Workhorse Group, Inc.

Workhorse Group, Inc.

1.90
USD
-0.75
(-28.30%)
-5.97EPS
33.44MMarket Cap
Mar 02Next Earn

Q3 FY2026 · Earnings Call TranscriptNovember 16, 2026

Operator

Good afternoon. Thank you for joining today's call.

Welcome to Workhorse Group's Third Quarter 2026 Earnings Conference Call. [Operator Instructions] Please be advised that today's conference is being recorded.

I will now turn the call over to John Williams, Chief Communications Officer. Mr.

Williams, please go ahead.

John Williams

Thank you, operator, and good afternoon, everyone. I would like to welcome all of you to Workhorse's Third Quarter 2026 Earnings Call.

On behalf of Workhorse, I would like to thank you for your patience as we had to reschedule this call due to disruptions from last week's global Microsoft outage. Now on to the business at hand.

Please note that we have posted our results for the third quarter ended September 30, 2026, via press release and 8-K and filed our associated quarterly report on Form 10-Q with the SEC. You can find the release and an accompanying presentation in the Investor Relations section of our website.

We will be tracking along with the presentation during this call. Joining me today are Scott Griffith, our Chief Executive Officer; and Jody Davis, our Chief Financial Officer.

For today's agenda, please turn to Slide 3. Following my opening remarks, I will hand it over to Scott, who will provide an update on our operational and commercial progress and the strategic priorities we are focused on.

He will also provide information on our recently announced partnership with RHAELM for our TerraPod modular data center platform. Jody will then walk us through our financial results for the quarter and our capital position.

Scott will then make closing remarks before we open the call for questions. Our cautionary language can be found on Slide 4.

The comments that will be made today include forward-looking statements, which are based on current expectations and projections about future events. These statements are subject to risks and uncertainties that could cause actual results to differ materially from those expressed or implied.

Additional information regarding these risks and uncertainties can be found in today's press release and in our filings with the SEC, including our Forms 10-K and 10-Q. Now I will turn it over to Scott.

Scott Griffith

Thanks, John. Good afternoon, everyone, and thank you for joining us.

We've now completed more than 3 full quarters as the new Workhorse. We believe we're tracking well versus the ambitious plans we first announced for the combined company when we closed the Workhorse, Motiv merger 11 months ago.

As 2026 comes to a close, we believe the future of Workhorse is becoming more apparent and stronger. Let me start with the current state of play in the commercial electric truck market.

As the overall market for electric commercial vehicles continues to evolve, we believe it's becoming even more clear where electric trucks make the most sense. That's in the depot-based mid- to last mile delivery segment, select municipal uses, including people movers and port and yard uses.

There's a reason why. Many of the duty cycles or use cases for these kinds of electric vehicles are the sweet spot for electrification.

These are fixed routes, often less than 150 miles per day, where the vehicles return to base each night for cost-effective overnight charging. Fleet managers can assign the right vehicle to the use case, using electric where it makes the most economic sense and using gas or diesel or a hybrid where the route or the use case requires it.

Our own experiences as a fleet manager bear this out. Using full year 2025 actual data, our Stables by Workhorse last mile package delivery business saved $0.43 per mile by using electric trucks based on fuel savings alone.

At today's average Ohio gas prices, that advantage increases to around $0.56 per mile. We believe other fleets are experiencing similar cost benefits from switching to electric trucks.

As such, we continue to see strong demand from both existing and new commercial fleet customers. This year, we've already announced a follow-on 100 vehicle order from long-time customer Purolator.

This is their fourth since the commercial relationship began with Motiv a few years ago. We've announced a follow-on 200 vehicle order from Gateway Fleet, which offers their customers a simple monthly fee that includes charging and the cost of the vehicle.

And we've strengthened our Canadian presence, hiring a country director and just in October, signed a partnership with our first Canadian dealership, Tristan Fleet Management. This is all adding up, and our momentum is building.

Our sales pipeline is now 6x larger than it was at the start of 2026. Lastly, the industry overall is seeing a similar trend in the adoption of electric trucks.

Amazon is already at scale with their electric last mile vans currently in partnership with Rivian. FedEx just placed an order for 2,000 electric step vans and they're rolling out charging infrastructure expansion as they execute their FedEx Network 2.0 vision.

And in the heavy-duty truck segment, Tesla is now producing and selling electric semis with fleets like Pepsi, Microsoft, IMC Logistics and others. Put it all together, and I think it's safe to say that leading commercial fleet operators are increasingly integrating electric trucks into their fleets with plans to expand to higher and higher levels of electrification as part of long-range planning, especially in the middle and last mile segments.

