line is live.
Good afternoon. This is Whitney on for
Crystal Lail
Shar.
Brian Bird
Hello?
Hi. Thank you for the update and great capital plan rolled forward.
My first question is previously you indicated that you file a large load tariff in 4Q to ring-fence costs for new data center loads. Can you update us on the timing and scope?
What's changed versus [prior?] and stakeholders should expect a filed tariff at PSC?
Crystal Lail
Whitney, you're cutting out a little bit, but I'll take that question. We had said we will file a large load tariff, but I would note that that was tied to signing an ESA.
We want to go hand in hand to file a tariff with a specific contract. Part of that conversation, we have an existing GS-2 tariff today.
We think we could serve customers off of that tariff, but you want to strengthen that tariff and certainly get ahead of this argument that data centers aren't paying their fair share, etc. We expect to file that once we have a signed ESA so that we can walk through the specific mechanics with the Montana Commission of what that looks like and why indeed they pay their fair share and likely contribute broadly to the system benefits.
Once we have a signed ESA, we will plan to file that large load tariff in sync with that.
Brian Bird
Only thing I'd add to that as I said in the presentation, there's an expectation we would do that by the end of the second quarter. The reason being, that's when I expect an ESA to occur.
I would say that the tariff is ready to go. We're waiting from an ESA perspective.
Sounds good. Hopefully I'm much more audible now.
Just for another follow-up on the merger, there's been focus on large load data center cost causation. Stakeholders need or want education, not just on the process.
Can you give us an update on how the education plan to stakeholders to demonstrate no harm and affordability has been so far? That's it for me.
Brian Bird
I think you're talking from a public process perspective. I think where data centers have gotten quite a bit of attention, as you're well aware, throughout the country.
I would argue in Montana in the community of Butte, obviously most of the discussion because Sevey is furthest along in the discussion there. I think the Butte-Silver Bow allowed a lot of conversation the community ultimately voted 9 to 3 letting Sevey move forward.
I think I would argue that the data centers are getting to be more vocal talking to the benefits. We utilities certainly have been supportive of that effort.
I think what we need to demonstrate, all of us need to demonstrate is from a tariff perspective, and that's our plan is in and allow the MPSC to approve a tariff that we would put a tariff in front of them that's going to protect customers. I think when customers understand that, they're going to feel much, much better about it.
Obviously they're reading what's happening in other parts of the country and how customers have been impacted by data centers, and it's easy to jump to conclusions. I think there's been a decent dialogue about this topic.
Certainly I and others have been out talking about it. I'm not saying it's going to be easy either for data centers, but I think thus far we're making good progress with Sevey and Atlas.
Quanica, I know is out there talking about this as well. Feel pretty good about where we're at.
Operator
Your next question comes from the line of Aidan Kelly from J.P. Morgan.
Your line is live.
Aidan Kelly
Hey, good afternoon. Just wanted to touch on the load front first, if I could.
It seems like there's been a number of quarters in the past, that we've been waiting for an ESA. Brian, you mentioned in your prepared remarks, some friction on the landing considerations with Sevey perhaps going longer than expected.
Do you see this issue kind of percolating to other prospective loads, such as Atlas and others? Then just in general, what do you think is needed to push these development agreements into the goal line at this time?
Brian Bird
I think you've seen and I'll take a bit of a mea culpa here myself. I think we, thinking at ESAs, we at times were the hold-up to getting these ESAs done, and we're ready to go from our perspective.
Then unfortunately for Sevey, they ran into this land issue. Obviously they're working through that.
I think this is not just on the utilities to get these things done. In many cases, developers also need to find customers.
Before they're ready to sign ESAs, sometimes they need to have that done. It's much easier for hyperscalers, of course, who don't need to find customers.
I do think that Sevey is working awfully hard to get to an ESA. Atlas obviously moving to a development agreement.
The next step is to get to an ESA. I've seen that's taken a little bit longer naturally for this process, and certainly it's impacted a speed here.
I'm also very confident in terms of where we sit with these three providers today, these potential data centers. I feel very good about where we ultimately will get to.
Aidan Kelly
Got it. Makes sense.
