Hecla Mining Company

Hecla Mining Company

12.38
EUR
-0.20
(-1.59%)
0.67EPS
31.02P/E
9.08BMarket Cap
Nov 11Next Earn

Q1 FY2026 · Earnings Call TranscriptMay 6, 2026

Operator

Hello everyone. Thank you for joining us, and welcome to Q1 2026 Hecla Mining Company earnings conference call.

After today's prepared remarks, we will host a question-and-answer session. If you would like to ask a question, please press *1 to raise your hand.

To withdraw your question, please press *1 again. I will now hand the conference over to Mike Parkin, Vice President of Strategy and Investor Relations.

Mike, please go ahead.

Mike Parkin

Thank you, Hilary. Good morning and thank you for joining us for Hecla's first quarter 2026 results conference call.

I'm Mike Parkin, Vice President of Strategy and Investor Relations. Our earnings release that was issued yesterday along with today's presentation are both available on our website.

On the call today with us is Rob Krcmarov, President and Chief Executive Officer; Russell Lawlar, Senior Vice President and Chief Financial Officer; Carlos Aguiar, Senior Vice President and Chief Operations Officer; Brian Erickson, Vice President of Operations; Kurt Allen, Vice President Exploration; Matt Blattman, Vice President Technical Services; as well as other members of our management team. At the conclusion of our prepared remarks, we will also be available for questions.

Turning to slide 2, cautionary statements. Any forward-looking statements made today by the management team come under the Private Securities Litigation Reform Act and involve risks as shown on slide 2, in our earnings release, and in our 10-Q filing with the SEC.

These and other risks could cause results to differ from those projected in the forward-looking statements. Non-GAAP measures cited in this call and related slides are reconciled in both the slides and the news release.

We've also published our 2025 Sustainability Report earlier this week, which is available on our website. Please note, as we discuss financial figures and projections throughout this presentation and in the earnings release, we are referring to our continuing operations unless otherwise noted.

This reflects the sale of the Casa Berardi operation that closed at the end of March. I will now pass the call over to Rob.

Rob Krcmarov

Thank you, Mike. Good morning, everyone.

Before I get into the quarter, I want to take a moment to acknowledge where we stand as a company right now because I think the context matters. 18 months ago when I joined Hecla, this company carried nearly $550 million of net debt.

Today, we carry no long-term debt, none. That transformation and what it unlocks for shareholders is really what this call is about.

Turning to slide 3. Hecla enters the second quarter of 2026 in the strongest financial and strategic position in the company's recent history.

As North America's premium silver producer, we've got six core attributes that really distinguish us from our peer group: a silver legacy stretching back to 1891; operations exclusively in the United States and Canada; peer-leading silver exposure in both revenue and reserves; a reserve life roughly double that of our peer group; and a deep and advancing project pipeline; and also a cost structure that positions us as the lowest cost producer in our peer group. These all help to support our premium valuation and make us a premier destination for silver investors.

Turning to slide 4. The Casa Berardi sale in March was a deliberate, well-timed decision.

We harvested the cash flows to that point, secured substantial value, including a 9.9% equity stake in Aurzone and the deferred cash consideration, and we freed ourselves to do what we should be doing: directing our capital and management's attention towards our silver growth platform. Then on April the 9th, about 4 weeks ago, we redeemed our final $263 million of senior notes.

Hecla is now free of long-term debt for the first time in many, many years. We have a fully undrawn $225 million revolving credit facility and a cash balance that's building on strong operating performance in this silver market.

What excites me is what comes next across the portfolio, from the Greens Creek pyrite concentrate circuit and tailings reprocessing project to the Midas restart opportunity in Nevada. We have a set of organic value creation opportunities that are compelling because of what they share in common.

Each is screening to have lower capital intensity than a conventional mine development. Though that assessment remains subject to ongoing evaluation, particularly for the earlier-stage projects.

That means the potential for robust returns on invested capital and real per-share value creation. We believe in this value, and we're working hard to unlock it.

Beyond these near- to medium-term opportunities, I am very excited about our 2026 exploration program, representing a near doubling of exploration investment from 2025, which could be the thing that reshapes the long-term picture of this company. Turning to slide 5.

The numbers this quarter, they speak for themselves, and I'm proud of what this team has delivered. Revenue from continuing operations exceeded $410 million, that's up 13% from the prior quarter and double what we generated in Q1 2025.

Record adjusted EBITDA of $265 million and record consolidated free cash flow of $144 million with every single mine free cash flow positive, every one. We produced 3.9 million ounces of silver, roughly 3% more than the prior quarter.

Cash costs are nearly -$3 per ounce and all-in sustaining costs below $10 per ounce. At today's silver prices, those are exceptional margins.