We remain bullish on the overall market for electric commercial vehicles and in our ability to capture a meaningful share of it in North America. That said, there's still more to do to accelerate large-scale adoption of commercial electric trucks.

We need to keep improving our purchase price relative to gas and diesel trucks. We need to work with partners to ease the complexity of adoption and reduce the CapEx needed to install and expand depot and near depot-based charging.

And we need to expand financing alternatives as large commercial operators move from smaller scale test fleets to fully integrated electric vehicle truck operations. Our partnership with Gateway Fleets shows progress on the last 2 points, offering 0 upfront vehicle cost and a single all-inclusive lease that covers both the vehicle and charging.

We believe models like this are going to be very well received going forward as they expand into more geographic areas. We're also continuing efforts to develop our modular chassis and next-generation powertrain platforms, which we believe will be a big step forward towards cost reduction and help us to address the relative price of our vehicles.

The modular chassis program will also enable us to grow share in the overall medium-duty commercial truck segment as this platform becomes the basis for developing a wider range of vehicles in our product portfolio. The primary purchasing driver in the $23 billion medium-duty truck market is the annual replacement cycle to keep fleets fresh and manage the average age.

We're seeing electric trucks continue to gain share as large commercial fleets replace the annual turnover of aging ICE trucks. With electric operating costs, often referred to as total cost of ownership, or TCO, continuously proven to be a fraction of the cost of operating ICE-powered trucks, we believe the most efficient way to gain share is to reduce the cost of building electric trucks and pass the savings on to fleet buyers who are ready to make the transition.

That is why reducing our bill of materials or BOM, is central to our plans. Our new modular chassis architecture will incorporate highly flexible wheel-based configuration, advanced battery and axle technologies, next-generation software capabilities and an integrated smart power electronics hub.

Our modular chassis will be integrated with our step van products, and we'll also be pairing it with a technically advanced low-cost cab Class 5/6 cab to create a lightweight, high-performance cab chassis platform optimized for efficient upfitting by body builders. This is an important development for us.

According to S&P Global data, about 94% of the Class 5/6 medium-duty market is cab chassis and valued at approximately $14.5 billion. We expect the resulting products to deliver increased payload capacity, accelerate time to market for vocational applications and perhaps most importantly, a significantly more competitive price point compared to gas and diesel for fleet customers across a wide range of use cases.

With these developments, we believe Workhorse can potentially capture a much larger percentage of the overall $23 billion market for medium-duty vehicles. We expect our engineering, manufacturing and supply chain efficiency strategies to begin delivering material BOM savings to our current W56 step van products in 2027.

We believe the design, engineering and manufacturing changes from our next-generation platform will further reduce BOM costs, and we anticipate bringing the new chassis to market in our 2028 model year. Turning to the launch of our TerraPod modular data center platform.

We're also seizing on what we believe is a historic opportunity to drive new and profitable growth by filling a growing need in the AI infrastructure market with an opportunity that leverages both our engineering capabilities and manufacturing operations. We're not alone in seeing this opportunity.

Demand for AI compute is growing faster than traditional data centers can be built and industry leaders, including NVIDIA, are publishing reference designs for modular factory-built AI infrastructure. We believe this new modular design approach will usher in a period of continued growth for AI infrastructure with a new distributed approach that will leverage more locations near existing sources of power.

Industry research from entities, including Grand View and MarketsandMarkets estimates the modular data center market will reach approximately $24 billion in the U.S. and $90 billion globally by 2031.

The AI infrastructure industry is adding modular data center designs for several reasons: proximity to power. Power availability is a defining constraint on how fast AI plans can become operational and a smaller footprint can adopt a range of power sources like solar, wind and natural gas to help close the gap.

Second is location flexibility and security. Modular units can sit closer to where compute is needed and smaller distributed sites are easier to secure.

And then standardization. For example, NVIDIA's DSX, POD reference design for Vera Rubin AI factories built in modular containers is meant to make construction faster and more uniform.

And then lastly, speed. Smaller sites can address permitting issues related to large developments.

Sites can also begin computing with modular units as they are installed even while the rest of the site is still being built. These benefits, among others, are why industry leaders are developing reference designs for modular data centers.

Our new TerraPod product line is being designed to align with industry reference designs while optimizing the benefits I just outlined. TerraPod systems will be built on a production line rather than a construction site.

They're designed to be sited on deployment-ready foundations, and we believe they can be put into commercial use far faster than conventional facilities. There's growing public discussion about the effect of large-scale data centers on local communities, including electricity rates, concerns about water and land use and excessive noise.

We believe the modular approach will address many of these concerns. Here are a few of the benefits provided by modularized AI infrastructure.