Then just turning to the growth outlook, if I could. I see you reaffirmed the 4% to 6% rate base CAGR post the South Dakota plant, which I believe is directionally around maybe $300 million in CapEx.
Then obviously you mentioned in the remarks that perhaps a 50% equity source. I guess my question would be, what do you see as the offsetting factors to that share dilution that kind of gives you the confidence of that reaffirmed 4% to 6% EPS CAGR?
Crystal Lail
Sure. The great thing about and we've talked about this, what are the incremental opportunities to the right side?
The incremental generation in South Dakota, we recover cash during construction. There's a phase-in rate plan rider that allows us to recover.
AFUDC's great if it's accretive to earnings, but it isn't accretive to cash. As we've talked about how do you finance those things a long time, the opportunity that presents itself with meeting the resource adequacy requirements in SPP, owning that generation here and building that facility, that's the right kind of incremental CapEx that we've looked to layer into our plan.
We're excited to do that. That's certainly the kind of stuff that gives us confidence to maintain or even push upward on our earnings range while also financing that in terms that makes sense.
That's where we've been pretty clear. That's the type of incremental CapEx we were looking for.
That's incremental to our base plan. We'll fund that in 50/50 kind of approach.
We'll recover cash during construction with the phase-in rate plan. Then obviously ultimately see growth off of earnings out of that once it's in service.
Aidan Kelly
Great. Thanks for the insight.
I'll leave it there. Take care.
Brian Bird
Thanks, Aidan. Thanks, Aiden.
Operator
Your next question comes from the line of Nicholas Campanella from Bank of America. Your line is live.
Brian Bird
Hey, Nick.
Nicholas Campanella
Hey, how are you? Thanks for taking the questions.
I just wanted to kind of clarify in the overall ESA strategy is also my prior understanding was that the system is long, you may not need for the first couple deals, a dedicated framework to pay for the depreciation, the interest, and what would be associated with new build. Just this ESA will inform how you propose an overall tariff for all of that in this upcoming first half here?
Is that just the general strategy? I'm sorry to make you go back and repeat yourself.
Brian Bird
I think it is an example for how we want to make sure we're protecting customers. I think the discussions we're having with data centers, they want to protect customers too, the folks that we're certainly talking to.
Going hand in hand with them with an ESA and a tariff that is the plan and that's again the plan by the first half of 2026.
Crystal Lail
Nick, I would add on to that just every data center is site-specific. Some of them, to your point, we are long generation, what is the transmission needs, what is maybe some of them are not much CapEx.
All of that we do have an existing tariff. I know we talked about that a year ago.
We felt like we can serve customers under that. We do still today.
As the national narrative on data centers has changed a bit, and there's a lot of what I would call misinformation about what they can do to certainly help shoulder the cost of the grid and, in fact, subsidize some of your other customers. I think everywhere you're going to see commissions want to understand that better.
We got feedback from the Montana Commission, and we certainly want to be transparent with them and bring that forth so that you have a positive construct under which you're doing that. While each one's unique, bringing something forth that demonstrates the value that a data center can have, a large load facility can have on the grid and that they are indeed paying their fair share.
While we would be comfortable serving them under our existing tariff, I think there's also a lot of value to making sure your regulators are understanding that and of course then the public sentiment around that maintain positive.
Brian Bird
One thing on that too, Crystal, you sparked a thought for me. I think this issue of protecting customers, I think there's been a confusion around why the Puget portion was put into a FERC-regulated entity.
Our intent here is actually protect customers. The need here really for the Puget piece, we needed it to get control of the facility.
From an energy perspective, we certainly didn't need it until the 2027 timetable. Instead of imposing $30 million of cost on our existing customers, we found a means to deal with that and protect customers while that's in a FERC-regulated entity.
If our hope is, as I mentioned earlier, ultimately to move that into a state-regulated entity when we have large load customers we can serve through that. That is ultimately what we're trying to do.
We'd love to see everything on a state-regulated basis, but we do want to serve large load customers in any way that is best to serve our customers today.
Nicholas Campanella
Thank you. Thanks for the updated thoughts there.
I appreciate it. Then maybe just going back to the financing plan quick in the prepared, you just kind of mentioned the 13% FFO to debt.
