•
in mil. unless spec.•
in mil. unless spec.•
in mil. unless spec.•
in mil. unless spec.•
in mil. unless spec.•
in mil. unless spec.Sitka Drills 236.0 Metres of 1.15 g/t Gold, Including 71.0 Metres of 2.79 g/t Gold and 36.3 Metres of 3.31 g/t Gold, at the Saddle Zone and Continues to Expand the Eiger Deposit at Its RC Gold Project, Yukon
Sitka Gold Strengthens Board of Directors with Appointment of Samantha Shorter
Sitka Confirms High-Grade Gold Zone at Blackjack with 141.5 Metres of 1.93 g/t Gold, Including 80.6 Metres of 3.20 g/t Gold and 6.0 Metres of 9.46 g/t Gold, and Expands Near-Surface Mineralization Across 550 Metres Within the Blackjack Resource Pit at Its RC Gold Project, Yukon
Sitka Drills 159.2 Metres of 1.14 g/t Gold, Including 7.3 Metres of 8.89 g/t Gold, Within 256.9 Metres of 0.84 g/t Gold, Intercepts 13.9 Metres of 0.383% WO3 (Tungsten Trioxide) and Continues to Expand the Rhosgobel Deposit Along Strike and at Depth at Its RC Gold Project, Yukon
Sitka Gold Completes Acquisition of 100% Interest in the Clear Creek Property at Its RC Gold Project, Yukon
Sitka Drills 218.6 Metres of 1.25 g/t Gold, Including 44.4 Metres of 3.86 g/t Gold, and a Second Interval of 92.7 Metres of 1.14 g/t Gold in a Single Hole at Its RC Gold Project, Yukon
Sitka Gold to Accelerate Acquisition of 100% Interest in the Clear Creek Property at Its RC Gold Project, Yukon
Sitka Drills 164.0 Metres of 1.83 g/t Gold Including 45.0 Metres of 3.49 g/t Gold and 2.0 Metres of 15.35 g/t Gold at Its RC Gold Project, Yukon
Sitka Files Technical Report
Sitka Continues to Expand High-Grade Gold Mineralization at the Blackjack Deposit, Drilling 94.5 Metres of 1.62 g/t Gold, Including 2.0 Metres of 11.85 g/t Gold, and an Additional Interval of 197.0 Metres of 1.06 g/t Gold, Including 2.0 Metres of 9.95 g/t Gold, in Hole 125 at Its RC Gold Project, Yukon
Sitka Drills 19.3 Metres of 5.04 g/t Gold Within 94.0 m of 1.79 g/t Gold, Expanding High-Grade Gold Zone at the Blackjack Deposit, RC Gold Project, Yukon
Sitka Gold Updates Rhosgobel Gold Deposit Mineral Resource Estimate to Include Tungsten and Silver
The Yukon's Capital Cycle Has Turned -- and This 18-Project Junior Is Quietly Building the Next District-Scale Story
Sitka Reports 94.3% Gold Recovery and 84.7% Tungsten Recovery from Metallurgical Testing at the Rhosgobel Deposit at Its Rc Gold Project, Yukon
Sitka Provides Update on the 2026 Diamond Drilling Program Underway at Its RC Gold Project, Yukon
Sitka Gold Confirms Significant Tungsten Mineralization Within the Rhosgobel Gold Deposit, Including 128.0 Metres of 0.115% WO3, at Its RC Gold Project, Yukon
Sitka Gold Files Technical Report for Expanded Mineral Resource Estimate at the RC Gold Project, Yukon
Sitka Gold Strengthens Board of Directors with Appointment of Caroline Hendrick
Sitka Gold Announces Plan to Spin-Out Its Nevada and Arizona Gold and Silver Assets to Focus on Advancing Its New Multi-Million Ounce Gold Discovery at Its Flagship RC Gold Project in Yukon
Sitka Gold Announces Maiden Resource Estimate at Its Rhosgobel Gold Deposit and Expands Total Mineral Resource Estimate at the RC Gold Project, Yukon
Already premium?