- CEO
- Kjetel Digre
- Full Time Employees
- 11,818
- Sector
- Utilities
- Industry
- Independent Power Producers
- Address
- Oksenøyveien 8 Lysaker AK Norway 1366
- IPO Date
- Jan 17, 2017
- Business
- Aker Solutions ASA provides integrated engineering, products, and services to the global energy industry, focusing on low-carbon oil and gas production, renewables, and decarbonization technologies. Founded in 1841 and headquartered in Fornebu, Norway, the company operates through three main segments: Renewables and Field Development, which designs and delivers offshore wind, hydrogen, and carbon capture, utilization, and storage (CCUS) solutions; Electrification, Maintenance and Modifications (EMM), which optimizes field life with maintenance, modifications, electrification, and decarbonization services for offshore and onshore facilities; and Subsea, which supplies intelligent subsea production systems, trees, control systems, manifolds, umbilicals, processing technologies, tie-in systems, wellheads, and lifecycle services. Its core offerings encompass subsea production equipment, low-carbon oil and gas solutions, offshore wind-to-grid infrastructure, CO2 capture and sequestration systems, decommissioning services, marine operations, hydropower upgrades, robotics, autonomous drones, and digital project execution technologies; the company serves oil and gas operators, renewable energy developers, and industrial clients across Norway, the United States, Brazil, the United Kingdom, Canada, Brunei, and other regions worldwide. Recent developments include a six-year maintenance and modifications frame agreement with ConocoPhillips Skandinavia AS (November 2025), a five-year brownfield services contract with ExxonMobil Canada (November 2025), extension of Equinor's inspection services contract in Norway (November 2025), a memorandum of understanding with Nordbex for offshore wind (October 2025), Europe's first full beyond-visual-line-of-sight (BVLOS) drone certification (September 2025), a contract for the BalWin2 offshore wind project (May 2025), changes to the executive management team (December 2025 and August 2025), and delivery of a record-breaking offshore HVDC station for the East Anglia THREE wind farm (October 2025).