Operator
I would now like to hand the conference over to Chief Executive Officer and Managing Director, Barrie van der Merwe. Please go ahead.
Barrie van der Merwe
Thank you, Travis, and good morning, everyone. Thanks for joining us today.
Nothing is more important than ensuring our people return home safely every day. While we continue to work through initiatives to improve both our TRIIR and severity rate, we recognize there is much more to do.
Through our leadership development program, continued focus on critical controls and management verification thereof, risk assessment and management, as well as frontline engagement, we are committed to building a strong safety culture. As at 30 September, the group TRIIR was 1.42, up 6% from 1.34 for the June quarter, and we continue working to drive this trend down.
When we spoke in July, I outlined our reset plan. We discussed changing the mine plan to improve productivity and cost, reducing execution risk, establishing appropriate inventory buffers, improving operational stability, while prioritizing margin over volume.
During the September quarter, we started to see some benefits of that work. Curragh ROM production reached its highest quarterly level in six years.
Strip ratios reduced, mining costs reduced, inventory levels increased, product quality and mix improved, and earnings rose. These are all leading indicators that the reset is working.
If you look at the business today, Curragh ROM production is no longer the primary issue. We produced 4.2 million tonnes during the quarter, the highest since September 2020.
The opportunity and work now is to convert that into saleable, high-margin met coal tonnes through improved CHPP throughput, recovery, and operating consistency. The revised Curragh mine plan is delivering the outcomes we expected.
Open-cut mining performance improved, strip ratios reduced, and lower waste movement in the south translated directly into lower costs. Mining cash costs also reduced by approximately $18 million q-on-q, as lower strip ratio coal in the south reduced overburden movement and improved productivity.
This will help us to invest in waste mining in the north next year to continue setting it up for increased productivity. We also built inventory during the quarter.
Curragh ROM inventory increased by 600,000 tonnes to approximately 830,000 tonnes at the end of September. As part of the reset strategy, these inventories improve system stability, provide continuity and flexibility ahead of the wet season, and create future saleable production as CHPP performance continues to improve.
We are starting to see improving reliability and runtime of the CHPPs, and some benefits are flowing through into higher-value metallurgical coal production, as is evidenced by the 200,000 tonnes more HCC production q-on-q. There is still good opportunity remaining in the CHPPs, with targeted improvement of about 10% in uptime and rate, as well as a yield uptick to be achieved over the coming months.
This work is focusing on automation of raw coal reclaimers to achieve improved feed rates, updating the plant control logic to optimize sequence, performing key critical equipment repairs, improving maintenance workflows, and updating operating guidelines and trigger action response plans. We are adopting a programmatic approach to plant improvement.
Our open-cut mining is delivering close to the required level, and the CHPPs are catching up to unlock the inherent value. On Mammoth, progress remains slower than what we had hoped.
The mine continues to be impacted by extensive faulting in two panels, and as a relatively new underground operation, we continue to build our understanding of the geology. While this has affected development rates and production outcomes during the year, we remain hopeful in the long-term potential of this asset.
The operator, Eclipse, has implemented a detailed improvement program with our support, and there is significant focus on improving productivity, development rates, and operational consistency, together with associated management changes to drive the plan. While further improvement is required, Mammoth remains an important source of potential future upside for our business.
Turning now to Buchanan. The most significant factor affecting group performance during this quarter was the geological fault encountered in the south longwall, one of the two panels operated at this mine.
The resulting roof conditions reduced ROM production by approximately 700,000 tonnes relative to the June quarter, and materially affected production of premium low-vol met coal products. The disruption also increased operating costs through additional support requirements and void fill activities, while reducing the operation's ability to recover fixed costs across the production base.
This issue has now been successfully worked through, and learnings embedded for the future. This should be viewed as an isolated event that is not expected to recur at the same scale.
The operation has progressed through the faulted area, longwall advance rates have returned to normal, and we do not view the quarter's performance as representative of the asset's underlying quality, capability, or long-term economics. Despite these challenges at Buchanan and Mammoth, and with more opportunity remaining in the Curragh CHPPs, the group generated approximately $44 million of EBITDA earnings during the quarter.
This was our strongest quarterly earnings performance since the June quarter of 2024, and a substantial improvement on the $7 million delivered in the previous quarter. The improvement was driven by three—by four key factors.