The quality of those margins reflects how the transformation of this business is showing up in the numbers. Turning to slide 6.

Slide 6 puts our production outlook in perspective. We're guiding to 15.1 to 16.5 million ounces of silver in 2026, a strong operational baseline.

What I want you to see is the trajectory beyond that. Our project pipeline supports a potential pathway to 20-plus million ounces annually, and that's driven by Keno's gradual ramp to 440 tons per day and the potential restart of Midas in Nevada.

Beyond that, a potential Keno Hill expansion and possibly more growth from the Aurora and Hollister mines in Nevada, as well as the Libby project in Montana. Before we get to Midas, there are two near-term opportunities associated with our flagship Greens Creek mine in Alaska that I'm particularly excited about.

I want to make sure that they get the proper airtime today. Brian Erickson, our VP of Operation, he'll give an overview on those and then give you an update on the Midas restart project.

Brian, over to you.

Brian Erickson

Thanks, Rob. Turning to slide 7.

First, I'll discuss the Greens Creek pyrite concentrate circuit, which is a new project that we're introducing to the market. We're evaluating the feasibility and economic potential of developing a pyrite concentrate circuit at the Greens Creek mill.

If successful, this project would generate additional marketable concentrate stream, boosting overall silver and gold recoveries from the mill while potentially reducing the mine's reclamation liability significantly. There's also additional upside through potential reserve expansion as the inclusion of lower-grade silver and/or sulfur blocks could grow the underground mineral reserve.

The project's currently estimated to be low in capital intensity and could provide cash flow in about two years. We expect to provide another market update on this project in late 2026 or early 2027.

Second, Greens Creek tailings reprocessing project. We introduced this project to the market during our Investor Day this past January in New York.

I want to be clear about where this sits today. We're still in the evaluation stage and we'll make a development decision once the test work is done.

What makes this project compelling is what's sitting in the dry stack facility at the site. An estimated 10.4 million tons containing an estimated 50 million ounces of silver and nearly 600,000 ounces of gold, along with several other critical minerals.

At year-end 2025 prices, the gross metal value of what's in the facility was approximately $6.8 billion. I stress gross value because that's before recovery rates, processing costs, and the capital required to actually extract the metal.

We have a third-party partner advancing phase three metallurgical test work, which we expect to complete around mid-2026. That test work, along with confirming a suitable processing facility, is what will determine whether and how we move forward with this work.

Early results have been encouraging and the indications are that this doesn't require the kind of capital you'd need to build a new mine from scratch. We'll have more to say on that once the test work's in hand.

On top of the potential cash flow, reprocessing the tailings has the added benefit of potentially reducing the mine's long-term reclamation liability, turning what is currently a liability into a source of value. Finally, the Midas restart project in Nevada.

As Nevada is considered one of the best jurisdictions in the world for mining, and we have three highly compelling projects in the state that we're planning to advance this year through exploration and other work. Midas, the most advanced of the three, is a historically high-grade silver operation, gold as well, we acquired as part of the Klondex transaction.

It has fully permitted infrastructure that meaningfully reduces the capital required to bring the asset into a cash flowing state. We're evaluating a hub-and-spoke operating model where ore sources from multiple regional properties, including the nearby Hollister project, are transported to and processed through the existing 1,200 ton per day permitted mill.

The site also has an adjacent permitted tailings facility with approximately 15 years of storage capacity. We've allocated $16 million to Nevada exploration in 2026, more than three times last year's investment.

Kurt will give you an update on the latest drilling results in a moment. Our goal is to establish a resource big enough to warrant investment in a restart.

Let me be clear, at the grades we're hitting, the target is well below a million ounces of gold equivalent to get started. This targeted resource is expected to form the basis for a restart PEA.

I'll now turn the call over to Carlos for the operations review.

Carlos Aguiar

Thank you, Brian. Before I walk through the mines, I should mention that we have reiterated our production and cost guidance for the year.

You can find that summary on slide 22. Turning to slide 9, starting with Greens Creek, in the first quarter, the mine produced 2.2 million ounces of silver and 13,000 ounces of gold.

Total cost of sales came in at $82 million with cash cost of negative nearly $12 per ounce and AISC of -$8.39 per ounce, both after by-product credits. Those are best-in-class numbers, and they reflect the strong by-product revenue we are getting from gold, zinc, and lead.

Cash flow from operation was $131 million and free cash flow was $126 million, a very strong quarter. One thing worth highlighting operationally, Greens Creek set a record for underground backfill placement this quarter, placing nearly 164,000 tons, which is 16% above the 2025 quarterly average.

That's a meaningful achievement because it give us more operational flexibility and better ground stability as we move through the rest of the year. Turning to slide 10, Lucky Friday produced 1.2 million ounces of silver in Q1.

