Q2 FY2026 · Earnings Call TranscriptAugust 14, 2026

Adrian Suta

Hello, everyone. Now it's 12:00 sharp, it's the official starting time for the presentation, but, as usual, I propose we wait a couple of minutes or even more than that, like five minutes, to allow more people to connect to the call.

Our proposal is to actually start the call at five minutes past 12:00. Thank you.

One more thing: if you don't mind, can I get a quick confirmation that both audio and visual are okay, and you can both hear me and see the cover page of the presentation?

Ana Iuliana Dinu

Yes, it's fine.

Adrian Suta

Thanks. Now it's five minutes past 12:00.

I think that was sufficient time allowance for other people to connect to the call, we propose to start the conference call. Ladies and gentlemen, let us just greet you.

Good afternoon, and welcome to Transelectrica's analyst call covering our first half 2026 financial results. Joining today's call from Transelectrica are my colleague, Ana Iuliana Dinu, she's the head of the Financial Division, and myself, Adrian Ciocă, Head of Energy Regulatory Affairs and currently also acting as Investor Relations Officer.

Before we begin, a few housekeeping remarks and rules, as usual. Today's call will include two main sections.

The first section is a presentation on our end for the first half results covering a number of topics. I'm just going to go through them.

We are going to touch only key highlights, financial performance and underlying drivers, we will be diving into grid losses and cost dynamics, we will be also discussing pass-through operations, and the final chapter of the presentation investments. The second part of the presentation is dedicated to a Q&A session.

Now, in terms of housekeeping, we would kindly ask you to keep your microphones muted during the presentation part of the call unless you would like to ask a question or make a comment while the presentation is unfolding. Questions are welcome at any point during the presentation, feel free either to jump in verbally while the presentation is being delivered or simply drop your questions in the chat box.

Both options are perfectly fine for us. Depending on the question and the flow of the presentation, we may address it immediately upon receipt.

We'll pause the presentation and discuss the question at hand, or we may allow the questions to accumulate, to stack up, and address them together during that dedicated Q&A session at the end of the call. Now, the default language setting of the call is English, but, as an exception, if all participants are Romanian speaking, we can switch to Romanian.

Otherwise, we will obviously stick to English and continue using English language for the remaining part of the presentation. Before we proceed, may I kindly ask any non-Romanian-speaking participants to identify themselves?

We are making this call in order to identify the proper way to set the language setting for the call going forward beyond this point. I can see at least one name that doesn't seem to fit into the profile of a Romanian name.

Please do let us know. Make us aware that you are connected to the call and you are non-Romanian speaking person, we don't switch to Romanian and we stick to English for the remaining part of the presentation.

I see a name, Carl Johansson, that doesn't seem to be a Romanian name. Please, Mr.

Johansson, let us know if you are Romanian-speaking person or a non-Romanian-speaking person, we can properly define the language setting of the call from this point forward. In the absence of any input from your end in terms of preferred language setting, I think it's safe to continue in English as far as there is also a possibility that other non-Romanian speaking persons might join the call at a later stage of the presentation.

We will keep English as the standard language setting for the call. Okay.

Next I'm just going to shuffle through the slides now. We'll start by providing the major highlights what happened in the first half of 2026 in a nutshell.

We'll try to be as short, as concise as possible and put the spotlight on the most relevant developments in the first half of 2026. Just as a reminder, we usually split the P&L discussion into two separate sections: the profit-allowed operations, what we commonly refer to as core operations, and the pass-through section of our P&L, with one specific remark that the pass-through section is a sort of conceptual reference to this section of our P&L as non-zero financial results within this particular section of our P&L are possible, but the underlying regulatory principle that defines the regulatory regime is that over the course of time, over a multi-year framework, any gains or losses incurred in one financial year tend to be evened out using regulatory-defined ex-post correction mechanism.

There are true-up mechanisms embedded into the current tariff-setting regulation by the Romanian regulator that enable any deviation from financial neutrality principle within an annual financial exercise to be compensated, to be neutralized, to be offset over the next years. Starting with the profit-allowed operations, the main highlights are the following.