First, reducing local impact by making deployments smaller and more distributed, modular deployments can reduce concerns about massive structures in proximity to residential areas. Secondly, electricity rates.

By connecting modular data centers directly to existing power sources, modular deployments may help reduce the need to build costly new large-scale power generation. And third, water use.

TerraPod is being designed to maximize closed-loop cooling, which when combined with smaller data center footprints is intended to limit water use. Our modular data center line of business is off to a great start.

On October 29, we announced what we believe is the start of a foundational partnership with RHAELM, a U.K.-based developer of vertically integrated AI infrastructure to jointly commercialize TerraPod. The partnership will pair our U.S.

engineering and manufacturing capabilities with RHAELM's global energy partnerships and AI customer relationships. We have deliberately structured the partnership in 3 phases: a walk before you run approach designed to streamline and accelerate time to full production while putting our teams together on initial work right now.

Phase 1 is to build a reference unit. Under a manufacturing spec unit purchase agreement signed in October, RHAELM will pay Workhorse $10 million for a full-scale TerraPod manufacturing spec unit.

We intend for this to be consistent with the standard modular data center blueprint being developed by RHAELM's partners. The unit will serve as a physical reference for equipment fitment, service access and assembly sequence.

This will enable RHAELM, its commercial partners, equipment suppliers and even prospective customers to see, interact and refine the design before committing the capital needed to deliver final prototypes and ultimately begin production. Phase 2 is to sign a supply agreement, which we're targeting for execution by December 31, 2026.

We believe this agreement would adopt a structure for milestone-based prepayments toward a first order of 150 TerraPod units and the U.S. right of first refusal, giving Workhorse the opportunity to supply modular AI infrastructure units for all future RHAELM projects in the United States.

Phase 3 is to scale production. We currently expect TerraPod production to begin in 2028.

As RHAELM's CEO, Bradd Lewis, put it in our partnership announcement, "As standardization of AI infrastructure continues, turning power into compute moves from the field to the factory. And in partnering with Workhorse, RHAELM now has the manufacturing partner to make this happen."

We couldn't agree more at Workhorse. Lastly, merger integration is on track and nearly complete across all priorities, including enterprise systems, office locations, teams and management.

The team has done an amazing job of executing on the logistical and technical challenges of integration while increasing deliveries every quarter and starting the process of launching an entirely new product line, all in the space of less than a year. We remain on track to reach our stated $20 million in run rate synergies by the end of 2026, as Jody will walk you through.

We're also preparing a new satellite office in the Bay Area. It will house California engineering, regional sales and service staff and serve as a capabilities demonstration center and as a hub for customer engagement.

In summary, I'm pleased with our progress to date, extremely excited about what's yet to come. With that, let me hand it over to Jody for the Q3 financials.

Jody Davis

Thanks, Scott, and good afternoon, everyone. The third quarter reflected revenue growth and cost discipline.

Revenue grew 72% from the second quarter. Operating expenses came down 7%, and our synergies are on track to achieve our $20 million target by the end of 2026.

I'll walk through the results and the balance sheet and our liquidity. A quick note on comparability.

Our third quarter 2026 results reflect the fully combined Workhorse and Motiv operations, while the third quarter of 2025 reflects only Motiv, the accounting acquirer in the reverse merger. Because the sequential comparison of the fully combined operation is more meaningful, my comments today will focus on quarter-over-quarter performance.

The year-over-year comparisons are discussed in our Form 10-Q filed today. Revenue for the third quarter of 2026 was $6.1 million, an increase of 72% from $3.6 million in the second quarter.

We delivered 39 vehicles in the third quarter compared to 26 vehicles in the second quarter. That is our second consecutive quarterly increase, up from 21 vehicles in the first quarter as we ramp W56 production at Union City to meet customer demand.

Third quarter deliveries also included 12 older Workhorse vehicles sold from inventory, which generated cash in the quarter. Gross loss in the third quarter was $9.6 million compared to a gross loss of $7.5 million in the second quarter.

The higher loss was driven by higher manufacturing overhead and direct labor costs incurred on the production ramp that incurred in the quarter as well as $1 million of higher costs related to a settlement with a battery supplier. We recorded $0.8 million related to this settlement in the second quarter and $1.8 million in the third quarter.

This charge was noncash and reflected in the cost of batteries previously purchased and returned to the supplier as the vehicle model had been discontinued. As fourth quarter volumes increase and we absorb more of Union City's fixed cost base, we expect gross loss per vehicle to improve with further improvement in 2027 as BOM and other cost reduction strategies take effect.