Total cost of sales was $49 million, cash cost were $12.07 per ounce, and AISC was $23.78 per ounce, both after by-product credits. Free cash flow was $49 million.

On the operating side, throughput was up 10% over the prior quarter, although that was partially offset by 11% decline in the mill grade. That's a fairly typical outcome given the grade variability you naturally see at Lucky Friday, and we do expect average silver grade to improve in the second quarter.

On the surface cooling project, construction is 81% complete and we are on track to finish by mid-year. This is an important long-term investment.

It's designed to expand cooling capacity over the mine's roughly 15-year reserve life, we can continue mining safely and productively at depth. Turning to slide 11 11, at Keno Hill, we produced nearly half a million ounces of silver in Q1, and free cash flow was $15.3 million.

I want to point out that this marks four consecutive quarters of positive free cash flow at Keno Hill, demonstrating profitability at current throughput rates and silver prices. Production in Q1 was impacted by two things: reduced power supply from Yukon Energy Corporation due to the extreme cold weather that carried over from Q4, and lower silver grades as we mined through a lower grade zone of the Birmingham deposit.

The good news is both of those headwinds are behind us. We expect mill grades to improve in Q2 as we shift into higher grade areas, and the power constraints have been resolved.

With that, I will hand it over to Russell for the finance update.

Russell Lawlar

Thank you, Carlos. As we turn to slide 13, let me take you through our financial results.

As Mike noted in the cautionary statements, what I'm about to discuss is based on results from our continuing operations, meaning that the impact from our sold asset Casa Berardi is excluded from these figures. The first quarter was record-setting for a number of financial metrics.

Revenue from continuing operations was more than $100 $410 million, up 13% over the prior quarter and double the level from the first quarter of last year, reflecting continued operational execution and significantly higher realized silver and gold prices. As you can see on slide 13, 73% of our revenues came from silver, and all of that revenue came from either the United States or Canada.

This fundamentally sets Hecla apart from peers in both categories, and provides significant value to our shareholders. What is more important, though, is the return on these revenues.

As you can see from the graphs on the bottom of this slide, we realized a margin of 90% of the realized silver price during the quarter, which is truly phenomenal. This margin translated to substantial free cash flow from all our mines, which, as expected, was led by Greens Creek at nearly $126 million for the quarter.

However, Lucky Friday was also impressive at almost $50 million, while Keno Hill generated $15 million, even though it's still in the ramp-up stage. I'll speak more about how we'll allocate this capital in a couple of slides.

Turning to the balance sheet, we ended the quarter with $588 million in cash and total debt of $266 million, resulting in a net cash position of $321 million. This is a significant strategic inflection point and a significant milestone.

The chart on this slide in the upper right-hand corner illustrates just how dramatically this picture has improved in a fairly short period of time. As Rob mentioned, and something that materially de-risks this company and adds substantial shareholder value, after quarter end, we redeemed our remaining $263 million of senior notes, leaving Hecla with no long-term debt for the first time in many years.

We now carry a fully undrawn $225 million revolving credit facility with a $75 million accordion, representing the strongest balance sheet in the company's recent history. Turning to slide 14, I'd like to turn our attention to what the entire suite of assets can do over time at different price decks.

The chart you see on the slide has been updated for Q1 results and illustrates projected 2026 consolidated free cash flow across a range of silver and gold prices. At $100/oz silver and $5,500/oz gold, we project over $900 million of consolidated free cash flow for the full year.

At price assumptions of about where we are today, $75 silver and $4,500 gold, we project over $700 million. This incredible cash generation capability provides substantial flexibility and strategic alternatives we'll discuss on the next slide.

Our capital allocation framework on slide 15 reflects a disciplined, priority-ordered approach. Safety and environmental excellence comes first.

It is the foundation of our license to operate, and investment in these priorities is non-negotiable. As we move to investing in sustaining and growth capital, where we see target returns in the 10% to 15% range, these investments are the lifeblood of our company, and provide future value for further investment.

We'll hear from Kurt in a minute on exploration. However, our potential to add shareholder value through the drill bit is exceptional.

We've increased our investment this year as we've de-risked our balance sheet, freed up cash flows, and would expect, with success, the potential to continue to increase these investments in the future. I discussed the balance sheet strength and deleveraging and the value this brings to our investors on the previous slide.

However, we will continue to add cash to our balance sheet while maintaining high-quality investments in our business. Strategic investments are evaluated on return on invested capital and per-share accretion basis, but do not come around often, and thus we need to maintain a strong balance sheet to be able to make these investments when those opportunities arise.

Additionally, considering our best-in-class mines with long lives, low cost, and the best jurisdictions, we don't feel rushed to make any strategic investments now, but will be in a position to do so when the time comes. Finally, shareholder returns round out the framework.

