P.J. Ramos
Good afternoon, investors, analysts, fund managers, and valued stakeholders. Welcome to Meralco's first quarter 2026 financial and operating results briefing.
We are pleased to have you with us participating both in person and via MS Teams, and we thank you for taking the time to be with us today. Before we begin, please note that this session is being recorded.
Kindly observe the ground rules that were circulated prior to this meeting. Today, we will walk you through Meralco's performance for the first quarter ended March 31, 2026.
The presentation materials are available on our website under the Investor Relations section. Joining us today are members of Meralco's management team: Mr.
Ronnie Aperocho, Executive Vice President and Chief Operating Officer; Ms. Betty Siy-Yap, SVP and Chief Finance Officer; Mr.
Emmanuel Rubio, President and CEO, Meralco PowerGen; Attorney Jose Ronald Valles, SVP, Head of Regulatory Affairs and Head of DU Regulatory Management. Our discussion today will begin with presentation of financial performance, followed by updates on our distribution utility operations, power generation business, and key regulatory developments and outlook.
We will open the floor for a Q&A session before concluding with closing remarks from our COO. At this point, I would like to invite our Chief Finance Officer, Ms.
Betty Siy-Yap, to walk us through the financial highlights for the quarter.
Betty Siy-Yap
Sorry about that. Our CCNI for the quarter ended March 31, 2026 grew 2% from the combined contribution of a stable distribution utility and the growing power generation portfolio.
The DU business continued to account for the largest share of our 11.4 billion CCNI at 5.3 billion, 46% of the total, although down from the 61% in 2025, with a higher share of power generation business. The DU sales volume was slightly lower at 12,273 gigawatt-hours versus the almost 12,500 gigawatt-hours in 2025.
CCNI contribution of power generation grew by 51% to 5.1 billion, and now accounts for 45% of CCNI, up from 30% in 2025. The sales volume of power generation was at 6,626 gigawatt-hours, 25% higher than the 5,294 gigawatt-hours in 2025, mainly driven by the full quarter volume of LNG PH.
Thermal plants generated 1.2 billion in revenues from the reserve market versus 1.7 billion last year. On January 26, 2026, the ERC granted PEDC's change in circumstance or CIC claim representing unrecovered fuel costs from September 26 to December 4, 2022, allowing the recovery from Meralco customers of close to 381 million pesos.
On MGreen, early this year the ERC approved an advisory regarding feed-in tariff related to Calatagan, SP Calatagan. This allowed SP Calatagan to bill or to recover 69 million in FIT adjustment.
For Terra Solar, it achieved a key milestone in March, beginning with the delivery of an initial 85 megawatt of clean energy to the Luzon grid on March 14. This output was progressively ramped up to 250 megawatt by the end of the month in line with the grid integration parameters of the NGCP.
Complementing this, the project successfully energized the first tranche of its battery energy storage system, enabling the delivery of 450 megawatt-hours, equivalent to 112.5 megawatt of stored energy, to the grid during nighttime hours. Total energy sold for the month reached 10.6 gigawatt-hours.
Also in March, NGCP issued a provisional authority for one of our other solar project, a 450 megawatt power plant in Bugallon, Pangasinan. Lasol started delivering power to the grid at 50 megawatt, ramping up to 300 megawatt by March 31.
This generated a total of 7.7 gigawatt-hours. For retail supply business, sales volume was at 1,827 gigawatt-hours, up 9% versus last year, mainly from new customers.
For financial highlights, CCNI for the quarter increased by 2% to 11.4 billion from 11.2 billion in 2025. Consolidated reported net income increased by 4% to 10.8 billion from 10.4 billion the previous year.
The gap between CCNI and consolidated reported net income represents day one gain adjustment, accretion of day one gain adjustment, as well as foreign exchange gains from Chromite and SPNEC. Similar to our CCNI, our core EBITDA rose 2% to 19.6 billion from 19.2 billion in 2025.
The total energy volume handled by One Meralco was 15,895 gigawatt-hours, up versus last year's 15,621 gigawatt-hours. The Philippine volume was at 14,431 gigawatt-hours, also higher versus the 14,218 gigawatt-hours last year.
DU volume, inclusive of sales of PELCO II, which we manage under an IMA or Investment Management Contract, was at 12,468, 52% of about 23,900 gigawatt-hours total volume distributed by all DUs and electric cooperatives in the Philippines. RES volume, as mentioned, was 1,827, with 1,497 sold within the franchise area and 330 outside the franchise area.
This was 26% of about 6,900 gigawatt-hours total volume supplied by all RESs. The MGen volume at 6,626 had 5,223 sold within the Philippines, 18% of approximately 28,100 gigawatt-hours volume delivered by all GenCos in the Philippines.
A total of 3,529 gigawatt-hours was sold to the Meralco DU and its local and affiliate RESs. The contracted capacity of Meralco of 2,992.5 megawatt with MGen represents 38% of Meralco's franchise area peak demand, or 25% of the Luzon peak demand during the quarter.
This chart shows the segment information. On the right side are the contributions in terms of CCNI, gross revenues, and core EBITDA.
The CCNI contribution of our regulated or distribution business represents the consolidated energy volume of Meralco, Clark Electric Distribution, and Shin Clark Power, the total of which was 12,273, as mentioned, 2% lower versus last year. For our unregulated businesses, the higher CCNI in terms of peso amount came from the growing power generation business, with its share now at 45% from 30% last year.
This is equivalent to 5.1 billion, driven by the strong performance and the full quarter results of LNG PH, where MGen holds 40.2% interest following its acquisition at the end of January of 2025. The retail electricity supply business and non-electric businesses meanwhile brought a combined 1 billion pesos, or 9%, driven by continuing customer acquisitions for our RES unit.
The DU revenues accounted for 82% of the total. RES and non-power subsidiaries and affiliates accounted for 12%, and power generation at 6%.