Firstly, realized pricing improved as benchmark metallurgical coal pricing strengthened, and our product mix continued to improve. The PLV index was up about $10 per tonne quarter-on-quarter.
It is currently up a further $20 a tonne, boding well for the December quarter. Secondly, the Curragh reset is delivering lower costs.
Lower strip ratio mining and improved mine plan execution reduced waste movement and improved productivity. Mine cash costs were down about $18 million quarter-on-quarter.
Thirdly, there are early benefits from improved plant uptime and operating stability, resulting in greater production of high-value met coal and reduced reliance on lower-value thermal coal sales, with 200,000 tonnes more HCC produced quarter-on-quarter, contributing to a 2% improvement in the group's realized price relativity to the index. Lastly, we built a further 600,000 tonnes of ROM stock at Curragh to improve system stability and set us up for the wet season.
These outcomes provide further evidence that the reset strategy is moving the business in the right direction. As we are in the final quarter of the year and the reset program is starting to embed, we are updating our FY '26 guidance.
We expect saleable production of between 14 and 14.5 million tonnes, and mining cash costs of between $105 and $110 per tonne for the full year. This revision does not reflect a deterioration in the underlying quality of our assets.
The open-cut mining system at Curragh is performing better than it was six months ago, and Buchanan had an isolated geological issue. Overall ROM production is stronger and more resilient.
Inventory levels are appropriately higher. The product mix is improving, and the mine plan execution is also improving, with costs reducing.
Rather, this revision reflects the impact of a slower ramp-up at Mammoth, predominantly driven by geological conditions referred to earlier; the ROM impact at Buchanan during the September quarter; and the time required for the reset plan, in particular CHPP performance, to fully translate into saleable met coal production; as well as our deliberate decision not to bypass coal that can later be washed to yield higher margins. Also, a stronger AUD and higher diesel costs, which is outside our control, drove costs up materially, and Sandeep will unpack this later.
We focus on margin, not total product tonnes, and as I said before, we are not chasing a total tonnage number at the expense of mix. In the September quarter, we produced 3.4 million tonnes saleable production, down 700,000 tonnes quarter-on-quarter, yet EBITDA improved materially.
By year-end, we expect to have more than 1.5 million tonnes of ROM inventory at Curragh, setting us up well for the wet season, as well as overall system stability into the new year. Before I hand over to Sandeep, a quick word on markets.
The met coal market remained constructive throughout the September quarter. The Australian PLV HCC benchmark averaged approximately $248 per tonne during the quarter, compared with approximately $238 in the June quarter.
Pricing has strengthened further since the quarter end, and we expect good flow-through of higher prices into December. While near-term market volatility will undoubtedly remain, the medium-term outlook continues to be supported by steel demand growth in India, constrained global supply growth, and the lack of significant new met coal developments globally.
We continue to believe the outlook for high-quality met coal remains attractive. I'll now hand you over to Sandeep to discuss the financial performance, liquidity, and balance sheet.
Sandeep Deoji
Thank you, Barrie. The September quarter represented a step forward financially, despite lower production and operational disruptions at Buchanan.
The most important outcome was the significant improvement in earnings. As Barrie mentioned, the group earnings increased from $7 million in the June quarter to approximately $44 million in the September quarter, our strongest quarterly result in more than two years.
This improvement was driven by higher pricing, lower mining costs at Curragh, improved product mix outcomes, and the build of unsold coal into inventory, including our decision not to bypass ROM production as low-value thermal coal. Coal revenues increased to approximately $558 million in the September quarter, compared with $506 million in the June quarter.
Group realized met coal pricing increased to $184 per tonne, compared with $171 per tonne in the prior quarter. Australian realized met coal pricing improved to 75% of the PLV benchmark, up from 72% in the June quarter, reflecting continued progress in product mix optimization.
On costs, total mining cash costs at Curragh were around $18 million lower than the June quarter, reflecting the lower strip ratio under the revised mine plan. On a per-tonne basis, group mining cash costs increased to $113 per tonne, because our fixed costs were spread over fewer tonnes, mainly at Buchanan, where unit costs rose to $132 per tonne on lower volumes.
The revised full-year cost guidance of $105 to $110 per tonne reflects around $5 per tonne from lower volumes, and around $7 per tonne from the stronger Australian dollar and higher diesel fuel prices. While earnings improved significantly, cash flow continued to be affected by several timing-related and one-off factors in the quarter.