With a debt-free balance sheet and record free cash flow, we're focused on securing a cash balance capable of funding our project pipeline and surfacing value for our shareholders. As we do so, we'll begin to consider capital return to our shareholders.

We currently have a share repurchase plan which has been board approved for 20 million shares. I want to put that in context for a moment because I think it speaks to something that distinguishes Hecla from our peer group.

Our peers have pursued growth aggressively through M&A over the past 5 years, deals that diluted their shareholders by more than 50% in some cases. Hecla's share count has grown at a fraction of that rate.

The result, on every per-share metric that matters, silver production, reserves, revenue, we rank first among our peers. We're the only silver producer in our peer group to have grown silver production per share over that period.

That's the discipline we intend to carry forward. As we accumulate cash, and if we see dislocation in our value versus the underlying fundamentals, we won't hesitate to deploy capital through buybacks, as long as it meets our return on capital criteria.

I'll now turn the call over to Kurt for the exploration update.

Kurt Allen

Thank you, Russell. Turning to slide 17, 2026 marks a transformational year for Hecla's exploration program.

We're investing $55 million in exploration and pre-development, which is an all-time record. We've structured the programs across three priority areas, and I expect more and more activity across a number of sites as we move into the warmer months.

At our producing assets, we're aiming to more than replace reserve depletion, and I'm very excited about our Nevada growth projects, with drilling ongoing at Midas, starting up at Hollister in June, and at Aurora in July. The Aurora gold and silver project in western Nevada really has me most excited.

It's earlier staged than Midas, but arguably carries the greatest long-term discovery potential, with historic grades averaging over 2 ounces per ton gold equivalent, and seven drill-ready targets now defined across a large land package. Aurora has the hallmarks of a district that has been underexplored rather than exhausted.

Critically, Aurora has its own 600 ton per day permitted mill on site, which means that if exploration delivers a compelling resource, the capital threshold to production is materially lower than a blank sheet development. While I have been to Aurora multiple times, Rob has recently visited the project, and we're both very eager to see our initial drill targets tested.

Turning to slide 18. Our follow-up drilling on the Sinter Offset vein at Midas continues to build our understanding of this high-grade gold and silver system.

Drill hole DMC-476 returned 0.21 ounce per ton gold, 1.6 ounce per ton silver over 2.3 feet, extending the known vertical extent of narrow, high-grade mineralization along the Sinter Offset structure to more than 500 feet. We've now defined the strike length of this structure over 1,350 feet, and drilling will continue to step out to the southeast, where the structure remains open, as well as to the northwest.

Two additional holes also intercepted parallel, high-grade structures, reinforcing the prospectivity of this area. We will be providing regular exploration updates throughout 2026.

I'll now turn the call back to Rob for closing remarks.

Rob Krcmarov

Thank you, Kurt. Let me start with the market, because it really sets the stage for everything else.

Recently, the World Silver Survey was released and it confirmed 2025 as the fifth consecutive year of supply deficit, with cumulative stock drawdowns now exceeding 700 million ounces since 2021. That's the kind of structural tightness that doesn't resolve overnight, and we're not seeing new mine supply coming online in any meaningful manner over the medium term.

Prices have been volatile year-to-date, that's the nature of this market, but the gold to silver ratio sits around 65 to 1 today, well above the trough that we saw in the last silver bull market. History tells us that ratio compresses as silver outperforms.

We don't know exactly when that's going to happen, but what I do know is that Hecla, debt-free, with record free cash flow, and the best silver exposure in the sector, is a really compelling way to be positioned for when it actually does. The six attributes on this slide, legacy, jurisdiction, silver focus, reserve life, project pipeline, cost structure, they're not just a list, they're the result of deliberate choices made by this team over the past 18 months.

I believe they represent a differentiated investment case that the market will increasingly recognize: debt-free, record free cash flow, clear organic growth pathway at low capital intensity. We're just getting started, and I look forward to keeping you updated throughout the year.

I will now ask the operator to open the line for questions.

Operator

We will now begin the question-and-answer session. If you would like to ask a question, please press *1 to raise your hand.

To withdraw your question, please press *1 again. We ask that you pick up your handset when asking a question to allow for optimum sound quality.

If you are muted locally, please remember to unmute your device. Please stand by while we compile the Q&A roster.

Your first question comes from the line of Heiko Ihle from Wainwright. Heiko, your line is now open.

Heiko Ihle

Hey, good morning, Rob and team. How are you?

Rob Krcmarov

Good morning, Heiko. Well.