Out of the consolidated core EBITDA of 19.6 billion, DU contribution amounted to 10.4 billion and accounted for 53% of the total. Power generation core EBITDA contribution was at 7.7 billion pesos, and contributed 39% of the total, while RES and other non-power subsidiaries and affiliates accounted for the remaining 8%, or 1.5 billion pesos.
The consolidated revenues increased by 5% to 120.8 billion from 114.5 billion in 2025, driven by higher pass-through generation and transmission charges of the DU and higher power generation revenues. Electric revenues of 118.1 billion accounted for 98% of the consolidated revenues.
Generation, transmission, and other pass-through charges were 7% higher at 94.7 billion pesos versus 88.6 in 2025. Generation charge for the period includes a 30 centavo per kilowatt-hour combined contract price adjustment relating to additional fuel cost recoveries which the ERC approved for four generation companies.
These are ACEN, SPPC, Sual, and Panay Energy. Also contributing to the higher generation charge were the higher fixed costs of the First Gas plant following the ERC-approved interim extension of the power purchase agreement with Meralco, and also the peso depreciation as the local currency weakened to an average of 59.102 pesos to the dollar versus 57.96 against the US dollar during the first quarter.
Transmission charge also increased due to higher ancillary service charges from the reserve market and NGCP's higher maximum average revenue, which is equivalent to 10 centavos per kilowatt-hour as approved by the ERC, and collection of all its under-recoveries from the period 2016 to 2022, resulting to a 4 centavo per kilowatt-hour additional billing. Distribution revenue decreased by 2% due to the lower volume sold and the 0.0023 per kilowatt-hour downward rate adjustment for the reset expert costs refund starting February of 2025.
Energy fee, which totaled 6.8 billion, increased by 9% from 6.3 billion to 6.8 billion from GBP's higher WESM revenues, SP Calatagan's FIT rate adjustment, and the higher irradiation of solar power plants, and PEDC's fuel CIC. The 2.7 billion non-electric revenues were largely from Radius for its enterprise and SME accounts and the billable projects to PLDT, from Miescor's EPC projects, and Mserv's high voltage solutions and integrated facilities management project.
Costs and expenses totaled 110.5 billion pesos. Purchased power cost accounted for 84%, OPEX represented 9%, depreciation at 4%, and the combined coal and fuel and power plant O&M at 3%.
Purchased power cost increased by 7% to 92.7 billion from 86.4, reflecting higher generation and transmission costs billed by the generation companies as well as NGCP, the details of which have been previously explained as part of the revenue charges. Operating expenses amounted to 10.4 billion, 1% higher year on year, primarily due to sustained cost efficiency measures and tighter management of controllable expenses, including optimization of operations and deferral of non-essential activities undertaken to protect customers from the cost pressures arising from the Middle East conflict.
These initiatives reinforced Meralco's commitment to reliable service delivery while prudently managing costs in a volatile global environment. Depreciation and amortization was higher by 10% with the completion of CAPEX projects during the period.
Combined coal and fuel and power plant O&M amounted to 2.8 billion, higher due to PEDC 3 and Cebu Energy's plants 2 and 3 maintenance in 2026, whereas in 2025 it was only unit 3 of Cebu Energy. Fuel costs increased with GBP's higher WESM sales.
Other expenses pertains to provision reversals after settling of various tax arrearage and assessments, net of provisions for over-recoveries. The power generation business ended the first quarter with a 51% growth in CCNI versus the same period last year, mainly driven by full capacity operations and full three-month contribution of LNG PH starting its acquisition end of January.
The LNG business contributed close to 4 billion to the CCNI as LNG PH and PacificLight delivered a total of 2,712 gigawatt-hours and 1,464 gigawatt-hours, respectively. The thermal business contributed 1.6 billion, higher by 6% from last year's 1.5, due to the higher earnings from the WESM, partially offset by the weaker reserve market pricing.
On capital expenditures, consolidated CAPEX stood at 19.5 billion in the first quarter. Of this amount, 71% was spent for MGen's 3,500 megawatt DC Terra Solar power plant with the 4,500 megawatt-hour battery storage, as well as 49 megawatt battery energy storage in Toledo, Cebu, and the 31.8 megawatt expansion of SP Tarlac.
The total DU CAPEX of 5.7 billion were spent largely on new connections, asset renewal, load growth projects, pole relocation to support government infrastructure projects, and non-electric projects. Cash and cash equivalents amounted to 112.9 billion, while our short-term and long-term investments totaled 172 million and 4.2 billion pesos, respectively.
Major cash transactions during the period include the Meralco AWAT refunded to customers, amounting to 1.4 billion in the first quarter of this year. A total of 6.3 billion has been refunded since April of 2025 as part of the 19.96 billion AWAT refund over 36 months.
Note, though, that the refund period has been shortened to 12 months for the remaining amount following ERC's decision last April 22. Loan drawdowns of Meralco totaled 6.5 billion, mainly used to pay the working capital adjustment as well as the reimbursable cost to San Miguel Global Power in relation to the Chromite acquisition.
Terra Solar's drawdown of 7.5 billion from its project financing, which now totals 76.1 billion pesos. Infusion by Actis of 3 billion pesos, and dividends received from unconsolidated investees of 2.7 billion, largely from PacificLight and San Buenaventura.
Our consolidated interest-bearing debt stood at 238.1 billion pesos, including the 125.1 billion pesos debt of our subsidiaries. As of end March, our net debt stood at 125.1 with net debt to EBITDA ratio of 1.7 times.
Debt maturities are spread through 2040, most of which are in Philippine peso, except with respect to the PacificLight debt. Our core EPS is at 10.137 per share, up 2% year on year, while our reported EPS is at 4% higher at 9.611 per share.
That ends my report. Thank you.
P.J. Ramos
Thank you, Ms. Betty.
Overall, the quarter reflects stable earnings growth and disciplined cost management, with core net income up 2% to 11.4 billion, supported by both DU and power generation business. We will now move on to the operating performance.
I would like to invite our COO, Mr. Ronnie Aperocho, to present the operating performance of the distribution utility.
Ronnie Aperocho
Thank you, PJ. Good afternoon.