We have a stronger year-on-year core profitability, and we refer to EBITDA that was up 32%, which was mainly driven by higher cross-border congestion income, plus 74%. It was 74% up congestion income in first half 2026 as compared to the previous year.

This was actually the same main driver in both quarters of 2026, both in first and second quarter. In terms of tariffs, tariff revenues also remain stronger year on year.

The higher tariff level, up by approximately 11%, more than compensated for a 2% reduction in billed volumes over the first half. The volume effect became more visible in the second quarter of 2026, when tariff volumes were approximately 5% below year on year, after being broadly flat in the first quarter of 2026.

Actually, after a strong year-on-year increase in the first month of 2026, in January, tariff volumes in the next five months, February to June, have declined at a more pronounced pace in the second quarter, in April, May, and June specifically, with prosumer self-consumption, is basically behind-the-meter rooftop photovoltaic electricity production that is used on site behind the meter, as the most likely driver, as rooftop PV capacities are continuing the upward trend. In terms of grid losses, costs increased year on year, reflecting both a higher physical loss factor and higher average purchase price from the open market.

The first half loss factor was 2.49%. Just a reminder, the loss factor is calculated by dividing the actual energy volume that is lost during the transmission process divided by the total energy intake throughout the analyzed period.

The 2.49% loss factor for the entire first half of 2026 compares with the 2.14% in the first half of 2026, while the gross market average purchase price increased in 2026 by approximately 14%. These higher costs were compensated at the level of core operations by stronger tariff and stronger congestion revenues.

Now, making the transition to the pass-through operation side of the slide, the first half generated a gain of approximately 85 million lei, which the year-on-year improvement concentrated in the second quarter. Importantly, this does not reflect a significant quarter-on-quarter change in the underlying 2026 performance, but rather base effect from the second quarter of 2025.

More specifically, June 2025 saw a sharp increase in balancing capacity procurement cost as balancing capacity prices surged. This was driven particularly by strong demand from downward regulation back in 2025 against the background of significant energy surplus in the system associated with abundant photovoltaic and hydro generation last year.

The stronger year-on-year result in the second quarter of 2026 should therefore be viewed primarily as a normalization against the unusually weak comparison base back in June 2025, rather than a material change in the underlying trend between the first and second quarters of 2026. The current first half pass-through gain, 85 million lei, substantially offsets the sizable regulatory backlog of approximately 100 million lei accumulated over the past two years, 2024 and 2025, that we need to recover.

One worth mentioning thing is that the next tariff review is scheduled for 1st of October 2026. Based on the current cost and revenue trajectory, a tariff reduction is expected in order to bring pass-through revenues more closely in line with actual costs.

Actually, the third quarter of 2026 is expected to fully bridge the remaining gap between the recovery backlog of 100 million and the gain that was earned in the first half of 2026. At 9 months 2026, we expect the backlog of 100 million to be fully recovered.

As a remark, there was a change in regulation. Under the new regulatory calendar, tariff reviews will take place every six months, starting 1st of October 2026, and with regular reviews on 1st of April and 1st of October.

Now moving to the next slide, we will be diving into the structure of revenues. Total operating revenues increased by approximately 11% on year-over-year basis to around 3.25 billion lei.

Now, looking specifically at profit-allowed operations, revenues increased by approximately 19% to 1.77 billion lei. The main drivers are: transmission tariff revenue increased by approximately 8% to around 1 billion lei.

The approximately 11% increase in the tariff more than offset the 2.3 decline in billed volumes. Cross-border congestion revenues increased by approximately 74% in the first half of 2026 to around 263 million lei, remaining the most important positive driver of core profitability.

Transelectrica also recorded additional revenues from emergency energy assistance provided to neighboring countries. As a reminder, balancing capacity and balancing energy are pass-through activities and are neutral for Transelectrica over time, although their settlement mechanisms differ.

Balancing energy is settled dynamically through the balancing market and imbalance pricing. Balancing capacity, by contrast, is recovered through a regulated tariff based on forward-looking assumptions for procurement costs, reserved volumes, and tariff volumes.

Deviations between actual outcomes and tariff assumptions therefore generate temporary regulatory gains or losses that are subsequently corrected through tariff adjustments over the next years. With that said, let's move to slide six and deep dive into costs.