Total operating expenses for the third quarter were $11.1 million, a 7% decrease from $11.9 million in the second quarter. Selling, general and administrative expenses were $7.4 million compared to $7.8 million in the second quarter.

Research and development expenses were $3.7 million compared to $4.1 million in the second quarter. Turning to merger synergies.

As we have previously communicated, our target is to exit 2026 at a $20 million annualized cost synergy run rate. Based on our third quarter actuals, I am pleased to report that we are on track to exceed our annualized run rate of $20 million.

We have realized approximately $13.8 million of synergies through the first 9 months of this year. The largest contributor is organizational design with combined compensation and benefits running more than 1/3 below the combined premerger operating plans.

We are also realizing savings in corporate insurance, sales and marketing and professional services and from bringing contract assembly in-house at Union City. Facility consolidation is still in progress as we expect that benefit to build in 2027 as legacy leases expire.

We are reinvesting a portion of these savings in product development, so not all of it shows up as lower reported operating expenses, but we remain on track to exit 2026 at or above our $20 million target. Loss from operations was $20.7 million in the third quarter compared to $19.4 million in the second quarter.

Net interest expense was $1.4 million compared to $0.8 million in the second quarter due to an increase in borrowings in the third quarter to fund working capital and operations. Net loss for the quarter was $21.8 million or $2 per basic and diluted share compared to a net loss of $20.2 million or $1.86 per share in the second quarter.

Turning to the balance sheet. As of September 30, we had $4.9 million in cash and cash equivalents plus $0.5 million in restricted cash.

We ended the quarter with $40 million outstanding and no availability under our cash flow credit agreement and $18.4 million outstanding and $1.6 million available under our customer order credit agreement. In October, after quarter end, we borrowed the remaining $1.6 million available under the customer order credit agreement.

Also in October, we amended the customer order credit agreement to add $10 million of capacity, bringing the total capacity to $30 million, and we drew down that full amount. We also deferred interest payments on the additional $10 million commitment and extended the deferral on $30 million of the $40 million outstanding under the cash flow credit agreement until after March 31, 2027.

As of today, we have $29.8 million in outstanding borrowings and $0.2 million of remaining availability under the customer order credit agreement and $40 million of outstanding borrowings with no remaining availability under the cash flow credit agreement. Turning to liquidity.

We are addressing our capital needs on 3 fronts. First, we are actively pursuing additional capital to fund our growth plan.

Second, our controlling stockholder, who is also our lender continues to support the business as reflected in the October amendment that increased our borrowing capacity and deferred our interest into 2027. Third, we are seeking to structure our commercial agreements to help fund working capital, including the $10 million manufacturing spec unit purchase agreement with RHAELM, the milestone-based prepayments contemplated under the supply agreement framework and the milestone payments we are seeking on 2027 vehicle orders.

We are not currently providing specific guidance at this time, but we expect deliveries to increase meaningfully in the fourth quarter as compared to prior quarters, including a record number of W56 step vans as we continue to ramp production at Union City. That ramp supports our previously announced orders from Purolator and Gateway as well as purchase orders from other customers.

Looking to 2027, our backlog includes Gateway 200-unit follow-on order with deployments expecting to begin in the second half of 2027. And with that, let me turn it back to Scott.

Scott Griffith

Thanks, Jody. In summary, we have a solid order base and a growing pipeline in our truck business and in modular data centers, a signed agreement for a spec unit and a defined path to the first order.

That's why we believe Workhorse is approaching an inflection point. And thanks to our existing manufacturing plant in Union City, we have capacity to build more than 5,000 trucks a year on a single shift, well above today's volumes and the site from which to launch initial production of our TerraPod product line.

We believe we're ready for growth because we have the right pieces in place, an experienced senior leadership team, momentum in our commercial vehicle business, a foundational go-to-market partner in our modular AI infrastructure business with a $10 million manufacturing spec unit agreement in place. Engineering, manufacturing and supply chain efficiency strategies that are showing results with even greater impact expected in 2027 and beyond.

And finally, a manufacturing facility already in place and capable of meeting near- and long-term demand. We're also at the epicenter of transformation of 2 major industries, transportation and AI computing.

We're designing and manufacturing intelligent industrial machines that are the lifeblood of modern economies. As we like to say, you can always count on a Workhorse.

We believe our evolution into an American industrial technology company is becoming more clear with each day, and it's an exciting time to be at Workhorse. I'm looking forward to a strong finish to 2026 and to sharing our 2027 developments and milestones with you on our next call.

We appreciate your continued support, and we look forward to updating you on our progress in the months ahead. Operator, you may now open the line for questions.

Operator

[Operator Instructions] Our first question is from Ben Sommers with BTIG.