Thank you for joining us in today's briefing. The first quarter of 2026 began on a challenging note.
Cooler than usual temperatures driven by weak La Niña conditions softened electricity demand across our franchise. At the same time, heightened geopolitical tensions in the Middle East increased volatility in global energy markets, placing upward pressure on fuel costs and power rates.
These developments encouraged greater energy conservation and accelerated interest in rooftop solar adoption. Despite these headwinds, Meralco delivered solid operational performance, achieved meaningful improvements in service reliability, and continued to expand its customer base.
Let me walk you through the key highlights of our first quarter performance. On energy sales, Q1 2026 energy sales reached 12,273 gigawatt-hours, lower by 1.8% year on year, primarily due to the cooler weather conditions dampening demand.
Recovery toward the summer months was tempered by intensified energy conservation measures following the escalation of the Middle East conflict. We estimate that 3% to 5% of potential energy sales were forgone due to the adoption of four-day work weeks, work from home arrangements, shorter mall operating hours, and similar demand curtailment initiatives.
These effects were partly offset by faster customer energization. On net system input, the DU net system input declined to 12,640 gigawatt-hours, reflecting a drop of 2.3% compared with the same period in 2025.
Meralco's peak demand settled at 7.91 gigawatts recorded last March 6, 2026, 5.1% lower compared with the same period in 2025, consistent with the milder temperature profile experienced in the quarter. Comparably, the Luzon peak registered 12.80 gigawatts on March 5, which is a 2.3% decrease as well.
Our customer count continued to grow, reaching 8.26 million customers, a 2.2% increase year on year, highlighting sustained growth in electrification and service reach. On system loss, the 12-month moving average system loss improved to 5.72%, a notable 0.32 percentage point reduction year on year.
This reflects our sustained investments in network upgrades, loss reduction programs, and stronger operational discipline. On SAIFI and SAIDI, reliability indicators also showed strong results as we attained double-digit improvements versus same period last year.
Total SAIFI fewer by 19% at 0.15 times, and SAIDI was shorter by 10% to 97.5 minutes. Meanwhile, our average time to connect customers was faster by 6% at 2.22 days over 2.36 days last year, reinforcing our commitment to customer convenience and service excellence.
On electricity rates, our average electricity retail rate for the first quarter of 2026 was 12.39 pesos per kilowatt-hour, 12% higher versus the same reporting period last year, primarily due to the following. First, it was due to higher generation charge, 10.2% increase, mainly from the change in circumstances or CIC recovery of some PSAs, recovery of Santa Rita's higher fixed charges, and lower WESM share.
Second is due to the increased transmission charges, 38.3% increase from higher ancillary services costs, higher power delivery service charges, and collection of NGCP under-recoveries. Third, it was due to higher FIT-All charges, 123% increase from higher FIT-All rates implemented in Q1 of 2026.
The last was GEA-All was also implemented starting January 2026. Following the discussion on energy sales earlier, let us now look at the sector breakdown.
The residential segment accounted for 33% of total sales, or 4,111 gigawatt-hours. Residential sales fell by 3.4% as cooler weather softened demand.
The commercial segment, which makes up 38% of total sales, posted a slight decline of 0.8% as cooler temperature reduced HVAC usage, and vacancies offset gains from restaurants. The industrial segment, accounting for 38% of total sales, likewise slipped by 1% year on year as operational disruptions and steel raw material constraints offset gains from semicon and cement industry.
This slide highlights our key network investments completed in the first quarter of 2026, which directly support load growth and further strengthen system reliability across our franchise area. In the first quarter, we energized three major capital projects worth 959 million pesos, significantly strengthening grid reliability and capacity.
This portfolio includes the development of New Bocauwe GIS Substation, replacement of 34.5 kV switchgear number one at Gateway Substation, and expansion of Balagtas 115 kV-34.5 kV Substation, the second bank 83 MVA, and collectively adding a total capacity of 166 MVA. Thank you, and turning you over to Attorney Ronald Valles for the regulatory report.
Jose Ronald Valles
Good afternoon. Anyway, for the regulatory update, first on your slide is the AWAT, or the actual weighted average tariff decision of the ERC, for ERC case number 2025-005.
Last March 14, if you recall with last year, Meralco received the PA, the provisional authority, where ERC directed us to refund 19.96 billion at an average rate of 11.89 centavos per kilowatt-hour for a period of 36 months starting April 2025. This was subsequently on April 22, 2026, superseded by the ERC decision, main final decision on the AWAT case.
In this decision, the ERC ordered Meralco to refund the remaining unrefunded amount amounting to 14.17 billion at an average refund rate of 25 centavos per kilowatt-hour, effective on May 2026 billing. The implementation period shall be within 12 months or until the remaining amount is fully refunded.
Apart from this, we have two other AWAT pending cases covering the period of January to June 2025, which is for 4.69 billion, and another one for covering the period July to December 2025, which is 4.32 billion pesos. Next slide, please.
On March 26, the ERC also promulgated the revised pass-through taxes resolution under ERC resolution number 9 series of 2026. This revised pass-through taxes resolution effectively superseded ERC resolution number 2 series of 2021, which was the basis for the pass-through nature of the paid real property tax, local franchise tax, and business taxes by the DUs.
The rules were published on April 2 and became effective on April 17. Among the salient amendments from the previous rules are the following.
First is the removal of the provision of limiting the scope of taxes paid for the year 2021 onwards. Tax arrearages, excluding interest, penalties, and other charges, imposed on and paid by DUs for the years prior to the effectivity of the rules shall now be allowed recovery.
For PDU, the proposed recovery shall be filed with the commission within 60 days from the effectivity of the rules, or on June 16, 2026. The initial RPT amount for filing and collection on the part of Meralco is around 3.9 billion pesos, representing the RPT paid in prior years up to calendar year 2020.
The revised rules also included RPT paid on properties covered by usufruct agreements in the scope of pass-through real property tax upon finalization of the regulatory reset process for the next regulatory period, and also the provision on ERC post-audit requirement that DUs shall retain relevant documents for the last 10 years from the expiration of the DU franchise. Last March 31, 2026, Meralco filed an application for the pass-through of our over-under-recoveries for the calendar years 2023 to 2025.