Operating costs within profit-allowed operations increased by approximately 11% year on year to around 824 million lei. The main driver was, again, grid losses.

The gross cost of energy purchased for grid losses increased by approximately 68 million, or 24%, year on year. Now, it's usual to distinguish the gross purchase cost shown in the chart from the net economic cost of grid losses.

Transelectrica may sell excess energy purchases back into the market, after deducting this sales income, the net cost of grid losses in the first half of 2026 was actually a bit higher than presented in the chart; it was 75 million lei higher year on year. Now moving further to deep dive into grid losses.

The first half grid loss factor, if we look at the left side of the slide, we see some percentages there. The first half grid losses factor was 2.49%, that compares with 2.14% in the first half of 2025.

The loss factor improved slightly during the second quarter of 2026, declining from 2.6 in the first quarter to 2.36 in the second quarter. However, the aggregate loss factor for the first 6 months of 2026, is still well below the regulatory cap, which was set by the regulator as 2.26 for the entire 2026 year.

As noted previously during previous presentations on different occasions, this cap is an annual average and should not be applied mechanically to individual fractions of the year, quarters or half yearly. The first half result therefore does not by itself determine the full year regulatory outcome.

In volume terms, grid intake during the first half was approximately 20.76 TWh and grid offtake approximately 20.24, resulting in grid losses of around 0.52 TWh in absolute terms. Now going to the midsection of the slide, we will take a look at purchase prices.

Starting from top to bottom, the average forward market price was approximately 560 lei/MWh, which is up 17% year on year. Now moving down to the average day-ahead market price, it was approximately 645 lei/MWh, broadly flat year-over-year.

The average balancing market price, we don't have a dedicated chart for that. You see in the base section of the middle section of the slide, we see the average balancing market price was approximately 926 lei/MWh, which is down with around 4% compared to previous year.

Now moving to the right-hand side section of this slide, across all procurement markets, the weighted average acquisition price was approximately 651 lei/MWh, which is around 14% higher year on year. Now looking at the donut charts on the top right section of this slide, the procurement mix was also shifted compared with the first half of 2026.

Approximately 50% of total grid losses volume were purchased on forward markets, 37% on spot markets, and 12% on the balancing market, compared with 62%, 30%, and 8% respectively 1 year earlier. Now going beyond what is being provided in terms of data and trends on this slide, as a relevant post-reporting period development, Transelectrica had contracted a total of 60 MW baseload profile for grid losses coverage for the whole year, from 1st of January to 31st of December, which was built up from several volumes contracted with several suppliers in the wholesale market.

Following the activation of force majeure by Nuclearelectrica, as they were forced to shut down both nuclear reactors at power plant Cernavodă, contractual delivery of 30 MW, representing half, 50%, of the total contracted baseload in our grid losses energy portfolio, has been temporarily suspended for the period between 13th of August and the end of August, basically 19 days. The resulting 30 MW shortfall will most likely need to be replaced through purchases on the spot market, temporarily increasing Transelectrica's exposure to spot electricity prices for grid losses procurement during the contract suspension period.

At this stage, however, we do not see a significant risk that the other suppliers covering the remaining 30 MW of the contracted baseload will invoke force majeure or otherwise fail to meet their contractual delivery commitments. Once again, that is the situation 13 August onward.

This doesn't affect the first half of 2026. Now moving to the next slide, when we deep dive into EBITDA formation, EBITDA from profit-allowed operation increased by approximately 32% year on year, from around 410 million to around 541 million.

The main positive driver was a strong increase in cross-border congestion revenues. Higher transmission tariff revenues were also contributed and compensated for the higher grid losses costs.

Pass-through operations contributed a positive 85 million lei in the first half, compared with approximately 46 million in the first half of 2026. As a result, reported EBITDA for the company increased by approximately 37%, from 456 million to 626 million.

The second quarter confirmed the underlying trend, profit-allowed EBITDA increased by approximately 32% year on year, while total reported EBITDA increased more strongly due to negative pass-through contribution of the weak comparison base back in the second quarter of 2026. Now we move further to net income decomposition.