Heiko Ihle

Given the current commodity price environment, are there any longer-term capital projects that you are now more inclined to undertake at any of your currently operational sites, say in 2027 and beyond? You've mentioned a bit about the pyrite concentrate circuits and the tailing reprocessing project, but other things that maybe are not yet built into analysts' models on a 3-year plan maybe?

Rob Krcmarov

Thanks for the question, Heiko. Not really.

We've basically highlighted the projects that we are focused on in the next several years. Some of them are obviously shorter term, like the pyrite concentrate project, which Carlos spoke about.

That's very near-term opportunity, perhaps coming on in the next couple of years. Beyond that, nothing really longer term unless we have spectacular success at Aurora.

Operator

Thank you for your question.

Heiko Ihle

Oh yeah, sorry. Thank you.

Operator

Thank you very much for your question. Your next question comes from the line of Wayne Lam from TD.

Your line is now open.

Wayne Lam

Hey, thanks. Morning, guys.

Maybe just curious at Keno Hill, can you remind us on what the permits are that are outstanding there that are limiting you from ramping up throughput? If I recall, was that just on the back end capacity with the dry stack tailings?

Just wondering with the potential resolution of the Victoria Gold sales process recently announced, do you view that as maybe providing some visibility to permitting that would allow you to ramp up the mining rates there?

Rob Krcmarov

Thanks for your question, Wayne. On Victoria Gold, it doesn't really affect us other than at some point, when they're ready, they're going to be competing for a little bit of permitting bandwidth.

I don't expect anything's going to happen there in a hurry. Some of the outstanding issues there, the leakage that's still happening that needs to be resolved, a robust relationship like the one we have with the First Nation, Na-Cho Nyak Dun, that needs to be established, all that credibility.

Vic Gold, I can't see that really affecting us in the short term. On the permits question, I have Patrick Malone, he's our VP of Sustainability.

I'm just going to defer to him because he's been very heavily involved with him and his team, and he's built out a team there to assist us in our permitting endeavors. Patrick?

Patrick Malone

Thanks, Rob. Keno Hill's permitting path involves two processes.

First, we have to submit a project proposal to YESAB, which is the Yukon Environmental and Socio-economic Assessment Board. We expect to do that by the year-end.

Then YESAB takes about 12 months to complete its review, after which we'll submit two permit applications: the QML, which is quartz mining license, and a water license for amendment. Those amendments are really about removing some of the long-term constraints.

Those constraints include constraints on waste rock, on tailings, and on water treatment, as well as some other things like power and camp space. Our current estimate is that the amended permits could be received sometime around mid-2029, although of course there's variability around permitting.

In the short term, between now and the time we receive those permits, there are a few constraints that continue to hold Keno Hill back. In the near term, we need approvals on our Phase 2 West tailings from the regulators, which would allow us to expand the Phase 2 tailings.

Then after that, waste rock potentially becomes a limitation under both the QML and the water license. Receiving these long-term permits in mid-2029 2029 is critical to our long-term success.

We are running up against waste production limits and storage capacities in the near term, but we're actively engaged with regulators to get some short-term relief until we receive those permit amendments.

Wayne Lam

Thanks. I guess, I know you guys had previously outlined a very gradual phased ramp-up there, I guess there's no potential to kind of fast-track the ramp-up of development on, say, Bermingham or Flame & Moth or some of the infrastructure items, so that when you get the permits, you'd be in position to quickly accelerate to four, the 440 permitted rate or even 600 imminently?

Rob Krcmarov

The 440 rate, it's going to be a gradual ramp-up. Again, it's a sequence of permits.

In the meantime, we need to manage the water, the more development you do, the more water you expose, the more water you need to treat. All these things are tied in.

I can't see that there's really a way to meaningfully accelerate this project. I would say there are some risks with permitting, but I would think of any potential let's call it a curtailment as really a bridge problem.

It's not an asset problem. The reserves don't change, obviously if there is a delay that's got time value of money impact on IRR.

We have a 16-year reserve life. We have very, very strong economics even at $30 silver, that doesn't go away.

Our focus again is on that permitting work that keeps us running. Again, I'd note what we talked about earlier in this call, $15.3 million in free cash flow in Q1.

That's the trajectory that we're protecting. Really, it's really all about the permitting and getting ready to ramp up to 440.

On the 600 tons per day, and beyond, that's really future. That's going to require a whole new wave of capital investment and additional permitting.

We're not focused on that. We're really focused on the here and now.

Wayne Lam

Understood. Thanks.

Then maybe just with the high-yield notes paid down, obviously the balance sheet is in pretty great shape. Obviously in a very different market, you guys had previously rolled back the silver-linked dividend component.

Just in the context of your peers now increasing capital returns and linking those returns to cash flows, is that something that we could see sometime soon with a similarly linked component given the cash generation projected ahead?