In that application, we prayed for the net under-recovery of 555.48 million pesos, consisting of generation, transmission, and system loss charges, subsidies, RPT, and LFT. We are proposing a recovery period of 12 months for all charges, except for senior citizen subsidy with a proposed one-month recovery period.
Total indicative rate for the proposed recovery period is only 1.62 centavos per kilowatt-hour on the average. As an update on our first regulatory period application under PBR, we filed our 1RP application last February 2.
Hearings were conducted between March 3 up to April 16, and then we submitted already our formal offer of evidence, and the presentation of witnesses or evidence by the intervenors, namely Commissioner Non and another intervenor was completed last April 30. We are expecting that the ERC will release the decision in June 2026 in time for the start of the 1RP in July.
For the CSP, Meralco's 2026 Power Supply Procurement Plan, schedule of CSP activities had to be revisited and realigned due to significant delays in the conduct of CSP for the capacities covered by the previously approved 2025 PSPP. The summary of the updates reflected in the 2026 PSPP are as follows.
For the 600 megawatt baseload, the implementation in the first year will now be for 300 megawatt, and with the remaining 300 megawatt to be implemented starting the following year. For the 900 megawatt baseload, the implementation in the first year will now be only for 600 megawatt, and the remaining 300 megawatt to be implemented starting the following year.
The start date was also moved from 2030 to 2031, but the commencement of CSP remains scheduled for September 2026 to allow for timely completion. For the 450 megawatt mid-merit CSP, the capacity was reduced to 400 megawatt.
The start date was also deferred to 2030, and although the TOR for the CSP was already submitted to the Department of Energy in May 2025, Meralco withdrew its request for certificate of conformity since the CSP is no longer scheduled to commence in 2026. For the 500 megawatt mid-merit CSP, the start date was moved from 2032 to 2034, and the CSP is no longer for the renewable energy requirement.
Finally, the 400 megawatt baseload CSP is a new requirement that we have reflected in our 2026 PSPP. Thank you.
I will now turn you over to Mr. Manny Rubio for PowerGen update.
Emmanuel Rubio
Thank you, Ronald. Good afternoon, everyone.
I'll begin with our number one priority across all sites, health and safety. For the first quarter of 2026, I am pleased to share that we maintained a safe working environment with over 91 million safe man-hours for both employees and contractors.
As always, we continue to strengthen and enhance our safeguards to ensure that every team member in MGen returns home safely every day. Moving on to our financial and operational results, during the first quarter of 2026, MGen delivered 6,626 gigawatt-hours of energy, which is 25% more than same period last year.
The overall MGen thermal group delivered 2,215 gigawatt-hours of energy, marking a 6% increase, driven by Global Business Power's higher dispatch and San Buenaventura's higher plant availability. MGen's liquefied natural gas investment in LNG PH, through Chromite Gas Holdings, delivered 2,712 gigawatt-hours, 66% higher due to its first full quarter of operations under our portfolio compared to 2025.
Meanwhile, Singapore-based PacificLight Power Private Limited delivered 1,464 gigawatt-hours due to increased plant availability. Finally, MGen Renewables delivered 234 gigawatt-hours, a 34% increase from last year, driven by the additional capacity from solar facilities commissioned after first quarter of 2025 for Juwi, as well as new capacities from the energization of MTerraSolar this March and higher irradiance.
Overall, MGen's energy delivery achieved a significant 25% increase versus last year due to the new capacities in our portfolio, higher dispatch via Global Business Power, and higher plant availability of San Buenaventura and PacificLight. For Q1 2026, MGen's CCNI is now at 5.1 billion pesos, 51% growth compared to the same period last year.
This is driven by stronger contribution from LNG PH, MGen Thermal's higher WESM sales and participation in the reserve market, and PacificLight's higher volumes and fast-start contribution following its COD last May 2025. Plant availability was at 92.3%, slightly lower from last year due to scheduled outages of several plants, but notably, we still generated 6,626 gigawatt-hours of energy, which is 25% more from the same period last year.
With all of this, MGen now contributes 45% to the One Meralco CCNI, its biggest share today. Moving on to our key developments, the Toledo battery energy storage system has successfully been energized as load last March 26, 2026, and on April 10, it was energized as generator, with the grid compliance test completed on April 23.
It is now undergoing ancillary service test until May 8. With the first phase with 25 megawatts or 56.44 megawatt-hour capacity will be completed by May, but since we are already compliant with the test as a generator, we're now offering this for arbitrage, charging during the day and offering during the evening, given that WESM prices in Visayas have almost a 5x difference between day and night prices.
This project is designed to enhance grid stability by providing fast response power support, regulating up and regulating down, that helps balance supply and demand, improving system reliability and strengthening overall grid resilience and bring down ancillary service prices. Following the completion of PacificLight's green transition financing for its planned 670 megawatt hydrogen-ready CCGT with 201 megawatt-hour battery energy storage system power plant last December, we have been continuing pre-execution works such as environmental impact assessments, which actually got last two weeks ago, quantitative risk assessment, and pollution control study part of the pre-execution works for the project.
This power plant, scheduled to begin operations in 2029, is the first CCGT unit in Singapore integrated with large-scale battery energy storage system, enabling dynamic energy management to align electricity supply with grid demand. We remain on track in fulfilling our 600 megawatt commitment to Meralco with MTerraSolar's continued progress for phase one delivery in August.
Just less than 15 months after its groundbreaking, we celebrated the first spark, marking its initial energization and synchronization last February, which was attended by Secretary Sharon Garin and other officials from the DOE. Last March 14, MTerraSolar was energized as a generator, delivering an initial 85 megawatts of clean energy to the Luzon grid and marking the start of its contribution to the country's growing demand for reliable and clean energy.