At net income level, net income increased to approximately 356 million lei in the first half of 2026, compared with 256 million lei in the first half of 2026, representing an increase of approximately 39%. The main driver was the stronger EBITDA generated by profit-allowed operations, particularly the increase in cross-border congestion revenues.

The positive contribution from pass-through operations also supported the year-on-year improvement. EBIT increased to approximately 427 million, while earnings before tax reached approximately 438 million.

Now, looking specifically at the second quarter, net income was approximately 153 million lei, compared with 99 million lei in the second quarter of 2026. Now going further, moving to investments delivered in the first half of 2026, approximately 262 million lei of new investment contracts were signed.

That you see on the top section of this slide. In the middle section, approximately 306 million lei were added to construction work in progress.

Moving further down to the base section of this slide, approximately 44 million lei of assets were commissioned and transferred from construction work in progress to fixed assets. Among the more significant items delivered or progressed during the period were two modern reactive power compensation units for voltage regulation, and also grid connection works for new renewable generation, and also the modernization of the substation at Isaccea.

Major contracted projects also include the modernization of substation at Medgidia Sud, a cloud communication network and telecom solution for the emergency dispatch center, and also an autotransformer for the Mintia substation. Now just to conclude before going to switching to the Q&A session, just to wrap it up quickly: so, core regulated operations remained quite strong, with profit-allowed EBITDA increasing by approximately 32% year on year.

Cross-border congestion income remained the main positive earnings driver, increasing by approximately 74% against last year. High tariff revenues compensated for both lower tariff volumes and higher grid losses costs, and pass-through operations generated an approximately 85 million lei first half gain, substantially offsetting the backlog the recovery backlog accumulated in 2024 and, more importantly, in 2025.

The next tariff review for ancillary services tariff is scheduled for 1st of 1st of October 2026, with a tariff reduction expected to realign revenues with actual pass-through costs. Reported EBITDA increased by approximately 37% and net income by approximately 39% year on year.

Basically, I think we pretty much covered the main the key points of the presentation, of the financial performance and the underlying operational and market developments during the first half of 2026. Thank you for your attention to the first section of the presentation today to the of the call today, the presentation, and we will now open the floor for questions.

I'm just going to quickly check for a text box so I can see if anyone dropped questions there. I don't see any questions dropped in the text box.

I see one raised hand, Irina Rădulescu Irina Irina Rădulescu, please shoot. Ask your question.

Hello, and thank you for taking my questions. I have several questions regarding different, I think, important topics.

The first one is regarding the system services. We kind of expected a rather positive tariff adjustment starting October, but things changed.

If you could detail a bit, this means that you will recover in the third quarter the remaining backlog, the whole one, and should we expect in this case a significant positive EBITDA for zero or profit segment in Q3? Am I right in this case?

Why the tariffs will decrease? Will the costs also decrease, do you expect this, and why the regulator may decide to reduce the tariffs?

Adrian Suta

Yeah. In terms of ancillary services tariff, the pass-through section of our P&L account, what I mentioned is that we are currently generating more revenue based on the tariff that was approved by the regulator at the beginning of 2026.

We are steadily, progressively recovering the backlog originating in 2024 and 2025. In the first half of 2026, a good fraction, the majority, the bulk of that backlog has already been offset in the first six months, it's 80

What's the remaining figure for 30 June?

Adrian Suta

For the third quarter, July to September, the remaining backlog to be bridged, the remaining gap between the entire backlog, the full amount of the backlog to be recovered and the amount that we have already recovered in the first six months is the difference between 100 million, the full backlog, and the 85 profit that we earned in the 85 million gain we gained in the first six months. Based on the current revenues and cost trajectory, we expect the recovery of the backlog to continue in July, August, and September.

By the end of September, we expect the full amount of the recovery backlog to be fully offset. The difference between the full backlog of 100 million and the 85 million we have already recovered is 15 million lei.

We estimate that this particular amount will be fully covered in July, August, and September. Basically, the underlying rationale is that if we keep the tariff in place from the 1st of October forward, we will be generating additional profits in the fourth quarter of 2026.