Port congestion at Curragh resulted in vessel loading delays of between 10 and 14 days. At quarter-end, approximately 600,000 tonnes of coal was held at port awaiting shipment.
Those delayed vessels represented approximately $50 million of revenue, with most vessels already having sailed now in October. We also continued to invest heavily in inventory.
Curragh's ROM inventory increased by approximately 600,000 tonnes to around 830,000 tonnes at the end of September. We also carried the semiannual interest payment on our senior secured notes and paid our annual insurance premiums in the quarter.
Lastly, the geological disruptions at Buchanan impacted production volumes, and consequently revenue and cash generation. As Barrie outlined, much of the inventory build was deliberate, although CHPP constraints and port congestions also contributed.
Having these levels of inventory supports system stability, improves operating flexibility, and positions the business to benefit from future improvements in plant performance, while providing an inventory buffer ahead of the wet season. Adjusting for these items and excluding the prepayment arrangements, the underlying business would actually be cash-flow positive in the quarter.
The underlying financial performance was stronger than the cash flow results may initially suggest. Liquidity strengthened materially in the September quarter.
Available liquidity increased by $57 million in the quarter to approximately $155 million at the end of September. This was supported by the $75 million Glencore prepayment arrangement completed in August, and reflects management's continued focus on maintaining adequate financial flexibility while the reset program progresses.
Net debt reduced to $553 million, compared to $606 million at the end of June. It is important to note our net debt measure excludes the liabilities relating to Glencore and Stanwell prepayment arrangements.
We have no significant debt maturities until our senior secured notes mature in October 2029. Capital expenditure for the year is expected to be around the bottom end of our $150 to $175 million guidance range.
We remain focused on liquidity preservation, cash generation, and balance sheet repair. The business may not yet be exactly where we want it to be, but the trajectory is clearly improving.
As operational improvements continue and inventories are converted to sales, we expect stronger earnings and cash conversion moving forward. I will now hand back to Barrie for some closing comments before we move to questions.
Barrie van der Merwe
Thank you, Sandeep. We made good progress in the September quarter and achieved some results in the areas of open-cut mining and cost, building the required inventory levels, and improving product mix.
The CHPPs and Mammoth still need some work, which is taking a bit of time, but we have a plan, and we're executing on it. We are looking forward to the benefit of higher pricing flowing through to the December quarter, which will be supportive of cash flow, together with strong production and good cost management.
I remain very excited by the potential of our long-life, high-quality assets and the potential we are unlocking. Travis, please open the line for questions.
Thank you.
Operator
Thank you. If you wish to ask a question, please press star one on your telephone and wait for your name to be announced.
If you wish to cancel your request, please press star then two. If you're using a speakerphone, please pick up the handset to ask your question.
The first question today comes from Bikash from Primus Asset Management. Please go ahead.
Hi, morning. Can you guys hear me?
Barrie van der Merwe
Yes, thanks, Bikash.
Hi. Thanks, Barrie.
Thanks for the update. Few questions from my side.
I understand there were some operational disruptions unexpected in 3Q. How are we positioned for 4Q, or at least so far quarter to date?
Can you update on the recovery on those fronts? That's on the first question.
Secondly, in terms of the inventory build which you talked about, how much is further expected in 4Q?
Barrie van der Merwe
Just say that last bit again, Bikash?
The inventory build-out which you are looking to do, how much is already done so far in 3Q, and what is further expected in 4Q?
Barrie van der Merwe
All right. On the first part, thanks for that.
We're obviously focusing on the third quarter here and unpacking that. We'll report on the last quarter, December quarter, when that occurs, but I think if you look historically, the December quarter is usually a strong production quarter.
Then with the guidance that we've put out today in terms of saleable production, as well as we guided quite a bit on where the inventory's at and where we expect the inventory to end, that should give you a good idea of what we're envisaging for the last quarter, which is running well so far. That's on that bit.
In terms of the inventory builds at Curragh, as we stood at the end of September, as we said, about 830,000 tonnes of inventory, and then anticipating that to be about one and a half as we get to December. As we follow the mine plan, that'll just drop out.
Understand. On your mining cost, I'm still going through the numbers, but from what I have read and what I'm seeing, and your comments on it, it was about $18 million lower year on year.
Can you elaborate on how should I read through, sorry, $18 million lower quarter on quarter? How should I compare those numbers for September quarter versus June quarter?