This output was progressively ramped up to 250 megawatts by the end of the month in line with grid integration parameters by NGCP. Complementing this, the project successfully energized the first tranche of its battery energy storage system, enabling the delivery of 450 megawatt-hours, equivalent to 112 megawatts of stored energy, to the grid during nighttime hours.
This tranche now represents the largest operational BESS available in the Philippines. To date, our peak power PV achieved 248 megawatts of dispatch last March 27, while the maximum BESS daily discharge was at 409 megawatt-hours.
With these milestones, phase one of the project has reached an overall completion as of end of April 86.57%, following the award of its engineering, procurement, and construction EPC contract in October 2025. As of April 23, the project has a total installed PV capacity of 1,293 megawatts, demonstrating its full-scale potential fully commissioned.
This May 2026, MTerraSolar is looking at commissioning an additional 500 megawatt AC of solar capacity and 225 megawatt of battery capacity. This will make MTerraSolar the largest integrated operational solar PV and BESS project in the Philippines, and we just completed the bus-in last night of the N minus one needed for this 500 megawatt energization of Terra Solar.
Following these milestones, we are proving that a combination of variable renewable energy integrated with a storage system like BESS can provide a competitive source of mid-merit energy for the Philippines, which replaces traditional sources of mid-merit such as diesel or even gas. With the ongoing crisis in the Middle East that resulted to price spike of our fuel sources, the entry of MTerraSolar to the grid is not just timely, but critical as this project lessens our dependence on imported fossil fuels, which is subject to price volatility.
Up to the time we declare COD, Meralco's option to get all the output of Terra Solar, depending of course on the demand and prices in the spot market. I'm also proud to say that this project is proof that we Filipinos can build big and build fast if we get our acts together.
Nowhere in the world that a project of this magnitude and at this scale has been made operational in such a short period of time as in this case, 15 months from groundbreaking. MGen has recently signed a $2.8 million grant from the US Trade and Development Agency, supporting efforts to explore nuclear energy as part of the country's long-term energy strategy.
The grant will fund a comprehensive small modular reactor study, assessing the viability of deploying SMRs in the country, and the study will evaluate available SMR technologies, identify a shortlist of suitable designs, and conduct preliminary site assessments for potential deployment. The initiative forms a key step under Meralco's Nuclear Energy Strategic Transition, or NEST.
As an update, around 15 vendors have submitted their proposal for this initiative, and a final vendor recommendation has already been made, and it's for approval by the USTDA. The target schedule to start work on the SMR evaluation is this May, and the study is expected to be completed by April 2027.
We will make the appropriate announcements on the vendor as soon as it has been agreed with the USTDA. MGen Renewables has been awarded also the integrated management system certification by TÜV SÜD Philippines, now covering ISO 9001 for quality, 14001 for environmental management, and ISO 45001 for occupational safety and health.
This recognition spans MGen Renewables head office and key solar facilities in Nueva Ecija, Rizal, Bulacan, Isabela, and Tarlac, demonstrating consistent implementation of best practices across its sites nationwide. The suspension of the Wholesale Electricity Spot Market, or WESM, by the Energy Regulatory Commission last March, and the implementation of an administered pricing mechanism, reflected a necessary regulatory response to the extraordinary market conditions brought about by the Middle East situation.
In periods of system stress, prioritizing firm and dispatchable capacity, especially baseload generation, remains critical to maintaining grid reliability and supporting overall energy security. In response, MGen remained focused on keeping its plants running reliably and efficiently under the updated rules.
Our baseload thermal plants continued to operate at full available capacity, supporting system reliability while we carefully manage plant performance and costs in line with the administered pricing framework. Through this, we were able to sustain dependable power supply for the country throughout the market suspension.
Last Friday, the ERC has already lifted this suspension. Power generation companies like MGen are now allowed to offer at WESM in accordance with existing market conditions and rules and settlement based on clearing prices.
Despite the challenges posed by geopolitical tensions and continued volatility in global energy markets, MGen remains focused on maintaining reliability and stability across its operations. We have been managing our exposure to global market volatility through our diversified portfolio and a disciplined sourcing approach, supported by a mix of firm contracts and flexible arrangements.
This allows us to navigate market fluctuations while sustaining dependable operations. At the same time, we're strengthening our long-term position through ongoing capacity development and continuous optimization of our existing assets, including the advancement of MTerraSolar, the completion of the Toledo BESS phase one, and the expansion of our thermal facility in Toledo, Cebu, as well as other pipeline projects we have in our portfolio.
We're looking forward to participating in CSPs that will be offered by distribution utilities like Meralco, and in that case, looking forward to participating in the 900 megawatt baseload CSP in September using Atimonan. These efforts are aimed at ensuring that we remain resilient, responsive, and fit for the country's evolving energy needs.
We remain focused on strengthening self-reliance in support of long-term energy security for the Philippines in pursuit of powering a better tomorrow. Good afternoon.
P.J. Ramos
Thank you, Mr. Aperocho, Attorney Valles, Mr.
Rubio. We will now open the floor for questions from our analysts and investors.
You may raise your questions in two ways: raise your virtual hand and wait to be recognized before speaking...
Ronnie Aperocho
By the way, PJ, we still have the sustainability report. Before we go to the Q&A portion, just report briefly on sustainability.
This is just a brief highlight on the progress across two key programs in Meralco: resource conservation and efficiency, and embrace diversity and inclusion, as well as the recent sustainability recognitions. First, amid the ongoing energy crisis, we have further intensified our resource conservation and energy efficiency program.
This was launched in 2020, and this program aims to reduce electricity and water consumption across our facilities, helping lower Scope 2 greenhouse gas emissions, optimize operational costs, and strengthen compliance with the Energy Efficiency and Conservation Act. In March, we rolled out an employee-wide energy and resource conservation campaign across our offices.
As a result, total DU electricity consumption in first quarter 2026 declined by 5.3% year on year. We also sustained sustainability advocacy through the Earth Hour 2026, with executives promoting conservation practices and continued advancing our One Meralco solarization program, encouraging employees and customers to adopt on-use solar solutions, either through a solar savings plan or a solar subscription plan.