Is all incremental CapEx at this point going to require some equity now? Just can you talk a little bit about if these ESAs materialize and you get this load on the system, how that changes the equation around the financing for you guys?
Crystal Lail
Sure. We've said repeatedly that we size our base capital plan based off our cash flow availability and to hit our credit quality metrics.
Obviously, I mentioned 2025 the key drivers there of falling below the 14% FFO is lack of cash. That comes from the very mild weather and the margins we would have expected to have and then also material undercollection in the Montana supply tracker.
I think that's around $80 million. We expect that to come back in 2026.
We're always planning our capital plan to maintain a solid balance sheet and have credit quality. Your question of what happens with incremental capital, and again, as I alluded to, the Aberdeen Generating Station, we recover cash during construction of that.
If you think about the ramp period of any data center and incremental capital that would be required there, you'd have a very similar funding mechanism that you see cash during construction. That's the kind of stuff that's accretive, and we certainly would look to issue equity for that kind of accretive growth.
That's where we've had a dividing line all along is we will be very disciplined about our base capital plan. That's a regulatory lag.
That's 18 to 24 months off of putting that in the ground to recovery for that kind of stuff. We need ongoing cash flows to support that.
For stuff that drives growth, as anything large load would, that's the type of stuff we'd look to maintain equity issuances where that makes sense. Again, nothing in '26, just to make sure I was clear.
It would be 2027 and beyond.
Nicholas Campanella
Nothing in '26. Thanks for the time.
Thank you.
Brian Bird
Thanks, Nick.
Operator
Your next question comes from the line of Paul Fremont from Ladenburg. Your line is live.
Paul Fremont
Thank you very much. My first question has to do with for the South Dakota plant, are you in the cue for a turbine?
What would be the commercial operation date of that plant?
Brian Bird
I'll start with the commercial operation date. We have a plant in construction now.
I think you're speaking to the 131 megawatts,
Paul Fremont
that
Brian Bird
$300 million investment. We're already making an investment in '26 for turbines.
I'd say approximately a third of that investment will be made in 2026 to get our turbines in place, and the plant is expected to be completed in 2030.
Paul Fremont
Okay. You're in the cue, or the turbines are lined up for that 2030 in-service date?
Brian Bird
We're buying turbines.
Paul Fremont
Okay. My next question has to do with if the endangerment finding is reversed at EPA, does that change the potential investment in environmental upgrades at Colstrip?
Can you also update us on where things stand in terms of environmental upgrades?
Brian Bird
I think obviously we'll do whatever we need to, in essence, to keep Colstrip open as long as it's economic. Obviously if we're forced to do something we think is not necessary, we would probably invest in a gas plant if we're required to do something sooner rather than later.
It has always been our hope here with this investment in Colstrip, we can keep that plant open and operating through the depreciable life that we expected into the 2040 timetable. Again, hopefully that technology, possibly nuclear, possibly long-duration storage, whatever that is, to help us replace Colstrip with something that's cleaner.
If we're forced to do something sooner, either investing in environmental controls, if you will, or ultimately building a gas plant, we will do that too. We need to serve our customers with Colstrip or its replacement.
It's hard to answer that question today, Paul, until we see ultimately what's happening. I have to say what we're expecting of the administration certainly helpful for our long-term plans for Colstrip at this point in time.
Crystal Lail
I would also just clarify our five-year capital plan, we did roll in Colstrip-related CapEx, but that's maintenance CapEx, Paul, is how I would refer to that. There's no material environmental CapEx in that number.
If something changes over time, certainly we'd talk about that at the time. We've talked about the MATS ruling previously and how that might impact Colstrip, but we never had any numbers in our capital plan related to that.
Paul Fremont
Is there any update in terms of whether those rules will be voted on or applied by the EPA, or for the time being, should we just assume that nothing is moving forward along that front?
Brian Bird
I think we've been expecting to hear something on this any day now. I guess until we actually see what the rules say, I'm kind of hold off on how to respond to that.
Paul Fremont
Then lastly, any updates on the remaining portion of Colstrip ownership where the parties most likely will need to divest their ownership interest?
Brian Bird
Paul, we just grabbed these two pieces from Puget and Avista, that 592. We're extremely happy with those.