Russell Lawlar

Thanks, Wayne. All right, this is Russell.

I can take that. Certainly in our prepared remarks, I mentioned that we are looking at capital returns, but what we do believe is that investment in our business brings better returns than it does in terms of shareholder returns.

However, we do have a strong balance sheet, like you said, and we have deployed significant cash to debt redemption as compared to, if you look at our peers, many of our peers have refinanced or kept the debt on their balance sheet. We have a little bit of a different strategy there trying to return long-term shareholder value that way.

We will be discussing with our board how and what our return on investment strategy should be, or return on capital strategy should be. I would say stay tuned to that.

We'll continue to discuss that with the market as time goes along. We want to make sure that we adequately fund all of the growth opportunities that we have internally because that's really where the value is created in this business.

Operator

Thank you for your question.

Wayne Lam

Thanks, guys.

Operator

Your next question comes from the line of Cosmos Chiu from CIBC. Your line is now open.

Cosmos Chiu

Hi. Thanks, Rob and team.

Maybe my first question is a follow-up. Rob, in the MD&A, you mentioned that the 440 tons per day at Keno Hill is a medium-term target, but it sounds like what is medium term?

It sounds like you might need the permit. Is medium term 2029?

You're not going to be able to hit the 440 tons per day until you get those permits sometime in 2029. Am I reading that correctly?

Rob Krcmarov

Patrick pointed to a couple of key permits that we really need to get by 2029, and until we get those, that would It remains a challenge between now and the time we get our permit amendments. That really unlocks the value, and we're expecting that to be mid-2029.

Cosmos Chiu

Got it. Understood.

Then maybe at Greens Creek, and maybe elsewhere as well, I saw that there was a bit of inventory build-up. There was inventory build-up last quarter.

I think you're kind of working through it, for example, the silver and zinc is now kind of sales is equating to production, but precious metals, you're working it through, but you haven't completely worked through some of that inventory build-up yet. Lucky Friday sales were lower than production in Q1.

I guess holistically, my question is what's causing the inventory build-up? When do you think you can kind of work through some of that through sales in subsequent quarters, and how long is that going to take?

Russell Lawlar

Thanks thanks, Cosmos. I'll I'll take that question.

In terms

Cosmos Chiu

of the inventory,

Russell Lawlar

Good morning. In terms of the inventory and the accounts receivable, keep in mind that at Greens Creek, we, we have our own deepwater port that we that we, kind of control.

That's actually a huge strategic asset to us, but what that means is our shipments go out generally once a month, and they're very lumpy. Just depending on when the ship leaves the port, you may have inventory that's sitting at the port, or you may have AR that's sitting in your accounts receivable.

We we do have opportunities to advance the receipt of accounts receivable, but when we take a look at it, especially with the balance sheet that we have, it's really accretive to our investors for us just to wait and get those funds in the normal course of business. That's what you've seen probably more in the past maybe year than you had previously is that we're making those decisions with a longer-term view than we have previously because of the lack of debt and the, less leverage, that kind of thing.

I would suggest it's really a timing difference, and quarter to quarter, it's going to be challenging to try to determine exactly when those ships will leave and and when they will and when that AR might be collected. What I would say and is that, the accounts receivable that we had on our books as of the end of the quarter was really collected in the in the next 30 days mostly.

We also see because we're concentrate producers, as the price of silver goes up, we'll we'll settle those the pricing on shipments will be a future month, we see the the value of the accounts receivable go up as well, so that's part of what you're seeing in accounts receivable. As it relates to Lucky Friday, we generally ship just on a on a monthly basis, or sorry, monthly, weekly basis, and therefore, it just kind of depends on when during the week the month falls is as determines on what the AR or the inventory is.

Cosmos Chiu

Great. I'm going to ask my questions before I get cut off by the operator here.

Then in terms of Greens Creek, it sounds like certainly very interesting in terms of different projects that you have in place, and it's good that you've announced the pyrite concentrate project as well. I guess my question is in terms of return on invested capital, what kind of hurdle rate are you looking at in terms of some of these projects here, if you can share with us?

Then in terms of the pyrite concentrate project, again, to the extent that you can share with us, any potential sort of penalty elements in that concentrate, and what's the market like right now for that pyrite concentrate?

Rob Krcmarov

In terms of return on invested capital, we haven't isolated it for that particular project, but I would expect it would be very compelling, just given that it's a fairly low-capex project. I don't know what a circuit costs.

I'm going to guess around Matt, $40 million or something? $50?

Matt Blattman

Good starting point.

Rob Krcmarov

Yep. I would expect the return on that investment to be really, really quite compelling.

Again, our corporate target is 12% to 15%, and this will easily fit in that. With regards to the pyrite concentrate market, my understanding is very, very strong, and that's why we're looking at it.