Moving on to our Embrace diversity and inclusion program, Embrace continues to drive our broader diversity and inclusion objectives, with emphasis on increasing women representation and empowering women, LGBTQIA+ individuals, and persons with disabilities. In line with these objectives, last March, we celebrated Women's Month with a series of events centered on empowerment, inclusion, and well-being.
Among the highlights was our forum entitled Beyond the Glass Ceiling: Women Breaking Barriers, featuring Olympic champion Nesthy Petecio and DOE Assistant Secretary Mandy Romero. Finally, moving on to sustainability recognitions, we are pleased to report that One Meralco achieved another milestone at the 2026 Asia-Pacific Stevie Awards, earning a total of 12 distinctions, bannered by our first ever Grand Stevie Award.
Our top awardee was our microgrid project in Cagbalete Island, which earned the Grand Stevie Award, the highest honor in the APAC Stevies, along with two Gold Stevies highlighting the huge positive impact of our electrification and sustainability efforts on underserved communities. We were also honored with a Gold Stevie for our inaugural 2024 One Meralco integrated report.
On the individual front, our Chief Audit Executive, Melanie Oteyza, was honored as the Thought Leader of the Year. Likewise, our Chief Sustainability Officer, Raymond Ravelo, was recognized for the third straight year for his leadership and contributions to climate and sustainability initiatives.
We also won a Silver Stevie for Greening the Network program, and received multiple awards recognizing initiatives across audit, community engagement, and purpose-driven marketing and communications. These recognitions affirm One Meralco's continued commitment to creating long-term value through sustainability, innovation, inclusion, and meaningful stakeholder impact.
Thank you.
P.J. Ramos
Thank you, Mr. Aperocho.
We will now open the floor for questions. We have several questions on the line at this point.
We read out some of them. First, on the DU side, can you share why did DU profits decline in first quarter versus first quarter 2025?
Other than the volume decline, what other factors contributed to the decrease in DU profits? I believe this is also in line with Clarissa's question: what led to the 21% year-on-year decline in the CCNI of the distribution business, considering volumes were just down by 2%?
Betty Siy-Yap
Hi, Greg. Hi, Clarissa.
Thanks for your question. Other than the volume, the other factors that resulted in the decline were higher OPEX, slightly higher OPEX.
As it's manpower intensive and contracted services. On top of that, our increasing IT expenditures with our online subscriptions, and then the continuing repairs and maintenance of the facilities, no?
We have also completed significant capital expenditures, the depreciation of which for those that were completed last year would have a full quarter depreciation for 2026. If you also recall, we continue to refund on the AWAT, no?
That brings down the balance of investable cash. While the AWAT refund does not affect P&L, as we've provided for this already, it impacts on the cash flow, the investable funds are lower.
In fact, in the coming months, the refund will be higher because the ERC has shortened the refund period from 20 36 months to 12 months, no? The remaining period should actually be about 24 months, it's now down to 12 months.
P.J. Ramos
Still on the DU, from Peter of Unicapital: on Meralco's rate reset, can we get management's view on how likely it is to be approved, given the potential inflationary impact of higher electricity rates?
Jose Ronald Valles
On the Meralco reset, as I earlier mentioned, no, the expectation is that the ERC will resolve one way or the other the application of Meralco in time for the July 1, 2026 start of the 1RP. Now, this, I think, very speculative if we say what rate will be approved or whether the ERC will grant the rate as applied for, no?
What I can tell you is historically, the ERC has made disallowances from the rate that we have filed. That's historically.
Our filing for the 1RP is based on the regulations of the ERC. If we complied with all the requirements, we're hoping that the ERC will give us a reasonable rate.
Thank you.
P.J. Ramos
Thank you, Attorney Valles. We'll shift the discussion a little bit to MGen.
What percentage of contracts entered into by MGen have pass-through mechanisms? How much of the fuel cost increase can you pass through under your PSAs?
Emmanuel Rubio
For MGen, depending on the customers, no? All of our contracts with the ECs, including Meralco, have pass-through provisions for fuel, no?
Even our RES contracts in MGen have fuel pass-throughs. That's a small volume only for MGen in the RES market.
There is no limitation with regard to how much of the fuel costs we can pass through, but as long as it's based on the agreed formula.
P.J. Ramos
All in that, Manny, what was the impact of the 36-day WESM suspension to MGen's operations?
Emmanuel Rubio
As it should be simple, because we had administered prices, we know what the prices are, given that the administered prices are based on the past four weeks, the average of the past four weeks for the same period. There was an issue with regard to line rental charges.
Some have experienced high line rental charges, some have gained from the line rental charges. There are discussions now with DOE and ERC, and I just got information that IEMOP has suspended the settlement, but hopefully in the original formula for administered pricing, line rental charges is neutral, no?
The only reason why line rental charges came out as an issue is because coal prices have been fixed at a certain price, 6 pesos, no? With that, the issue on line rental charges came out.
I think what the ERC is looking at, and this has been the position of PIPPA, is to go back to the original formula and the spirit of administered prices where line rental charges should be neutral. Take it out, no?
The gains should be taken out, the losses should be taken out. That's the results.
No impact. In fact, for coal plants, our open position has been busted because we were selling at 6 pesos.
Although the intention really of the market suspension is to bring out coal capacities, no? That's why DOE and ERC approved a 6-peso settlement for coal plant that has outside of any bilateral contract arrangements just to make sure that we limit the output of the more expensive fuels like diesels and in this case, LNG, no?
Although because of the demand, the demand was there during the suspension, the nomination has been accepted, no, for LNG PH, and we're operating with all the units in LNG PH at the time.
P.J. Ramos
Thank you, Manny. We'll check the floor for questions.
We have a question from Jelline Gaza of JPMorgan.
Jelline Gaza
Hello. Thank you for acknowledging.