We'd like to certainly understand how the Commission looks at it and ultimately how things are working out with data centers. We're extremely happy with being able to get to 55% ownership, and I'll stop there.
Paul Fremont
Right, but theoretically, how would those costs be picked up if the other owners were forced to exit?
Brian Bird
Are you talking environmental costs that have to be applied? What are you talking?
No,
Paul Fremont
in other words, if the other partners are forced to exit the plant ownership because of state laws, then what would happen to their share of the operating costs? Would they, I guess, still be on the hook for that, or how would that work?
Brian Bird
I think they would be in a tough spot. I'm guessing all of them are looking for means to exit other than Talen doesn't need to exit.
I'm sure they're talking to folks about that.
Paul Fremont
Great. That's it.
Thank you very much.
Operator
Your next question comes from the line of Rex Savage from Clear Street. Your line is live.
Rex Savage
Hi, thank you. I wanted to ask just quickly on merger state regulatory, we've seen a bit of a delay in South Dakota.
Was curious if there's anything to be concerned about there. In the Montana review, it looks like some of the interveners have made the claim that the application is incomplete, perhaps because there's not a benefits study that's in there, maybe for other reasons.
Do you feel comfortable with the Montana timeline as it stands, or might we also see a delay in Montana? Thank you.
Crystal Lail
Sure, I'll take that one. First your question with regard to South Dakota and the timeline there.
South Dakota has a six-month statute, which I would acknowledge is a bit of a quick shot clock on getting through all the process and procedure and making sure they're comfortable with that. We are working with staff on resetting a bit of an extension to that procedural schedule.
I don't have any concerns there. They're asking the right questions and going through the right process.
They just need a little bit more time, and they would have been in front of both Nebraska and Montana. We're working with them on resetting the procedural.
I still think that they'll likely in the end be well ahead of Montana order even with a revised procedural schedule. No concern there.
You've also seen it progressing in Montana, and what I would say is a bit normal given the nature of the interveners there and who they are. We've responded to the motions there.
You also saw intervener testimony come in, and overall again, exactly as we would expect the docket to progress. There's comments as to maybe commitments that we could make, what they'd like to see to better understand that.
We do certainly recognize that each of the jurisdictions we serve, not just the ones we're in, a big part of your local commitment is your utility, and we want to make sure and work through that in the right sort of way. I wouldn't say there's any concern in how those dockets are progressing.
The concerns expressed are I think typical for each of those interveners, and the intervener testimony I think paints a path forward the direction of the things they'd want to make sure are considered in an eventual outcome.
Rex Savage
Thank you. As a follow-up on Montana, I believe you're going through this IRP process now as well.
How does that, if at all, fit in to the review? Maybe not necessarily review directly, but the timing of the review for the deal versus the review of the IRP?
I believe the final draft is due in maybe a couple of months, but please correct me if I'm wrong.
Brian Bird
No, the IRP is out, and folks have had a chance to see it. I don't anticipate there's any connection between the IRP and the merger process.
Rex Savage
Thank you.
Operator
That concludes the question-and-answer session. I'll now turn the call over to Brian Bird for closing remarks.
Brian Bird
I think Crystal pointed out earlier on the call, it was a really very, very good '25. Obviously, we ran into some issues in terms of the rate review and outcome there.
I think we can think about the revenue requirement associated with that that certainly continues to help us invest as those things we need to continue to provide good service to our customers. If you think about our ability to certainly announce the merger and all the work we're doing with our friends at Black Hills to get that across the goal line, think about our ability now to have Colstrip to be resource adequate in Montana.
Certainly in this age when people are certainly very, very concerned about reliability and affordability, to feel much, much better about that in terms of how we serve our customers. Also thinking about longer-term, how can we continue to make the investments we have, but also earn the appropriate returns we have for our shareholders.
I think 2025 set us up very, very good for that on a going-forward basis. With that, just want to thank all of you for your support of the company and your interest in what we're doing here at NorthWestern.
We certainly want to thank everyone at NorthWestern for all the hard work in 2025 as well. With that, we'll say thanks.
Operator
That concludes today's meeting. You may now disconnect.