Barrie van der Merwe
Look, maybe that sounds like a bit of a detailed modeling one. Maybe you catch up with Chantal afterwards so that we just make sure we cover that one properly for you, Bikash, if that's all right.
Understand. One more question is on hedging.
Are you looking to do any sort of hedges given where the met coal prices are and lock in some yields?
Sandeep Deoji
No, nothing on coal pricing as yet. FX, we sort of consider from time to time from a short-term perspective, but no long-term hedges.
Understand. I'll get back in the queue.
Thanks. Great.
Barrie van der Merwe
Thank you.
Operator
Thank you. The next question comes from Glyn Lawcock from Barrenjoey.
Please go ahead.
Glyn Lawcock
Morning, Barrie. Barrie, could you just talk a little bit about Mammoth and the faulting?
You said there's faulting in the two panels you're currently in. What drilling's been done, and is it just a case of you drill and you've just missed the fault, and do you have any sense of the sort of medium-term outlook for faulting?
Thanks.
Barrie van der Merwe
That's good, Glyn. We have looked at that quite a bit over the last couple of weeks.
As it goes with mining projects, pre-feasibility, there's a certain drilling density going with that, and all of that was done appropriately. There are gaps between these holes, and kind of because there's gaps, you do find things in between that you don't expect.
I think what's occurring, especially in the North Main section where the guys are, it's a mains development getting to the northern part of the mine, which sets it up for the future, the faulting just continued for longer and was more complex than what was anticipated. Faulting in the south was less intense.
I think the team's learned a lot going through this. We've got some plans from an equipment point of view going into next year as to kind of using some different equipment, hiring that in at times, to better navigate this kind of ground as well.
Then as I touched on in the discussion piece, there's been some changes in the management of that mine made to also make sure we cover and respond to the faulting appropriately. I think safe to say that if you look at the productivity outlook for Mammoth compared to what we originally thought when the investment was approved, it will be a bit less.
We're still hopeful, as I said, that it can be a good asset if we learn to deal with these conditions properly.
Glyn Lawcock
That's great, Barrie. I think it was what, originally 2 million tonnes per annum?
What are you thinking? Are we 10% lower, 20% lower?
Do you have a sense?
Barrie van der Merwe
Look, I think we are working to get to a 1.8 million ROM tonne position. That's what I think is doable if we do it well, Glyn.
That's what we're targeting.
Glyn Lawcock
No, that's great. Then maybe just one for Sandeep.
What is the aggregate then if you add in the Glencore and prepayment balance? How much is that now in total on top of what you've disclosed?
Sandeep Deoji
Just clarify that, Glyn. What do you mean in aggregate?
Glyn Lawcock
You said the net debt excludes the Glencore prepayment balance. What is the Glencore and prepayment balance that we'd have to add on top of the net debt you've disclosed today?
Sandeep Deoji
The Glencore balance probably remains about just under $75 million. If you look at the other prepayments that we would have received from Stanwell, that added another about $45 million in the quarter.
Glyn Lawcock
We've got it from the half-year finances for what it was then.
Sandeep Deoji
Yes, correct. Yep.
Glyn Lawcock
Okay. Then, Barrie, you've given us a taste for '27 today when you've said you're aiming to get back to 16 to 17 million tonnes.
Do you think you'd be at a similar cost? I just note that the '26 guide originally was for $1,500 million of costs, if you took the midpoint of volume and the midpoint of costs.
You've been pushing $400 million a quarter, a little bit less in the third quarter. Does that mean we're sort of thinking 16 to 17, but a slightly higher C1 than what was guided for '16, or do you think with all the benefits you've got coming through, you had the $18 million down in Q3 at Curragh, and so you were at $385 million a quarter, but you need to get it down to sort of three, I don't know, what's $1,500 divided by 4, you need to be down sort of below $350 million a quarter to hit the guidance you gave us this year?
Barrie van der Merwe
Look, we're going through the budgets now, and there's many moving pieces to it. From a volume perspective, and I talk kind of waste bcms, the whole plan is drop it in the south, make the south cheaper, and then reinvest some of that and maybe a bit more in the north.
Still working through that north piece. Depending on how much waste we mine in the north, that may add a bit to cost.
That's the one bit that I just need to get more clarity on as we move forward. Then offsetting that, we've done a lot of work on the procurement arrangements, the mining services contracts with the likes of Thiess and Golding, which should give us a benefit.