I have a follow-up on what was discussed, Sir Manny, in particular, how do you balance the interest of the distribution utility as well as LNG PH as we see the mark-to-market commodity price get impacted via generation charges? I understand that there's a cap of 1 peso per kilowatt-hour for DU generation charge increase, I'm not sure if that still holds, but if that's the case, how is Meralco as a distribution utility planning to work around that cap as well as your mandate of least cost, as well as being a proponent of LNG
Emmanuel Rubio
PH? For all the output of Terra Solar to be released, no, and get Meralco to take it.
Initially we're looking at hopefully Meralco will not take the capacity, and we will sell it in WESM. No, but they did.
Everything that's coming out of MTerraSolar is being taken by Meralco, unless the prices in WESM is lower than the commissioning price that's pre-agreed with Meralco. That's the way we are balancing that capacity, and we're really bringing out all the goal during the market suspension of bringing out all the capacities that we can bring out from San Buenaventura, from PEDC, CEDC, wherever, since initially we thought that the line rental charges would be neutral, just to limit the output of LNG PH.
Given that the highest that we bought it at was at $23 per MMBtu, it has gone down now to around $16-$17, but pre-war it was $10 per MMBtu, no? I think the peak is, well, touch wood, passed us, and hopefully with the additional contracts that we've opened, no, with Gunvor, with Novatek, and with TEPCO and JERA, right, we will have access and we will have options for LNG, well, from now on.
Because we were just contracted and getting the supply from Vitol and Shell, and Vitol declared force majeure on us, right? We have to get it from other sources.
We're even looking at Russian supply, and we will be booking Russian supply, those that are not sanctioned, in not sanctioned areas like Sakhalin and Yamal. The
Jelline Gaza
nomination at LNG PH today is at what level?
Emmanuel Rubio
They told us to shut down one unit. They don't want us to shut down because just in case a coal plant shuts down, we're the fastest one to react.
Jelline Gaza
Understood. The 50-plus percent effective utilization in 1Q, was it because of an scheduled outage at LNG PH?
The implied utilization at LNG PH in the first quarter is about 50 plus?
Emmanuel Rubio
A forced outage for Excellent Energy. It's back now.
Jelline Gaza
Thank you for explaining that, Paul. My second question is on the tariffs again, Attorney Valles.
I just wanted to understand the nuances of the current discussions with the ERC, specifically the key inputs like WACC, RAB, or volumes. Are you maintaining the priorly disclosed assumptions of a certain threshold on the RAB, revaluation of RAB, as well as WACC and volumes of down 5% per annum?
Is this something that the ERC is warming about, given that discussions are already ongoing, anything that you can give us?
Jose Ronald Valles
The application has been filed with the ERC, and the breakdown of the rate that we have filed with the ERC are all in the application, we cannot change that anymore. As I mentioned last time, for example, in the regulatory asset base, we added a 25% contingency, which will likely be removed by the ERC, because that is conditioned only upon showing that the regulatory asset base has not yet been determined and approved by Meralco board at the time of the filing.
Since we have already confirmed that the regulatory asset base that we have submitted to the ERC is the final regulatory asset base, then the 25% contingency can be removed. For the others, every single centavo that we have included in the rate that we have filed, I believe made sufficient justification to the ERC, including the computation of the weighted average cost of capital.
Our witnesses have testified to the ERC, and they have been lengthily cross-examined, not only by the intervenors, but also by the ERC consultants themselves, no? I believe there is sufficient basis for the rate that we are seeking, and we're hoping that the ERC will give us a reasonable rate, considering the lapse of so many years that we did not have any price adjustment.
Jelline Gaza
How about the volumes, sir, given that currently now the base is lower?
Jose Ronald Valles
The volume that we have submitted with the ERC, again, cannot be changed anymore, but the only factor that we have not included there at the time of filing is the impact of the Middle East crisis, no? Because at the time of filing, the war has not yet started.
We have mentioned that to the ERC formally during the course of the proceedings, and we're hoping that they can take that into consideration in finally approving the level of volume that will be determined by the ERC for purposes of calculating our maximum average price.
Jelline Gaza
Thank you so much for the color. Then lastly on volumes, may we get an indication of how it was as of April, or maybe additional color on March where we have started seeing some of the energy saving measures implemented on broad level?
Is there any guidance for the rest of the year? Thank you.
Actually
Ronnie Aperocho
our report only covered the first quarter, but for for April, we're seeing a again, a lower volume. In fact, we're looking at a 4% drop versus April of last year, because April of last year still it was still a high base month.
In fact, our April 2025 sales grew by 2.8% because last year was relatively April of last year was relatively a a warmer month, because it was the tail end of the El Niño phenomenon. We're we're seeing signs of recovering already starting first quarter of first last last week of April.
In fact, we hit a the highest daily NSI, 180 gigawatt-hours, last last April 28. That momentum has been sustained as we speak because, of course, because of this relatively warmer weather.
For the month of May, we're seeing a recovery already, and take note that PAGASA has already declared a 79% of El Niño phenomenon starting June this year, that will persist up to the first quarter of next year. Because of that declaration, we have re-casted or we have revisited our forecast, and we're looking at at a 1.2% to 2% increase in our sales by by year-end compared to, of course, 2025.
We're seeing growth 2% as we speak, but hopefully if we can grow more, that there was a question earlier, what are the interventions that the DU the distribution utility is doing? What we're doing right now is we are accelerating the energization of of the service application pipeline, and we're seeing a healthy pipeline of of service applications, especially for high-load applications, meaning 5 kW and above.
In fact, for the month of April, we have energized more than 1,000 project-covered applications. That would translate to more than 100 megawatts addition in terms of capacity, and we're looking at for the remaining nine months of the year, we're looking at 900 megawatts to 1 gigawatt capacity addition out of the pipeline that we're currently handling.
Yes, we're looking at a positive positive growth this year, though in the in the vicinity of 2% to 3% or things like that.
P.J. Ramos
Thank you. To Mr.
Rubio, we have additional question here regarding the WESM suspension. Can you share the admin price range for LNG nat gas during the market suspension?
Emmanuel Rubio
LNG PH is not affected because it's contracted with Meralco. Only open positions are subjected to settlement using administered prices.
No, LNG PH is not affected.