Once we fully recovered the backlog, the recovery backlog from last two years, 2025 and 2024, the net recovery amount, the tariff should be realigned with the actual costs. In 2026, the tariff provides significantly more revenue as compared to the actual expenditure incurred by Transelectrica on purchasing ancillary services in the balancing capacity markets.

Keeping the tariff in place makes sense up to the point in time where the full backlog amount is eventually recovered, and that we expect to happen by the end of September or even sooner. Beyond the 1st of October, beyond 1st of October, keeping the same tariff in place that generates significant profits on a monthly basis doesn't make sense because the underlying rationale is for the tariff in place to help us recover the backlog from 2025 and 2024, and then the tariff should be perfectly realigned with actual costs.

This kind of implicitly means that costs have decreased in Q3 compared to last year, which was a different year, quite different quarter, let's say, third quarter. Yes,

Adrian Suta

yes. Actual costs are lower than what happened in 2025.

In 2025, we had a surge, the price was soaring starting May, June, and July. Market participants took full advantage of some balancing capacity market structural not failures, but we don't really have significant competition for some particular products in this market, and market participants took full advantage and the bids they placed in the balancing capacity markets, the prices rocketed through the roof.

That happened last year in May, June, and July mostly. That was the reason why costs were significantly increased in 2025.

Now the tariff was increased, the prices cooled off in 2026, and the current tariff that is in place today helped us already recover a significant percentage of the overall recovery backlog coming from 2025. At the end of September, we estimate that this recovery of the backlog will be fully finalized.

It doesn't make sense

To keep the tariffs high.

Adrian Suta

To keep the tariff at the same level that provides significant monthly gains.

Thank you. In terms of grid losses, for the whole year to meet the regulatory cap, Transelectrica needs to keep the grid losses at around 2% for the second half of the year.

Is that doable from past or from what you know about technical parameters and what could happen in the second half of the year? If not, if this target is not achievable, what then will happen at the next tariff revision?

Adrian Suta

Your calculation is correct. In order to balance the first half with the second half in order to contain grid losses percentage within the regulatory cap that was set for 2026, the second half should land at somewhere around 2%.

That's not really impossible statistically, but it is, I would say, it is rather unlikely and basically out of Transelectrica's control. There is little thing the TSO, the operator of the national transmission grid, that can be done in order to say we have maybe not full control, but a significant level of control over the loss factor and the loss volume.

It very much depends on factors that are completely outside the TSO's control. It very much depends on the structure of production, also it very much depends on meteorological condition, on the level of precipitation in summer, autumn, and winter, and also is very much dependent on the structure of cross-border electricity flows.

It's not something that we can control. We can only look back at previous years.

Based on statistics, it is possible, theoretically possible, is not something that we exclude, we rule out, that the second half of 2026 might be able to fully balance the high grid losses factor number in the first half, but I would assume it is something that we should rely on as base scenario. The most likely outcome of 2026 is that the actual full year grid loss percentage number will be above the regulated target, the regulatory

What will this imply for the tariff set next year or how will this

Adrian Suta

There will be no positive correction in terms of grid losses. That is the outcome or that is the result of exceeding the regulatory cap.

Neither regarding prices? One one factor is quantities, but what about prices?

Adrian Suta

In terms of prices, prior experience shows us that in terms of pricing, based on the current regulatory regime in terms of limiting the not only volumes, but also prices, we usually ranked below the average of the Romanian electricity network operators. That is the benchmark that regulator uses.

We usually outperformed the other distribution operators in Romania, not really a big concern in terms of prices. There is a significant probability, there's a significant likelihood that in terms of physical loss factor, that we probably land at the end of the year somewhere above the regulatory cap.

This means that also no negative correction, this will not negatively impact tariffs? Just no positive adjustment.

Adrian Suta

No positive adjustment, no negative adjustment.

It's

Adrian Suta

expenditure that is above the regulatory cap. Unrecovered expenditure.

Unrecovered. All right.

Regarding this force majeure by Nuclearelectrica, what's the difference between the day between the spot price and the contracted price for these 19 days? I know we we can talk only about the next probably two or three days because the the prices is volatile, but what what do you see until now?

