Doosan Skoda Power AS

Doosan Skoda Power AS

17.74
EUR
-0.76
(-4.11%)
546.28MMarket Cap
Mar 03Next Earn
2021 Y
2022 Y
2023 Y
2024 Y
2025 Y
TTM
Revenue per Share
111.17
128.93
150.81
185.6
177.89
- -
Basic EPS, GAAP
5.93
18.05
17.53
20.68
16.47
- -
Free Cash Flow per Basic Share
21.67
22.58
27.16
5.34
18.57
- -
Dividend per Share
7.21
7.84
68.82
14.94
9.83
- -
Book Value per Share
226.1
237.99
185.83
131.65
152.68
152.68
Tangible Book Value per Share
188.59
199.67
146.3
91.15
111.72
111.72
Basic Weighted Avg Shares
32
32
32
32
32
32
Sales/Revenue/Turnover
3,546
4,113
4,811
5,921
5,632
- -
Operating Margin (%)
4.41
5.94
7.29
11.02
10.05
- -
Depreciation Expense
234
182
166
169
178
- -
Net Income, GAAP
189
576
559
660
521
- -
Effective Tax Rate (%)
13.61
21.15
25.43
25.35
21.71
- -
Profit Margin (%)
5.34
14
11.63
11.14
9.26
- -
Working Capital
4,661
5,067
3,390
1,900
2,516
2,516
LT Debt
8
7
10
13
11
11
Total Equity
7,213
7,592
5,928
4,200
4,871
4,871
Return on Invested Capital (%)
- -
5.12
5.46
9.32
11.23
- -
Return on Capital (%)
- -
7.79
8.27
13
11.45
- -
Return on Common Equity (%)
- -
7.78
8.27
13.03
11.5
- -

Capital Structure

CZK

•

in mil. unless spec.
Dec'24
Jun'25
Dec'25
ST Debt
8
8
9
LT Borrowings
- -
- -
- -
LT Finance Leases
13
- -
11
Preferred Equity and Hybrid Capital
- -
- -
- -
Shares Outstanding
32
32
32
Market Capitalization
- -
10,592
13,204

Working Capital

CZK

•

in mil. unless spec.
Dec'24
Jun'25
Dec'25
Total Current Assets
4,519
5,127
5,620
Cash, Cash Equivalents & STI
1,027
1,151
1,857
Accounts Receivable, Net
1,234
1,325
1,125
Inventories
130
158
158
Total Current Liabilities
2,619
2,935
3,104
Payables & Accruals
- -
- -
- -
ST Debt
8
8
9
Deferred Revenue
- -
- -
- -

Growth Rates

CZK

•

in mil. unless spec.

(avg. rate of change)

10 years
5 years
1 year
Total Equity
- -
- -
15.97%
Free Cash Flow
- -
- -
245.29%
Net Income, GAAP
- -
- -
-20.97%
Sales/Revenue/Turnover
- -
- -
-4.88%
Total Cash Common Dividend
- -
- -
-34.66%

Semi-annual Revenue

CZK

•

in mil. unless spec.

Year

H1
H2
FY
2023
- -
1,656
4,811
2024
- -
- -
5,921
2025
- -
- -
5,632

Semi-annual Earnings Per Share

CZK

•

in mil. unless spec.

Year

H1
H2
FY
2023
- -
6.97
17.53
2024
- -
- -
20.68
2025
- -
- -
16.47

Semi-annual Dividends Per Share

CZK

•

in mil. unless spec.

Year

H1
H2
FY
2023
- -
- -
68.82
2024
- -
- -
14.94
2025
- -
- -
9.83

Company Description

CEO
Youngki Lim
Full Time Employees
1,067
Sector
Producer manufacturing
Industry
Electrical products
Address
Tylova 1/57 Plzen Czech Republic 30128
IPO Date
Feb 3, 2025
Business
Doosan Skoda Power a.s. (DSPW.PR) manufactures and supplies steam turbines and turbo-generator systems for power generation applications worldwide. The company, founded in 1869 and headquartered in Plzen, Czech Republic, designs customized steam turbines ranging from 3 MW to 1,300 MW; produces high- and low-pressure turbine sections, including condensing, back-pressure, and reheating types; and provides comprehensive engineering, procurement, and construction services for thermal, nuclear, cogeneration, waste-to-energy, biomass, and renewable energy plants, with additional offerings in OEM and non-OEM maintenance, modernizations, retrofits, spare parts, and lifetime extension solutions. As a subsidiary of South Korea's Doosan Group since 2009, it operates globally across Europe, Asia, the Americas, Africa, and Australia, serving utilities, industrial clients, and energy firms such as CEZ, EPH, and Orlen with approximately 1,013 employees. Recent developments include its February 2025 listing on the Prague Stock Exchange following an initial public offering that raised funds for nuclear energy expansion, including small modular reactors; a September 2025 contract win valued at several billion Czech koruna with CEZ to replace generators at the Temelin Nuclear Power Plant units 1 and 2, including 15-year maintenance; an October 2025 letter of intent with I&C Energo for collaboration on the Temelin project and potential Dukovany new units; and a 2025 contract for the third turbine (TG6, second heating stage) modernization at Opatovice Power Plant to support cogeneration and decarbonization, building on prior TG3 and TG5 deliveries.