Benjamin Sommers

So first I wanted to ask on the Canadian market a little bit now that we have our first deal with the Canadian dealer. Just kind of anything to call out there different -- that could potentially be different than the U.S.

market? And kind of how do you think about Canada as a market for the longer-term strategy of Workhorse?

Scott Griffith

Ben, good to hear from you. It's Scott.

Great question. For obvious reasons, I think it's been talked about even in the press, the larger fleets in Canada are definitely punching above their weight in terms of their adoption of electric vehicles.

I mean, overall, that market is probably 12% to 15% of the total size of the market in North America. So it has -- obviously has that limit to it.

But it's definitely adopting well in advance of what the U.S. is doing right now.

We think our relationship with Purolator, which is very strong. We saw just -- we've got more progress coming, we think, there with additional upside opportunity in the out years.

They're a real leading fleet and other fleets in Canada are really looking at their leadership as, well, geez, if they're working with Workhorse and they've really proven their product line, they've learned all of the ropes you have to learn about infrastructure development and operating a depot that's been electrified. We're really getting benefits from that now, and we're seeing other fleets who are approaching us and/or Purolator, frankly, to learn more about electrifying.

So -- and then the last thing I'd say there's other U.S. fleets who we either do business with or are talking about doing business with in the U.S.

that are also operating in Canada, and we find that they're often looking for us to help them electrify in Canada, sometimes even in advance of when they enter in the U.S. because that market is just further along.

So it's generally been a real market leader for us, and we expect it to stay that way. And we're going to continue to invest in a presence in the dealer network in Canada.

Benjamin Sommers

Super helpful. And then next, I just wanted to ask a little bit about the AI modular data center business and kind of what stood out as RHAELM as a partner there and kind of how you think about leveraging their existing relationships to kind of scale this business moving forward?

Scott Griffith

Yes. I mean, obviously, RHAELM brings, I think, 2 really strong things for us.

One, we have a right of first refusal on any and all RHAELM deliveries in North America or in the U.S., I should say, for modular data systems. So they can go work with other folks, but we get the first right of refusal on all orders that they get.

What they bring to the table is offtake agreements, relationships with the very largest cloud builders and AI cloud builders, and they bring capital. This is obviously a super capital-intensive industry to develop whether they're modular data centers or larger land-based data centers, you need powered land, and in order to get powered land and power companies working, you've got to have a lot of capital and a major balance sheet to do that.

That allows us to tap into what I'll call a Tier 1 supply relationship with companies like RHAELM. They've already announced their relationship with the largest power company in Japan, also has a lot of operations here in North America.

And they've launched -- they've announced their partnership with Dell and other major hardware and software suppliers in AI. So they bring a really great ecosystem.

They have a whole more of a front end, if you will, on offtake agreements for large offtake deals that they can do, and they have a balance sheet that will continue to develop, we believe, to really support the major project management and product development kinds of opportunities that we'll supply into. So they're almost an ideal partner for us.

And they've also seen, even since the last few weeks, there's been a lot of public sentiment about the election results, what's happening in the market, and they're seeing modular data centers as a huge upside opportunity in North America, and we believe we're going to be able to attack that together.

Operator

This will conclude our question-and-answer session. I would like to turn the floor back over to Scott for final comments.

Scott Griffith

Thanks, operator, and thanks to everyone who joined the call today. I do want to reiterate what John said at the beginning about having to postpone today's call from last Thursday.

It was a really challenging afternoon with the Microsoft outage. We appreciate your patience, and we're glad you all could make it here today or hear this on record.

We're really progressing from a very different company when we first merged in late 2025, early 2026. When I think about where we are now as we get to the last part of 2027, Workhorse is really transitioning from a period of post-merger integration, sort of long-term strategy development, new team formation coming in.

All of that is pretty much behind us now, and we're much more moving toward what we believe will be a growth opportunity defined by operational excellence, market growth, market adoption and strategic partnership development. So we're really excited about the quarters ahead.

Today, we talked about progress on this call, increases in vehicle production. We've talked about a really strong Q4 that we believe we're going to deliver a much stronger order backlog.

We've had 6x growth in our sales pipeline. We announced our first strategic partner in the modular AI data center or infrastructure business, and we're tracking our synergies on the $20 million target.

So there's a lot more than that. But that's a pretty nice list coming off of about 11 months since the merger.

It's really just the beginning. I'm really looking forward to reporting back on our full year results as we turn the calendar in next year.

In the meantime, I hope everybody has a healthy and happy holiday season, and we'll see you in 2027. Thanks very much.

Operator

Thank you. This will conclude today's conference.

You may disconnect at this time, and thank you for your participation.