Is there a big difference between spot price that you will need to buy electricity at and the contracted price?

Adrian Suta

Okay. I will just go through some supporting slides we prepared for this presentation just to give you some insight into the grid losses hourly profile, monthly profile, and purchase prices.

Let me just check if this is the right This slide shows you the first half of 2026, January to June, hourly average profiles for grid losses in terms of megawatt-hour losses, in terms of volumes. As you can see, the blue line shows you hourly averages per each month.

The grid losses amount per each hour within each month is different across the 24 hours of the day. It actually mirrors the overall demand for electricity at system level, at national system level.

You see we have smaller grid losses amounts, grid losses volumes during the night, and we have usually a morning peak and an evening peak. That follows the shape or the profile of general electricity consumption nationwide at system level.

The dotted yellow line shows you the average price in the day-ahead market. All of this is day-ahead market data.

This is quantitative data. This is the losses volume profile, hourly profile.

At the base of each monthly chart, you can see our 60 MW baseload stack of long-term contracts. Half of that, if we consider the first, the base one between 0 and 30 MW, the other suppliers within our grid losses coverage acquisition portfolio, purchase portfolio, purchase contracts to cover grid losses, and the more transparent, the more translucent band that is on top of the base one corresponds to Nuclearelectrica.

What basically means is that we will not be having, starting 13th of August until 31st of August, 19 days, a suspension of Nuclearelectrica's commercial contractual obligation to delivery of electricity at the contractual price means that we are currently paying Nuclearelectrica roughly 100 and something euro, euros per megawatt-hour, and we'll have to replace that in the open spot market. In terms of what is the potential impact of this, of course, we cannot really provide an accurate ex-ante determination of this impact, but we can do a rough calculation.

We have 19 days between 13th of August and 31st of August when the contract with Nuclearelectrica is suspended due to force majeure. We have 19 days multiplied by 24 hours a day multiplied by 30 MW that was suspended, and we have to multiply by the difference between spot price and contractual price.

Let's just imagine what a reasonable assumption for average daily spot price will be between 13th of August and the end of August, 31st of August. If we look at average monthly prices, we see January, €140 per let us just go to prices now.

Prices, prices, prices, prices. January, €150/MWh as an average price; February, €99, roughly €100; March; April; May; June; July.

Let's look at August. We have partial data, data covering the first 14 days of August.

These are data that were retrieved from the European ENTSO-E transparency platform, the day-ahead market prices. We are currently looking at €150/MWh.

Let's just, I don't know, assume that day-ahead prices will increase further to an average of 100 and €200/MWh, or 250, let's say. We paid Nuclearelectrica 100 €100/MWh, the premium we will be paying due to our additional exposure to spot prices will be the difference between, let's say, €250/MWh and €100.

So, €150/MWh as a premium we'll have to pay during the suspension of the contract. The underlying volume is 30 MW multiplied by 19 days multiplied by 24 hours.

In the end, it comes down if we perform this calculation, the maximum, let's say, impact will be €2 million. Maybe less.

It very much depends on the assumption we use in this rough calculation, simplified calculation we are doing right now. We are anticipating the future evolution of day-ahead prices until the end of August, between 13th of August and 31st of August.

You can look at the bottom right section of this slide, just below the monthly chart for August. We also have daily prices for the 13th of August and the 14th of August, that is today.

These two days correspond to days where we have absolutely no nuclear generation injected in the system. The prices didn't rocket to above €200/MWh.

In the previous calculation we performed live here, we used an assumption of €250/MWh until the end of August. It all resulted in just €2 million as an additional total cost due to the premium between the Nuclearelectrica contractual price and potentially higher spot price of €250/MWh.

Thank you. Thank you for the detailed calculation.

One more question regarding the current energy crisis in Romania, how is this impacting Transelectrica in terms of, I don't know, you may know better, grid losses, interconnection revenues? What else should be taken into account when thinking about how the company is impacted?

Adrian Suta

I think we have to split this in direct impact and indirect impact. Obviously, direct impact on Transelectrica, we can look at grid losses.

