Cadoux Limited

Cadoux Limited

0.01
EUR
0.00
(0.00%)
-0.01EPS
11.87MMarket Cap
Mar 15Next Earn
2013 Y
2014 Y
2015 Y
2016 Y
2017 Y
2018 Y
2019 Y
2020 Y
2021 Y
2022 Y
2023 Y
2024 Y
2025 Y
Revenue per Share
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Basic EPS, GAAP
-0.02
-0.01
-0.03
-0.01
-0.01
-0.01
-0.02
-0.01
-0.01
-0.01
-0.01
-0.01
- -
Free Cash Flow per Basic Share
-0.01
-0.01
- -
-0.01
-0.01
- -
- -
- -
- -
- -
- -
- -
- -
Dividend per Share
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Book Value per Share
0.04
0.03
0.01
0.01
- -
0.03
0.02
0.02
0.05
0.05
0.04
0.03
- -
Tangible Book Value per Share
0.04
0.03
0.01
0.01
- -
0.03
0.02
0.02
0.05
0.05
0.04
0.03
- -
Basic Weighted Avg Shares
49
57
68
78
91
132
190
213
284
359
366
368
371
Sales/Revenue/Turnover
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Operating Margin (%)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Depreciation Expense
- -
- -
- -
- -
- -
- -
- -
- -
1
1
1
- -
- -
Net Income, GAAP
-1
-1
-2
-1
-1
-1
-3
-2
-3
-4
-4
-4
- -
Effective Tax Rate (%)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Profit Margin (%)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Working Capital
- -
- -
1
- -
- -
3
- -
-2
11
13
9
6
- -
LT Debt
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Total Equity
2
2
1
- -
- -
6
4
4
16
17
13
10
- -
Return on Invested Capital (%)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Return on Capital (%)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Return on Common Equity (%)
-36.08
-32.7
-129.79
-116.83
- -
- -
-59.45
-47.8
-33.29
-25.06
-28
-32.83
- -

Capital Structure

AUD

•

in mil. unless spec.
No data availableFinancial data will appear here once available

Working Capital

AUD

•

in mil. unless spec.
No data availableFinancial data will appear here once available

Growth Rates

AUD

•

in mil. unless spec.

(avg. rate of change)

10 years
5 years
1 year
Total Equity
- -
- -
- -
Free Cash Flow
- -
- -
- -
Net Income, GAAP
- -
- -
- -
Sales/Revenue/Turnover
- -
- -
- -
Total Cash Common Dividend
- -
- -
- -

Semi-annual Revenue

AUD

•

in mil. unless spec.

Year

H1
H2
FY
2023
- -
- -
- -
2024
- -
- -
- -
2025
- -
- -
- -

Semi-annual Earnings Per Share

AUD

•

in mil. unless spec.

Year

H1
H2
FY
2023
- -
- -
-0.01
2024
- -
- -
-0.01
2025
- -
- -
- -

Semi-annual Dividends Per Share

AUD

•

in mil. unless spec.

Year

H1
H2
FY
2023
- -
- -
- -
2024
- -
- -
- -
2025
- -
- -
- -

Company Description

CEO
Roland Hill
Full Time Employees
1
Sector
Non-energy minerals
Industry
Other metals/Minerals
Address
49 Ord Street Cottesloe WA Australia 6005
IPO Date
Jan 20, 1994
Business
Cadoux Limited (ASX:CCM; OTC:FYIRF), an Australian critical minerals company founded in 1993 and headquartered at 49 Ord Street, West Perth, Australia, focuses on the exploration, evaluation, and development of high-purity alumina (HPA) and rare earth projects to supply the electric vehicle, LED lighting, semiconductor, and high-tech sectors; its core assets include the 100%-owned Cadoux kaolin deposit in Western Australia for producing ultra-high purity 4N (99.99%) and 5N (99.999%) HPA products used in battery separators, LED substrates, and precision polishing applications such as microchip wafers; and the Minhub mineral sands processing and rare earths facility in Darwin, Northern Territory, designed to upgrade third-party heavy mineral sands feedstocks into rare earth-rich xenotime and monazite concentrates for magnets and other advanced materials, with operations targeting Australia and Southeast Asia including potash concessions in Thailand. The company rebranded from FYI Resources Limited to Cadoux Limited in December 2023 to reflect its strategic emphasis on critical minerals development; in May 2024, it acquired a 50% stake in Minhub Operations Pty Ltd from Arafura Rare Earths Limited (ASX:ARU), assuming full funding responsibility through the project's feasibility study completion expected in late 2024, while advancing front-end engineering and design (FEED) for a small-scale HPA demonstration plant at Kwinana, Western Australia, led by GR Engineering Services with milestones including process flow diagrams, equipment specifications, and environmental assessments; as of November 2025, Cadoux continues HPA progress with engineering studies and market development, alongside Minhub feasibility enhancements by IHC Mining, renewing offtake discussions with partners like Gippsland Critical Minerals, and maintaining top ESG ratings amid strong demand forecasts for HPA growing over 30% annually through 2028.