- CEO
- Vincent Saputra
- Full Time Employees
- 992
- Sector
- Energy minerals
- Industry
- Coal
- Address
- West Jakarta Indonesia
- IPO Date
- Jul 31, 2023
- Business
- PT Royaltama Mulia Kontraktorindo Tbk is an Indonesia-based mining services contractor and heavy equipment rental provider specializing in integrated operational support, civil engineering, and logistics infrastructure for the coal industry. Founded in 2017 and headquartered in West Jakarta, Indonesia, the company operates as part of the RMK Group alongside affiliates including PT RMK Energy Tbk and maintains operating subsidiaries such as PT Royaltama Mulia Beton and PT Royaltama Mulia Konstruksi. PT Royaltama Mulia Kontraktorindo Tbk delivers comprehensive mining lifecycle solutions across several core segments: mining contracting services, including land clearing, topsoil stripping, overburden removal, coal getting, and pit dewatering; infrastructure preparation and civil engineering, covering the design, development, and maintenance of dedicated mine haul roads, transport corridors, and industrial site facilities; coal hauling and logistics support, encompassing fleet dispatch and heavy-duty transport; coal processing and emplacement facility operations, comprising coal crushing plant (CCP) management, stockpile maintenance, dump truck loading, train loading system (TLS) operations, and barge loading facilitation; and heavy equipment rental, providing leasing, maintenance, and operator support for earthmoving machinery, excavators, bulldozers, articulated dump trucks, motor graders, wheel loaders, and crushing equipment. The company concentrates its operational footprint primarily in the coal-producing regions of South Sumatra, serving domestic mining concessionaires and energy infrastructure operators. In recent developments, PT Royaltama Mulia Kontraktorindo Tbk completed its initial public offering on the Indonesia Stock Exchange in July 2023 under the ticker RMKO, securing IDR 112.5 billion in gross proceeds to fund fleet maintenance, capital expenditures, and operational working capital. The company expanded beyond its foundational operational contract with affiliate PT Truba Bara Banyu Enim by entering into a strategic IDR 61 billion infrastructure development and service partnership with PT Atlas Resources Tbk subsidiary PT Gorby Putra Utama to construct, operate, and manage two coal crushing plants with targeted monthly throughput of 400,000 metric tons over a 60-month term. Furthermore, the company completed key integrated coal hauling road connections in South Sumatra to drive logistics efficiency and scale third-party contract volumes.