I don't want to be too overt on the cost at this stage. I'd rather kind of work through it properly and not spitball it, Glyn.
I think we've got the opportunity to balance out the need to mine a bit more waste in the north with savings that's coming through the improvement program. Then I think the big game changer in terms of cost per tonne per saleable product tonne is getting that 10% improvement in the rate and hours from the CHPPs, maybe a slight yield uptick because we've got a more stable system.
All of that together should leave us in a decent spot with cost per tonne next year.
Glyn Lawcock
Yep, no, that's great. Maybe if I could squeeze one final one in.
Just Sandeep, I think you said in your commentary you'd be cash flow positive in the quarter even if you backed out the Glencore prepayment, was what you said. Can you just sort of, maybe unpack that a little bit more?
You talk about $50 million of lumpy cash flow in the quarter, but $40 million of that is the capex anyway, it's only really 10. It's a bit of a line ball decision.
Were you sort of more indicating if you hadn't had the inventory build as well, you would have been a positive cash flow quarter, or is it even with that inventory build you think you were still positive? Thanks.
Sandeep Deoji
Maybe if I, like you said, break it down for you. If you look at the cash balance where we ended, we were at 155 at the end of September.
You take off the 75 that we got from Glencore, that will take you down to 80. If you see where we were at the end of June to where we ended, that's $20 million less.
Some of the things that were probably one-off lumpy cash flows in the quarter was we had some additional capital spend for long-lead items that got delivered in Buchanan. If I was to sort of normalize that from a run-rate perspective, you'd probably add about a $15 million to cash.
Then you had the biannual interest that we paid in the quarter as well. If we were to sort of pay that on a monthly basis, I'd probably normalize that at about $10 million as well.
Then similarly with insurance as well, that's another $15 million. You very quickly get to about $20 million positive.
Then the inventory piece, if we were to sort of load the inventories at port onto ships, like I mentioned, there's about $50 million revenue. Now, you'd probably say that from a working capital assumptions perspective that will flow into October, but we do have arrangements with our customers where we had the ability to sort of pull that cash flow forward.
Even if you assume another $40 million cash flow into the quarter, you very quickly get to about positive $60 million of cash in the quarter.
Glyn Lawcock
That's excellent. Thank you so much for the detail.
Really appreciate it. Thanks, all.
Sandeep Deoji
Good.
Barrie van der Merwe
Thank you, Glyn.
Operator
Once again, to ask a question, please press star one on your phone. The next question is from Stefan Hansen from Macquarie.
Please go ahead.
Stefan Hansen
Thank you. Hi, Barrie.
Hi, Sandeep. Glyn asked on Mammoth faulting.
I was wondering, could we talk a bit about Buchanan, the fault that you found there, and just, I guess your understanding now of that fault and whether there's any risk that that fault is carried through into any other panels that might affect production in the future?
Barrie van der Merwe
Stefan, thanks for that. At Buchanan, as I said, I think that the quantum of this is isolated, and I don't expect it to recur.
When you look at that mine, the ground in the south in that south panel is more faulted, and the roof conditions are a bit tougher than in the north. I think what occurred here is, the team got into the failing roof.
Part of the trick in the south is to not stop. If you stop, things get worse very fast.
The team pushed on, tried to get through that, and in that process the situation just worsened, and we got into a challenging position. We did invoke and deploy kind of new void-filling products and technologies as part of that.
We had to pivot a bit, do things a bit differently. I think if you take those learnings, Brett and the teams developed a very good TARP plan as well as to how exactly do we deal with these conditions when they occur, which is something that we've not had as formalized in the past.
Confident that if we get into it again, we'll go through it differently. We will encounter roof conditions again in the south.
That's just the nature of it. I think we're very well-equipped to mitigate the impact of that in future.
Stefan Hansen
Thanks. The longwall move, can you tell me, is that in the north or the south, and how long will that take?
Barrie van der Merwe
Yep, we've got one coming up in the north next month. It'll be somewhere between the 15th and 20th of November, and we achieve that in the US in about 7 to 10 days.
The team's ready. They've actually already started putting in some of the shields.
In the north, we used to have 700-foot panels. This is our first 1,000-foot panel.
That'll hopefully help us a bit into next year as well. It started to happen, and it's a fairly quick process.