P.J. Ramos
Thank you, EVR. Additional question from Lana of ATR AM: With the recent WESM price caps, have these had any impact on Meralco's PSAs, supply costs, or contracts with GenCos?
Emmanuel Rubio
It's contracted bilateral contract, the prevailing price would be the agreement between the supplier and the customer. I'll add to this LNG PH, no?
We're also, of course, participating with about 60 megawatts of regulating up and regulating down in LNG PH. That one is operating in the spot market.
When it was suspended, in fact, with the market suspension, we have an idea of the pricing. We have an idea of how settlement would be because it's based on the average of the past four weeks for that period.
We know when we're going to make an offer where we can actually be accepted by NGCP. That's a positive for LNG PH as well.
Jose Ronald Valles
I don't know the numbers exactly, no, but for our PSA, if there's a cap on the WESM and we are required to source from the WESM, either because of outages, forced outage or scheduled outage, and assuming the power supplier has already exceeded the allowance, then we pay only the lower of the PSA price and the WESM price. If the WESM price is lower because of the cap, then that is the effect on Meralco PSA.
I'm not sure whether there is future recovery by the generators because the capping is based on an intervention by the ERC.
Ronnie Aperocho
Thank you, Attorney Valles. Manny made mention about this line rental issue, but I think somehow our customers are protected with that because most, if not all of our PSAs have this cap in terms of line rental.
It's not a full pass-through, things like that.
P.J. Ramos
Thank you for that. We'll go back on site.
Do you have any questions? We go back online.
There's a question from Julian Rojas of PEP: What is the CAPEX guidance for PowerGen in 2026?
Emmanuel Rubio
I think we've shared already the CAPEX amount for Terra Solar, no, up to phase two that we need to still buy land and pay for the additional batteries. I'll get the numbers in a minute.
I'll say it later on.
P.J. Ramos
Thank you, EVR. We have a question on MTerraSolar and renewables execution: How does BESS improve returns and dispatchability of solar assets?
Emmanuel Rubio
The BESS will improve the returns depending on the price that you're selling it at, right? I think, well, given where we are today with NGCP already complaining with regard to the variability of solar-only installations, now DOE has mandated that future solar projects will always have at least 20% energy storage capacity behind it, right, to at least smooth in the variability of that solar project.
In our case, if we can actually make a case for a mid-merit supply, no, I don't think we can already look at a baseload using variable and energy storage, but for mid-merit, we're looking for another project, no, but much smaller than Terra Solar, which is Terra Solar 2, and we're looking at land of around 800 hectares, and we can probably close out the option to acquire this land by end of the year. Sorry, the CAPEX for this year is 109 billion pesos.
P.J. Ramos
Thank you, EVR. We have a question regarding RES.
On RES competition and pricing changes, can we talk more about it, given the recent sector developments?
Emmanuel Rubio
Depending on the generation that's backing up that RES. I don't think there's any RES now that's just trading using balance sheet, I think it's too risky.
For One Meralco, we're working together with MPower, no, providing also the generation assets that we have to support their contracts, especially for Vantage, no, when they enter into a contract in Cebu, for example. We'll be looking at providing them capacity using CEDC or PEDC.
I think what's good for contestable customers is that we're seeing really competitive rates, good for the customers. Meralco's neutral about it because it's the same kilowatt-hour passing through the Meralco lines.
Customers will pay the same pesos per kilowatt-hour. What is at risk, of course, is the generation side, no?
When there's enough capacity that has been lost, say, by the distribution utility, in this case Meralco to retail, then there will come a time probably that they will be looking at carving out contracts, no? I've seen that when I was with the other company in Cebu where our generation was carved out, no, by the customer DU when there was a deep penetration of retail customers moving to retail suppliers.
For now, I think this is good for the contestable market and really getting its objective of providing competitive energy for contestables.
P.J. Ramos
Thank you, EVR. I don't see any more questions online.
We'll check on site. We have another question from Jelline Gaza.
Jelline Gaza
Sir Manny, just as a quick clarification, how much of your coal capacity domestically was exposed to the spot during the time of WESM suspension?
Emmanuel Rubio
It's PEDC, CEDC, and Toledo. Our price forecast for Cebu was high WESM prices that we decided to leave around 30% of our capacities to the spot market.
Having said that, out of that 30%, we're also offering it to what is certified by NGCP to regulating up, regulating down, and contingency reserves, no? We believe that that's the optimum capacity, but now just to avoid the volatility, we're also providing some energy to Vantage in serving their customers about 45 megawatts to going up to about 82 megawatts.
Yes,
Jelline Gaza
sir. Just to round up the CAPEX discussion earlier, do we have an updated budget for the distribution business for the full year, Miss Betty?
Betty Siy-Yap
Jelline, we'll probably have that by the first half. Given all the changes,
Jelline Gaza
yeah. Miss Betty, how much was it before, 20 or 30 billion
Betty Siy-Yap
for
Jelline Gaza
the old budget for distribution?
Betty Siy-Yap
Just distribution?
Jelline Gaza
Wait,
Betty Siy-Yap
our full year last year was Wait, let me try to check. Last year was 11 billion 50 Wait.
Jelline Gaza
Last year was at 28.5 billion. For the DU.
Betty Siy-Yap
It's going to be slightly higher. The original is a little bit over 30.
Jelline Gaza
Thank you, Miss Betty. Lastly, Sir Manny, can you talk about LNG supply and your procurement, how far along are we secured in terms of deliveries?
Emmanuel Rubio
There is so much variable is getting dispatched during the day, although in the evening, it goes up anywhere between 9 to about maybe 15, 16 pesos, no? To me, that's not telling us that there's diesel that's coming in.
I think it's exposed coal plants that are trying to make up for not getting dispatched during the day and recovering during the evening. We're really seeing the duck curve manifesting already, and we were expecting this, given that the target of the government is to really push more renewable energy into the grid.
Mind you, we're just dispatching 250 megawatts of Terra Solar. Once we are in by mid-May when we have 750 megawatts, that's going to reflect in the spot market.
Already premium?