I think we pretty much covered this topic. Obviously, if we consider also voluntary consumption reductions by populations and businesses, that will obviously have an impact in terms of lower volumes, lower tariff volumes on Transelectrica, but that is only marginal, significantly lower than the impact on grid losses that we have covered earlier.

These are basically the direct impact on Transelectrica's financials during 2026. In terms of potential activation of the special measures that have been approved by the Romanian government by issuing two governance ordinances last week, if the National Dispatch Center increases the amount of reserves, obviously there will be some additional costs in August to be able to safely handle this situation from system operations point of view, but we do not estimate significant additional costs if needed.

Then, if we switch to cross-border capacity, and in the sequence of emergency measures that had been recently approved by the government, Transelectrica, under certain very specifically defined conditions, is able to both limit the amount of cross-border capacity export capacity from Romania to neighboring countries, and under tighter and heavier energy stress, we are also able to cancel capacity that was already allocated to market traders to export electricity from Romania to the neighboring countries. That would obviously lead to a reduction in cross-border congestion income, but we do not estimate that to be material, to be significant, and to have a sizable impact on 2026 financials.

Okay. Thank you.

Regarding the investments topics, I saw quite low commissioning in the first half of the year, although you seem to have signed some contracts or new agreements regarding CAPEX. If you can make a short update regarding the key large projects that will be commissioned this year and will impact the regulated asset base starting January next year?

What can we expect there?

Adrian Suta

We expect the second half of the year to add significantly more CAPEX and finalized assets as compared to the first half of the year. I don't have accurate estimation for the second half of the year at my fingertips, but definitely it will be better than the first half of the year.

I think I might be mistaken, but I think this is actually a pattern, historical pattern. If we look at past years, I think the biggest amounts of commissioned assets and capital expenditure happen in the second half of the year.

I'm not able to provide an estimation for a full year estimation in terms of total capital expenditure and total amount of asset commissions at this point in time.

Will it at least outpace the regulated amortization?

Adrian Suta

For 2026, the regulated depreciation is definitely higher than just estimating 2026 in terms of 44 of asset commissioned in the first half multiplied by two. The order of magnitude of the annual regulatory depreciation, I think, stands below 250 million lei.

Okay. What else should be taken into account when thinking about how the tariffs might evolve next year?

We talked today about grid losses that we cannot expect a positive correction. Now in terms of regulated asset base, we can probably estimate a decrease in the regulated asset base, just because the depreciation outpacing possible commissioning of assets.

What other adjustments or corrections do you expect or do you see up to this date regarding the regulated revenues and tariff revision?

Adrian Suta

For the tariff review for the next year, for 2027, we need to take into account that a couple of things will happen. We have that special regulatory account for the extremely high difference between the extremely high gap between the actual price we paid for electricity for grid losses in 2022 during the energy crisis and the revenue allowance we had embedded into the transmission tariff in that particular year, but that is gradually is being phased out.

We have increasingly smaller amounts to recover from 2022 to 2024. It was a bigger period, a larger extended period, but most of that backlog to be recovered originates in 2022.

This is an element that we should consider in estimating 2027.

Do you have the amount of approximately how much we will recover, or do you expect to recover next year?

Adrian Suta

I don't have the exact amount at my fingertips, but it would be significantly lower than the amount that was incorporated in 2026 transmission tariff. On the other hand, we have significant negative corrections coming from 2025, mostly from grid losses.

We had a grid losses allowance, revenue allowance embedded into the regulated income approved by ANRE that was higher than the actual grid losses cost that we actually incurred in 2025. We'll be having significant negative corrections from 2025 combined with descending amounts of grid losses recovery backlog from 2022.

Our best estimate now for 2027 is that the tariff will basically remain roughly flat. Maybe a bit higher, maybe a bit increased as compared to 2026, maybe perfectly flat, or maybe just maybe even a bit lower than 2026 due to these reasons.

Thank you. Understand.

Adrian Suta

I think the baseline scenario should be that the tariffs for 2027, the transmission tariff, I think a flat assumption is the best baseline scenario.

Single digit, up to 10%, up to 5%, maybe, around plus minus?

Adrian Suta

I think that range of plus minus 10% is too large. Actually, I think that the range of plus minus 5% is also too large.