This unlocks potentially more reserves as well as contributes to revenue.

Russell Lawlar

The only thing I'd like to add to that, Rob. Cosmos, we've run these things internally, but we're very early in the process.

What I don't want to do is give a specific number that we would have to reel back because we have got a lot of work left to do. In the work that we've done and we look at the treatment charges that we're modeling, we're being conservative in terms of both the charge that we would pay as well as the refining charge for both gold and silver, and the payabilities.

Even with those, what I would hope will be conservative, but maybe long-term treatment charges and refining charges, it's still very, very compelling. I think that's probably about all of the detail that we have right now until we are able to do a bit more work and really put a holistic study around it.

Rob Krcmarov

The other thing I forgot to mention is that it also reduces our reclamation liability. Multiple benefits here.

We're very excited about this project and also the fact that it's low capital intensity and near term.

Cosmos Chiu

Yeah. Then if you do get the go-ahead for it sometime down the road, all these projects can happen concurrently, right?

In terms of the tailings recovery, the pyrite concentrate. Again, not saying that in terms of timing, it's going to coincide exactly, but if that's the case, they can happen concurrently.

Rob Krcmarov

Spot on, Cosmos. We are working on both streams.

No, fully understand. Yeah.

Absolutely right. We're working on both streams.

They're not going to all land at the same time. The pyrite cons obviously are much shorter term.

Just to remind you, the tailings reprocessing, our Phase 3 testing is underway at the moment. The samples have arrived in the laboratory.

If we get success on that, we'll update the market later on this year. The next stage would really be progressively scaling up to a pilot plant potentially and then scaling up beyond that.

That's earlier stage. It's probably not going to deliver beyond the potential delivery of the pyrite con, but we're working on both of them at the same time.

Cosmos Chiu

Great. Thanks, Rob, Russell, and team for answering all my questions.

That's all I have. Thank you.

Rob Krcmarov

Thanks for your questions, Cosmos.

Operator

Your next question comes from the line of Alex Terentiew from National Bank. Alex, your line is now open.

Alex Terentiew

Good morning and congrats again on another good quarter. I just want to follow up just on the Keno Hill.

Sorry, can you guys hear me?

Rob Krcmarov

I can now, yeah.

Alex Terentiew

Oh, okay, I'm not sure what happened there. I want to follow up on the Keno Hill.

To get to the 440, you're talking about mid-2029 to get those permits. You previously talked about slowly ramping one up over the next few years.

Is that still the plan with that timing or should we just kind of assume more steady state until then?

Patrick Malone

Hi, Alex, it's Patrick Malone. I think we're looking at more steady state.

Some of that will be dependent on ongoing discussions with the regulators, trying to provide a short-term relief. I think you can expect steady state or, in some cases, maybe slowing down a bit to make sure that we're maintaining capacity.

Alex Terentiew

That's great. Thanks.

My next question, I know you noted you're going to have some discussions with your board on capital return strategy here. You did mention also you have a share buyback in place.

Is this something that you plan if you decided yet to have a program buy in place or just be a bit more opportunistic? Or how are you approaching that scenario?

Russell Lawlar

I would suggest we need to discuss that with our board and ensure that we're all aligned on a holistic strategy. I would also suggest that any investments that we do make from a shareholder return perspective still have to meet the return on investment criteria that we've outlined for investments that we make in our business as well.

We'll be looking at it from that perspective.

Alex Terentiew

Okay. All right, no, that makes sense.

Last question if I may, Greens Creek had another really good quarter here, I think beat my numbers at least based on grade. If you look at annual guidance, this was above 25% anyways, I don't know what the exact math was.

My question here is was that in line with expectations, those better grades? Or are there any planned downtimes or lower grade phases that we could expect for the rest of the year?

Just kind of wondering is there room for the guidance to possibly even be improved a little on that mine if you are hitting better grades than expected?

Carlos Aguiar

We are reiterating our grade and our cost for Greens Creek, and we are expecting similar grades for the remaining of the year.

Alex Terentiew

Okay. All right, that's good to see.

Thank you. All right, guys, that's it for me.

Thank you.

Rob Krcmarov

Thank you, Alex.

Operator

Thank you for your questions. Your next question comes from the line of John Tumazos from John Tumazos Very Independent Research.

Your line is now open.

John Tumazos

Thank you for taking my question. How should we compare the new Midas mine to the old one that Dr.

Ken Snyder and the team started up? Should we think of it as 500 tons a day, half an ounce gold, 10 to 1 silver?

Might the tons be more?

Rob Krcmarov

Thanks for your question, John. I would say it's almost certainly going to look different from the old Midas mine.