The guys are very well-practiced at it. As you get into next year, we'll move the south in Feb/March.
Stefan Hansen
Great. Thanks very much.
Barrie van der Merwe
Cool. Thanks, Stefan.
Operator
Thank you. The next question comes from Daniel Roden from Jefferies.
Please go ahead.
Daniel Roden
Hi. Good day, Barrie.
Thanks for taking my question. Just a quick clarification on the indicated calendar year '27 guidance of 16 to 17 million tonnes.
Does that include the conversion of the 1.1 million tonnes of stockpile by any chance? If it does, does that imply the underlying run rate at 15 to 16?
Barrie van der Merwe
Look, in terms of that inventory level, we've got a deliberate strategy to carry a bit more inventory as a matter of course. At the end of December, that will be more because we're preparing for the wet season.
I would see us carrying between 600,000 and 800,000 tonnes of ROM kind of generally. You should expect at the end of next year, we should rebuild again to quite a high level.
You should see that number pretty much as a mining delivery run rate.
Daniel Roden
Okay. No, thank you.
You've called out the CHPP program that is part of the calendar year '27 recovery. I guess, does that need any capital?
Would that sit implicitly inside of that $150 to $175 guidance range, or is this a additive kind of opportunity that you're looking at?
Barrie van der Merwe
Sandeep, you want to talk about capex? What we expect generally for capex, just generally?
Sandeep Deoji
Look, I don't think there's no sort of major capital projects planned for next year. Capital from a guidance perspective, and obviously we will sort of firm this up when we do come up with guidance in February, but it should be at similar levels to 2026.
Daniel Roden
Okay. No, thanks for that.
Maybe just another one on the prepayments, just, I guess with the layering between Glencore and Stanwell at the moment, maybe I guess the precedent payments there and how should we think about, I think personally I understand the Stanwell repayment mechanisms pretty well, but just how do we think about, over the next kind of 12 or 24 months how the repayments of those prepayments and what are the conditions for those to start being settled?
Sandeep Deoji
Sure. Just sort of splitting them up, the Glencore, as we sort of disclosed to the market previously, $75 million prepayment, obviously attracts an interest rate of about 14%, and we settle that by delivery of coal over the next 12 months.
The Stanwell one is a little bit more tricky, and as you said, you've sort of gone through that in terms of disclosures we made. That's obviously over a longer period of time as well, and if you think about the prepayments that we are getting from Stanwell at the moment, that's linked to our liquidity levels as well.
As our liquidity levels improve and go over $200 million, we'll start to see that prepayment reduce, and then once we sort of get to 250 million, that prepayment from Stanwell will stop. Then that gets repaid as part of our commitment to provide coal to Stanwell, over a longer period of time up to about 2040, '43, depending on their nominations.
Daniel Roden
Okay. No, thanks for that.
I'll head back over. Cheers.
Operator
Thank you. The next question is a follow-up from Glyn Lawcock from Barrenjoey.
Please go ahead.
Glyn Lawcock
Hi, Barrie and Sandeep again. Sorry, Sandeep, just going back to your excellent cash flow breakdown, and you ended up at about $60 million positive for the quarter, but I do have to take off the $45 million in Stanwell, don't I?
Barrie van der Merwe
Then there's still 15 left.
Glyn Lawcock
I'm not saying it's not positive, Barrie. I'm just wanted to make sure it wasn't an underlying 60.
It was an underlying 15 positive, not an underlying 60 positive. It is.
Barrie van der Merwe
That's right. That's correct.
The other way to look at it is to say Stanwell paid the right price for the coal, then kind of the business potentials actually the 60. You're right.
At some point, if we have more cash, that has to go back. Fair game.
Glyn Lawcock
No. It would be nice if you could get them to pay the right price, but yeah, that horse has bolted.
Barrie van der Merwe
We never give up, Glyn.
Glyn Lawcock
That's what we like to hear. Thanks again.
Barrie van der Merwe
Thanks, mate.
Operator
Thank you. That does conclude the question and answer session.
I'll hand the conference back to Barrie for any closing remarks.
Barrie van der Merwe
Good. Thanks, everyone, for dialing in.
We'll continue on this journey of the Curragh reset program. I'm looking forward to the price tailwinds that we'll see wash through in this last quarter.
Then somewhere in October, we'll put out the quarterly financials, and then we'll speak to you again early next year with the December quarterly. Thank you.