Okay. Understand.

Thank you very much for your answers.

Adrian Suta

You're welcome. Anyone else who has questions related to what has been presented during the presentation part today, or something that you would like to deep dive from the financial statements that were posted on our website this morning, we're waiting for questions.

One more from my side, if I may. I remembered to ask you about these strategic projects that you have with under Black Sea cable connecting with Georgia and the other one connecting Black Sea with Hungary.

There are two separate projects, as I see, two separate companies, joint ventures. I'd like to ask you about if you have any updates, and also what will be or what is the practice in the industry in terms of monetization of this kind of projects?

Will they fall under the regulated asset base? How will they be regulated and monetized?

Adrian Suta

Those specific questions are very valid. We don't have answers to those questions at this particular time.

Currently, both cross-border projects, and by both I refer to the Black Sea crossing connecting Romania to Georgia, but we also have a wider project, which is named the Green Energy Project. You might have heard of that one also, that is a wider project that connects the South Caucasus region, the Caspian Sea region with Central Europe, and it implies building a massive transmission corridor asset spanning from Azerbaijan to Hungary and also crossing Georgia, also Black Sea crossing, and with a landing point in Romania, and a continuation of the infrastructure of this corridor from Romania to Hungary, that is a bigger, wider project.

Both projects are currently being evaluated in terms of market benefits and costs, the ratio of benefits to cost at European level. The Black Sea submarine cable connecting Romania to Georgia is a bit more advanced as compared to the wider, larger project, but both are still under consideration.

No final investment decision has been made. Obviously, one key element or key factor into building the architecture of the project is defining how the project will be financed and how the project will be regulated in terms of how costs will be recovered.

There are basically two options, maybe a third one as well. The first option is for the whole project to be accommodated under a full regulated regime.

If we look at the magnitude, the size of the CAPEX requirement to implement this project, deploy this massive transmission corridor, it stands at above €10 billion spanning across Azerbaijan, Georgia, Black Sea, Romania, and Hungary, not only Romania obviously. I think it's safe to assume that the magnitude of funding required to implement this project is a bit outside the TSOs' league.

The Hungarian TSO, the Romanian TSO, the Georgian TSO, and the Azeri TSO, I think it's safe to say that this is something that goes beyond their capacity to fund such project. Also, I think also the national regulators in the four countries, the two Caucasus countries and the two European countries, Romania and Hungary, will probably be a bit reluctant to accommodate this massive infrastructure project under a full regulated regime as that regime will involve putting a lot of pressure on national transmission tariff in each country.

There is a second option to accommodate such project. It's commonly referred as commercial model or merchant model, and that basically involves that no CAPEX will be added to the regulatory asset base of national TSOs hosting the project.

Instead, it will be a fully private investment that will not be putting upward pressure on tariffs at all, and the investor will be recovering the capital they will invest by simply wheeling electricity, by buying and selling electricity at a higher price, buying low price in Caucasus and selling higher price in Europe, or just by collecting the cross-border congestion capacity income. That is the option that is probably going to be preferred by all national energy regulators across all the green energy corridor geographical scope: Hungary, Romania, Georgia, and Azerbaijan.

There is also a third option that is basically a mix of regulated and merchant. This is something that is currently being explored, is being thoroughly examined to find the right balance between a regulated regime and a fully merchant or a commercial regime.

It's still work in progress. All the options are still on the table, are being thoroughly analyzed.

The project has not advanced so far to a point where this particular very important topic of the project, how it will be accommodated in terms of business model and cost recovery model will be eventually defined.

Thank you.

Adrian Suta

You're welcome. In case you have any further questions and additional questions, just shoot them and we'll try to answer them as concisely and as to the point as possible.

If no further questions from your end, thank you once again for taking time to participate to Transelectrica's half-yearly analyst call, and good luck to you all. I'm sure you have a very busy period compiling information and numbers coming from several different multiple companies within the energy sector.

The next quarterly analyst call is scheduled mid-November. Once again, thank you for the interest in Transelectrica's financial results.

Good luck. You have a very busy period, and see you soon at mid-November for the third quarter release.