Two things there: the starting resource at Sinter, which I've flagged previously, is roughly between 180 to 200,000 oz at very high grades. It is a narrower ore body.

The extensions that Kurt and his team have found are again narrow and very high-grade. The mill is rated at 1,200 tons per day, so that's what we have to play with.

We're looking at potentially multiple ore sources from the Sinter. We're also re-looking at any potential remnant mining at Midas itself.

That's a study that's underway. You recall that Midas was closed at a significantly lower gold price than where we are today, there's potentially some wins there.

I guess what I'm saying, John, is that we have potentially multiple ore sources, and it's not going to look exactly like the previous Midas operation. The one thing that is constant is that there is a permitted limit on 1,200 tons per day for the mill.

John Tumazos

Thank you. I'm unfamiliar with Aurora.

Could you tell us whether it's open pit heap leach target, what the range of grades might be, whether it's got much silver in it, or whatever we know thus far about Aurora?

Rob Krcmarov

Thanks for that. I'm going to ask Kurt to chip in in a minute, but I have to say, as Kurt pointed out, I went out to Aurora about 4 weeks ago.

Now I'd heard Kurt talking very excitedly about Aurora in the past and I had to work to get him focused on Midas, which he's also excited about. When I went out there, I get it now.

You walk around on the surface and there are historic open pits, historic undergrounds. There's veins with absolute incredible intensity that just run for kilometers, and Kurt's favorite target has never had a single drill hole in it.

Kurt, anything you want to add?

Kurt Allen

I think our targets that we have defined, they're underground mineable targets. We're not focused on open-pit mineralization there at this point.

There has been open-pit mining there at Aurora in the past, but we're really focused on high-grade, underground mineable targets. Really excited about this project.

John Tumazos

Is it gold-only or is it gold and silver?

Kurt Allen

It's gold and silver, probably a 1 to 1 ratio, for the most part, it's high-grade gold, but there's associated high-grade silver with that as well.

John Tumazos

Thank you. If I could ask one more, Coeur and Pan Am each made large silver acquisitions in Mexico.

I know we're sticking to the US and Canada. Now that your balance sheet is very strong, is it possible to consider an acquisition?

If so, would it be limited to the US and Canada? Most of the silver targets are in Latin America or spread around the world.

Rob Krcmarov

Good question. I would say one of the things that really differentiates us, and I pointed out in the opening slide, is that we operate in safe jurisdictions.

You've got to go where the silver is, and so there's scarcity of primary silver deposits. We would consider other jurisdictions, but again, that'd have to be in relatively safe jurisdictions.

As a rule of thumb, anything in the top third of the Fraser Institute index, we would do a proper analysis on. We wouldn't accept it at face value and would understand those risks before we moved.

We would potentially go offshore, but in a safer jurisdiction. On M&A, we've outlined our organic growth project.

That's really what we're focused on. Obviously, we continue to look at opportunities, you never stop looking in this business, but we're not really interested in getting bigger for its own sake.

Scale alone, that doesn't create value. I think Russell discussed the dilution that comes with doing M&A.

It's an easy trap to fall into, and one we've consciously rejected. Again, what we're really focused on is long-term shareholder value creation on a per-share basis, and that governs all the decisions that we make.

Again, we are going to be disciplined. If and when we do M&A, it's really going to be about jurisdiction, safer jurisdictions, precious metals focused with a strong silver bias.

Exceptional gold assets, we would consider, but only if they're compelling cash generators that would really fund our overall silver strategy, but silver first. Would also have to see a clear competitive advantage for us in operating the asset, whether that's district consolidation, whether it's leveraging existing infrastructure, our technical capability or exploration upside, whatever that is, we'd need to see a competitive advantage and financial returns.

Obviously, as Russell talked about, we're going to hold ourselves accountable to that. Right now the M&A environment is pretty active.

There is competitive pressure to move, we understand that, but we've seen what happens when companies acquire out of fear of missing out rather than conviction, and we're not going to do that. We're not acquisition-dependent for growth, our internal pipeline's our main focus, but we'll obviously be opportunistic.

Thank you

John Tumazos

and congratulations.

Rob Krcmarov

Thank you.

Operator

This concludes the time allocated for questions. If you have additional questions, please reach out to Mike Parkin via the Contact Us link on the website.

I will now turn the call back to Rob Krcmarov, President and CEO, for closing remarks. Please go ahead.

Rob Krcmarov

Thank you, Hilary. Thank you all for your time and your questions this morning.

This team's worked hard to get Hecla to this point: debt-free, cash-generative, and with the best silver exposure in the sector. The fundamentals are with us, and we're just getting started.

Have a great day, everyone. Thank you.

Operator

This concludes today's call. Thank you for attending.

You may now disconnect.